Data centers in McLean, Virginia
Draft research: figures were traced to their sources by an AI research agent and have not passed verification yet.
Data Center Fact Check tracks 4 data center projects in McLean, Virginia as of November 2026: 3 stage not known and 1 operating, totaling about 3 MW announced where a figure is published.
McLean has 4 tracked data centers. Their announced capacity totals about 3 MW where a figure is published. Of those, 1 operating; the stage of the other 3 is not known yet. Every figure comes from the public record linked on this page.
Data center projects in McLean
- DataBank IAD2 (Northern Virginia)
OperatingMcLean3 MW announced
- Northrop Grumman Systems Corporation
Stage not knownMcLean
- Valo Park
Stage not knownMcLean
- Zayo Group LLC (Fairfax County)
Stage not knownMcLean
Who serves this place
- Not collected yet.
More places in Fairfax County
McLean is part of Fairfax County.
Nearby places
- Herndon6 data center projects tracked
- Chantilly4 data center projects tracked
- Reston4 data center projects tracked
- Fort Belvoir1 data center project tracked
- Springfield1 data center project tracked
- Vienna1 data center project tracked
Court cases and commission dockets in Virginia (15)
Bills and laws in Virginia
- HB 2578 · Died or failedAdds clean energy conditions to the data center tax break
- HB 2027 · Died or failedRequires a state certificate to operate large power users
- SB 843 · Filed · Oct 9, 2026Bars new data center approvals statewide for three years
- EO 22 · In effect · Sep 18, 2026Sets Virginia data center standards and bans secret project agreements
- HB 30 · In effect · Jul 1, 2026Budget act item taxing data center electricity at 1.1 cents per kWh
- HB 1393 · Signed into law · May 14, 2026Shifts grid costs to the largest electricity customers
- HB 153 · Signed into law · Apr 13, 2026Requires site assessments before local approval of large data centers
- HB 323 · Signed into law · Apr 13, 2026Directs a state study of data center waste heat
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
Questions people ask
- How many data centers are in McLean?
- Data Center Fact Check tracks 4 data center projects in McLean as of November 2026. Of those, 1 operating; the stage of the other 3 is not known yet.
- What is the biggest data center in McLean?
- By announced capacity, the biggest data center in McLean is DataBank IAD2 (Northern Virginia), announced at 3 MW. It is operating.
- How much power do data centers in McLean use?
- The 4 projects tracked in McLean have announced about 3 MW of capacity in total, where a figure is published. That is announced capacity, not measured electricity use.
Sources
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "McLean." Accessed 2026-11-29. https://datacenterfactcheck.org/places/us-va-mclean
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page