Data centers in Sandston, Virginia
Draft research: figures were traced to their sources by an AI research agent and have not passed verification yet.
Data Center Fact Check tracks 9 data center projects in Sandston, Virginia as of November 2026: 4 operating, 3 proposed and 1 approved, totaling about 200 MW announced where a figure is published.
Sandston has 9 tracked data centers. Their announced capacity totals about 200 MW where a figure is published. Of those, 4 operating, 3 proposed and 1 approved. Every project we track here is listed below, with the public records behind it. Every figure comes from the public record linked on this page.
Data center projects in Sandston
- Bank of America Sandston Data Center
OperatingSandston
- Iron Mountain Richmond Data Center Campus
Under constructionSandston200 MW announced
- Meta Henrico Data Center
OperatingSandston
- QTS RIC5
ApprovedSandston
- QTS Richmond 1 (Sandston)
OperatingSandston
- QTS Richmond 2 (Sandston; listed as in development)
ProposedSandston
- QTS Richmond 3 (Sandston; listed as in development)
ProposedSandston
- QTS Richmond 5 (Sandston; listed as in development)
ProposedSandston
- QTS Richmond Data Center
OperatingSandston
Who serves this place
- Not collected yet.
More places in Henrico County
Sandston is part of Henrico County.
Nearby places
- Glen Allen1 data center project tracked
Court cases and commission dockets in Virginia (15)
Bills and laws in Virginia
- HB 2578 · Died or failedAdds clean energy conditions to the data center tax break
- HB 2027 · Died or failedRequires a state certificate to operate large power users
- SB 843 · Filed · Oct 9, 2026Bars new data center approvals statewide for three years
- EO 22 · In effect · Sep 18, 2026Sets Virginia data center standards and bans secret project agreements
- HB 30 · In effect · Jul 1, 2026Budget act item taxing data center electricity at 1.1 cents per kWh
- HB 1393 · Signed into law · May 14, 2026Shifts grid costs to the largest electricity customers
- HB 153 · Signed into law · Apr 13, 2026Requires site assessments before local approval of large data centers
- HB 323 · Signed into law · Apr 13, 2026Directs a state study of data center waste heat
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
Questions people ask
- How many data centers are in Sandston?
- Data Center Fact Check tracks 9 data center projects in Sandston as of November 2026. Of those, 4 operating, 3 proposed and 1 approved.
- What is the biggest data center in Sandston?
- By announced capacity, the biggest data center in Sandston is Iron Mountain Richmond Data Center Campus, announced at 200 MW. It is under construction.
- How much power do data centers in Sandston use?
- The 9 projects tracked in Sandston have announced about 200 MW of capacity in total, where a figure is published. That is announced capacity, not measured electricity use.
Sources
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "Sandston." Accessed 2026-11-29. https://datacenterfactcheck.org/places/us-va-sandston
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page