Data centers in Chantilly, Virginia
Draft research: figures were traced to their sources by an AI research agent and have not passed verification yet.
Data Center Fact Check tracks 4 data center projects in Chantilly, Virginia as of November 2026: 3 operating and 1 stage not known, totaling about 103 MW announced where a figure is published.
Chantilly has 4 tracked data centers. Their announced capacity totals about 103 MW where a figure is published. Of those, 3 operating; the stage of the other 1 is not known yet. Every figure comes from the public record linked on this page.
Data center projects in Chantilly
- Amazon IAD-61 (43673 John Mosby Highway, Chantilly)
OperatingChantilly
- H5 Data Centers Chantilly
OperatingChantilly23 MW announced
- Stream Data Centers NoVA I / II (Northern Virginia)
OperatingChantilly80 MW announced
- The Aerospace Corporation
Stage not knownChantilly
Who serves this place
- Not collected yet.
More places in Fairfax County
Chantilly is part of Fairfax County.
Nearby places
- Herndon6 data center projects tracked
- McLean4 data center projects tracked
- Reston4 data center projects tracked
- Fort Belvoir1 data center project tracked
- Springfield1 data center project tracked
- Vienna1 data center project tracked
Court cases and commission dockets in Virginia (15)
Bills and laws in Virginia
- HB 2578 · Died or failedAdds clean energy conditions to the data center tax break
- HB 2027 · Died or failedRequires a state certificate to operate large power users
- SB 843 · Filed · Oct 9, 2026Bars new data center approvals statewide for three years
- EO 22 · In effect · Sep 18, 2026Sets Virginia data center standards and bans secret project agreements
- HB 30 · In effect · Jul 1, 2026Budget act item taxing data center electricity at 1.1 cents per kWh
- HB 1393 · Signed into law · May 14, 2026Shifts grid costs to the largest electricity customers
- HB 153 · Signed into law · Apr 13, 2026Requires site assessments before local approval of large data centers
- HB 323 · Signed into law · Apr 13, 2026Directs a state study of data center waste heat
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
Questions people ask
- How many data centers are in Chantilly?
- Data Center Fact Check tracks 4 data center projects in Chantilly as of November 2026. Of those, 3 operating; the stage of the other 1 is not known yet.
- What is the biggest data center in Chantilly?
- By announced capacity, the biggest data center in Chantilly is Stream Data Centers NoVA I / II (Northern Virginia), announced at 80 MW. It is operating.
- How much power do data centers in Chantilly use?
- The 4 projects tracked in Chantilly have announced about 103 MW of capacity in total, where a figure is published. That is announced capacity, not measured electricity use.
Sources
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "Chantilly." Accessed 2026-11-29. https://datacenterfactcheck.org/places/us-va-chantilly
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page