State Card
Data centers in Ohio
Draft research: figures were traced to their sources by an AI research agent and have not passed verification yet.
Data Center Fact Check tracks 51 data center projects in Ohio as of November 2026: 21 operating, 13 under construction and 6 proposed, totaling about 9,679 MW announced where a figure is published.
Ohio has 51 tracked data centers. Their announced capacity totals about 9,679 MW where a figure is published. Of those, 21 operating, 13 under construction and 6 proposed. Every project we track here is listed below, with the public records behind it. Every figure comes from the public record linked on this page.
Cologix Columbus (Scherers Court) video · 1 min 4 sec
Data center projects in Ohio
- Aligned Conesville campus
Under constructionConesville
- Aligned Data Centers CMH-02 (Conesville)
Under constructionConesville
- Aligned Data Centers NEO-01 (Sandusky)
OperatingSandusky
- Aligned NEO-01 Perkins Township campus
Under constructionSandusky
- Amazon Sunbury Campus
PausedSunbury
- Amazon Web Services Dublin campus
OperatingDublin
- Amazon Web Services Hilliard campus
OperatingHilliard
- Amazon Web Services New Albany campus (2015)
Operating
- Amazon Web Services New Albany expansion (2023)
Expanding
- AWS Fayette County data center
Approved
- AWS Marysville data center
ApprovedMarysville
- Centersquare CMH1 (Columbus)
Operating
- Cologix COL4 (Columbus)
OperatingColumbus33 MW announced
- Cologix COL5 (Columbus)
ProposedColumbus25 MW announced
- Cologix COL7 (Columbus)
OperatingJohnstown50 MW announced
- Cologix COL8 (Columbus)
OperatingJohnstown21 MW announced
- Cologix Columbus (Scherers Court)
OperatingColumbus
- Cologix Johnstown campus
Under constructionJohnstown800 MW announced
- Cologix Orange Township campus
Announced
- CyrusOne CIN5 / CIN7 (Lebanon)
OperatingLebanon
- CyrusOne Cincinnati
OperatingCincinnati
- CyrusOne Cincinnati CIN2
OperatingCincinnati
- CyrusOne New Albany
ApprovedNew Albany
- DataBank CLE1 (Cleveland)
OperatingCleveland0 MW announced
- EdgeConneX New Albany campus
Under constructionNew Albany
- Edged New Albany data center
OperatingNew Albany24 MW announced
- Expedient Dublin
OperatingDublin
- Expedient Upper Arlington
OperatingUpper Arlington
- Google Columbus data center
OperatingColumbus
- Google Franklin Furnace data center
ProposedFranklin Furnace
- Google Lancaster data center
ExpandingLancaster
- Google Lima data center
Under construction
- Google New Albany data center
OperatingNew Albany
- Karis Critical Smart Farm (New Albany)
ProposedNew Albany
- Meta New Albany Data Center
OperatingNew Albany
- Microsoft Heath data center
Under constructionHeath
- Microsoft Hebron data center
Under constructionHebron
- Microsoft New Albany data center
Under constructionNew Albany
- Microsoft Perry Township data center site
Cancelled
- PORTS-Pike Technology Campus
Announced8,000 MW announced
- QTS New Albany 1 campus
Under constructionNew Albany
- QTS New Albany 1 (New Albany; listed as in development)
ProposedNew Albany144 MW announced
- QTS New Albany 2 campus
Under constructionNew Albany
- QTS New Albany 2 (New Albany; listed as in development)
ProposedNew Albany78 MW announced
- QTS Van Wert campus
Under constructionVan Wert
- QTS Van Wert (Van Wert; listed as in development)
ProposedVan Wert
- STACK Infrastructure NAL01 (New Albany)
OperatingNew Albany60 MW announced
- STACK NAL01 New Albany campus
ExpandingNew Albany60 MW announced
- Vantage Data Centers Millersport
ApprovedMillersport
- Vantage Data Centers New Albany Campus (New Albany)
OperatingNew Albany192 MW announced
All 51 projects tracked in Ohio
On our research list, details coming soon
An official list names these projects here. Their pages open at these addresses once the details are checked against the original records.
- AEP
Details coming soonAEP
- Ark Data
Details coming soonArk Data
- Cleveland Tech Holdings (H5 Rockwell)
Details coming soonCleveland Tech Holdings (H5 Rockwell)
- Constant Company
Details coming soonConstant Company
- Crusoe Energy Systems
Details coming soonCrusoe Energy Systems
- Kroger
Details coming soonKroger
- Ohio River Partners
Details coming soonOhio River Partners
- Progressive Insurance
Details coming soonProgressive Insurance
Who serves this place
- Not collected yet.
Counties and cities in Ohio
Counties
- Allen County2 data center projects tracked
- Coshocton County2 data center projects tracked
- Cuyahoga County1 data center project tracked
- Delaware County3 data center projects tracked
- Erie County2 data center projects tracked
- Fairfield County2 data center projects tracked
- Fayette County1 data center project tracked
- Franklin County10 data center projects tracked
- Hamilton County2 data center projects tracked
- Licking County20 data center projects tracked
- Pike County1 data center project tracked
- Scioto County1 data center project tracked
- Union County1 data center project tracked
- Van Wert County2 data center projects tracked
- Warren County1 data center project tracked
Cities and towns
- New Albany15 data center projects tracked
- Columbus4 data center projects tracked
- Johnstown3 data center projects tracked
- Cincinnati2 data center projects tracked
- Conesville2 data center projects tracked
- Dublin2 data center projects tracked
- Sandusky2 data center projects tracked
- Van Wert2 data center projects tracked
- Cleveland1 data center project tracked
- Franklin Furnace1 data center project tracked
- Heath1 data center project tracked
- Hebron1 data center project tracked
- Hilliard1 data center project tracked
- Lancaster1 data center project tracked
- Lebanon1 data center project tracked
- Marysville1 data center project tracked
- Millersport1 data center project tracked
- Sunbury1 data center project tracked
- Upper Arlington1 data center project tracked
For homeowners
What the projects here mean if you live nearby
Each fact says which way it runs: comes to the community (such as tax paid), comes from the community (such as water or a tax break), or goes both ways. The labels show direction, not whether it is good or bad. How we work
Property tax
Amazon Web Services New Albany campus (2015):AWS paid $3.1 million in property taxes and fees in Licking County in 2024; Hilliard abates its buildings' taxes under a CRA deal.
Comes to the communityMeta New Albany Data Center:The city abates 100 percent of this campus's real property taxes for 15 years under a 2017 agreement.
Comes to the communityGoogle New Albany data center:A city property tax abatement for this campus was reported in 2018; its agreement is not in our records.
Not known yet
Tax breaks
Google New Albany data center:The state gave this project a 100 percent sales tax exemption on data center equipment.
Comes to the communityAmazon Web Services New Albany campus (2015):The state gave Vadata a 100 percent sales tax exemption in 2014, running through 2055, covering AWS equipment purchases statewide.
Comes to the communityMeta New Albany Data Center:The state gave this project a 100 percent sales tax exemption on data center equipment, approved in 2017.
Comes to the community
Money for schools and services
Meta New Albany Data Center:Meta says it has directed over $7.8 million in community grants and sponsorships across Franklin and Licking counties since 2017.
Comes to the communityAmazon Web Services New Albany campus (2015):AWS says it invested $10.3 billion in Ohio from 2015 to 2023 and supports more than 4,760 jobs annually statewide.
Comes from the communityGoogle New Albany data center:No community payment or fee for this campus is in our records.
Not known yet
Electricity bill
Amazon Web Services New Albany campus (2015):AEP Ohio serves these campuses; state filings put the Hilliard campus's current electric load at 328 megawatts.
Comes from the communityMeta New Albany Data Center:AEP Ohio supplies this campus from the grid; since 2025 a 200 MW on-site gas plant also feeds it behind the meter.
Comes from the communityGoogle New Albany data center:AEP Ohio provides electric service to this campus; permanent service was energized in March 2020.
Comes from the community
Water
Google New Albany data center:Columbus supplies New Albany's water; Google reported this campus withdrew 1,008.1 million gallons in 2025.
Comes from the communityMeta New Albany Data Center:Columbus supplies the city's water and the city sewers this campus; Meta reported withdrawing 86 million liters in 2024.
Comes from the communityAmazon Web Services New Albany campus (2015):No record collected names a water provider or water use figure for these campuses; the Hilliard power plant needs no large-scale cooling water.
Not known yet
Jobs
Amazon Web Services New Albany campus (2015):State announcements project hundreds of new jobs from the $7.8 billion expansion; JobsOhio put the figure at 230 direct jobs.
Not known yetGoogle New Albany data center:Job counts for this campus are projections from 2018 to 2020, not a measured headcount.
Not known yetMeta New Albany Data Center:Meta says the campus supports over 300 operational jobs; the 2017 announcement projected about 100.
Comes from the community
Next door: height, setbacks, noise
Amazon Web Services New Albany campus (2015):Hilliard approved height and fencing variances for the Amazon complex in 2022, allowing buildings up to 63 feet tall.
Not known yetNo siting, setback, or noise rule for this campus is in our records yet.Applies to 2 projects:Google New Albany data centerMeta New Albany Data Center
Not known yet
Your say
Amazon Web Services New Albany campus (2015):Hilliard's council voted unanimously in October 2025 to appeal the state air permit for the fuel cells at Amazon's campus.
Not known yetGoogle New Albany data center:State and city approvals for this campus happened in December 2018; no member vote record is in our records.
Not known yetMeta New Albany Data Center:New Albany's council approved this campus's tax agreements on July 31, 2017, recorded as six yes votes with no roll call.
How to take part
Tax breaks and payments
2017 · Meta New Albany Data Center
Community Reinvestment Area property tax abatement (Ohio Rev. Code Sections 3735.65 to 3735.671)
100% real property tax abatement for 15 years in the Oak Grove II Community Reinvestment Area, authorized by Resolution R-32-2017 together with a Tax Increment Financing Agreement and a Development Agreement. In exchange, Sidecat committed to minimum annual revenue payments to the city of $700,000 beginning in 2021, rising to $1.4 million by 2023, and the agreements waived up to $250,000 in building and permitting fees. Under the TIF, the school districts and the fire department receive the amounts they would ordinarily receive.
All tax records for Meta New Albany Data CenterAmazon Web Services Hilliard campus
Community Reinvestment Area property tax abatement (Ohio Rev. Code Sections 3735.65 to 3735.671)
The City of Hilliard states it has a Community Reinvestment Area (CRA) agreement with Amazon that abates property taxes for data center buildings. The CRA required Amazon to make a total investment of $200 million by Dec. 31, 2026. The Hilliard School District receives up to $3.4 million annually ($400,000 plus $1.50 per square foot of building, with up to two million square feet planned) for the term of the agreement. The city states Amazon has met and/or exceeded all of these requirements.
All tax records for Amazon Web Services Hilliard campus2014 · Amazon Web Services New Albany campus (2015)
Sales and use tax exemption (Ohio Rev. Code Section 122.175)
100% exemption from the state and county sales and use taxes (Rev. Code Chapters 5739 and 5741) on computer data center equipment. The Department of Development summary records the term as 8/25/2014 to 12/31/2055 (up to 40 years; current term stated as 40 years) and the locations as statewide, not limited to specific campuses.
All tax records for Amazon Web Services New Albany campus (2015)Sales and use tax exemption (Ohio Rev. Code Section 122.175)
The Ohio Tax Credit Authority may completely or partially exempt, by agreement, the state sales and use taxes (Rev. Code Chapters 5739 and 5741) on the sale, storage, use, or other consumption of computer data center equipment used at an eligible computer data center, including charges for delivery, installation, or repair of the equipment. The exemption runs for the term of the agreement; the statute sets no fixed term.
2018 · Google New Albany data center
Sales and use tax exemption (Ohio Rev. Code Section 122.175)
100% exemption from the state and county sales and use taxes (Rev. Code Chapters 5739 and 5741) on computer data center equipment. The Department of Development summary records the term as 10/31/2018 to 10/30/2058 (up to 40 years with extensions; current term stated as 20 years) and the locations as statewide, not limited to the New Albany site.
All tax records for Google New Albany data center2017 · Meta New Albany Data Center
Sales and use tax exemption (Ohio Rev. Code Section 122.175)
100% exemption from the state and county sales and use taxes (Rev. Code Chapters 5739 and 5741) on computer data center equipment. The Department of Development summary records the term as 1/1/2017 to 12/31/2056 (up to 40 years with extensions; current term stated as 20 years) and the locations as statewide, not limited to the New Albany site.
All tax records for Meta New Albany Data Center2025 · EdgeConneX New Albany campus
Sales and use tax exemption (Ohio Rev. Code Section 122.175)
50% exemption from the state and county sales and use taxes on computer data center equipment, term 1/1/2026 to 12/31/2035.
All tax records for EdgeConneX New Albany campusAmazon Sunbury Campus
Community Reinvestment Area property tax abatement (Ohio Rev. Code Sections 3735.65 to 3735.671)
City of Sunbury CRA property tax exemption of 87.5% for the first 15 years and 75% for another 15 years, offered for each building constructed at the project site, as the city's FAQ states the offer.
All tax records for Amazon Sunbury Campus2025 · Vantage Data Centers Millersport
Sales and use tax exemption (Ohio Rev. Code Section 122.175)
50% exemption from the state and county sales and use taxes on computer data center equipment, term 1/1/2026 to 12/31/2035.
All tax records for Vantage Data Centers Millersport2023 · QTS New Albany 1 campus
Sales and use tax exemption (Ohio Rev. Code Section 122.175)
100% exemption from the state and county sales and use taxes on computer data center equipment, term 1/1/2024 to 12/31/2038.
All tax records for QTS New Albany 1 campus2022 · Cologix Orange Township campus
Sales and use tax exemption (Ohio Rev. Code Section 122.175)
75% exemption from the state and county sales and use taxes on computer data center equipment, term 1/1/2023 to 12/31/2032.
All tax records for Cologix Orange Township campus2024 · Vantage OH1 New Albany campus
Sales and use tax exemption (Ohio Rev. Code Section 122.175)
50% exemption from the state and county sales and use taxes on computer data center equipment, term 1/1/2024 to 12/31/2033.
All tax records for Vantage OH1 New Albany campus2024 · CyrusOne New Albany
Sales and use tax exemption (Ohio Rev. Code Section 122.175)
75% exemption from the state and county sales and use taxes on computer data center equipment, term 1/1/2024 to 12/31/2033.
All tax records for CyrusOne New Albany2024 · Microsoft New Albany data center
Sales and use tax exemption (Ohio Rev. Code Section 122.175)
Exemption from the state and county sales and use taxes on computer data center equipment, term 1/1/2027 to 12/31/2056 (a 30-year span) per the Department of Development summary.
All tax records for Microsoft New Albany data center2026 · Cologix Johnstown campus
Sales and use tax exemption (Ohio Rev. Code Section 122.175)
50% exemption from the state and county sales and use taxes on computer data center equipment, term 1/1/2026 to 12/31/2035.
All tax records for Cologix Johnstown campus2023 · Aligned NEO-01 Perkins Township campus
Sales and use tax exemption (Ohio Rev. Code Section 122.175)
75% exemption from the state and county sales and use taxes on computer data center equipment, term 1/1/2024 to 12/31/2038.
All tax records for Aligned NEO-01 Perkins Township campus
In the news
Voters across the country reject data centers
Ohio Capital Journal
Ohio Supreme Court: Village with data center moratorium won’t have to consider site plan
Ohio Capital Journal
Enough is enough in Ohio on polluting data center gas power plants
Ohio Capital Journal
Recent cases and dockets in Ohio
- Utility commission · Pending before the commissionApplication of Duke Energy Ohio for approval of a data center rate class (Rate DC)
- Utility commission · Pending before the commissionApplication of The Dayton Power and Light Company (AES Ohio) for an increase in electric distribution rates, multi-year rate plan 2027-2029, with a stipulated Data Center Tariff
- Court case · PendingCity of Hilliard v. Ohio Environmental Protection Agency (fuel cell permit appeal)
- Utility commission · DecidedApplication of Ohio Power Company for approval of a Data Center Power tariff (Schedule DCT) and a Mobile Data Center tariff
- Utility commission · Pending before the commissionJoint application of Ohio Edison Company, The Cleveland Electric Illuminating Company and The Toledo Edison Company for approval of a Data Center Tariff (Schedule DCT)
- Utility commission · Pending before the commissionJoint application of Ohio Edison Company, The Cleveland Electric Illuminating Company and The Toledo Edison Company for approval of a Data Center Tariff (Schedule DCT)
- Utility commission · Pending before the commissionJoint application of Ohio Edison Company, The Cleveland Electric Illuminating Company and The Toledo Edison Company for approval of a Data Center Tariff (Schedule DCT)
- Court case · DecidedState ex rel. Bristolville 25 Developer, L.L.C., et al. v. Village of Lordstown, et al.
Bills and laws in Ohio
- HB 983 · In committee · Nov 10, 2026Data Center Accountability and Citizen Protection Act requirements
- HB 646 · Passed one chamber · Jun 10, 2026Data center tax break caps, self-power, water and rate rules
- HB 957 · In committee · Jun 3, 2026Ends new data center sales tax exemptions after September 2026
- SB 381 · In committee · Mar 25, 2026PUCO must approve data center grid interconnection agreements
- HB 784 · In committee · Mar 25, 2026Data centers report water use; bans water data in NDAs
- SB 374 · In committee · Mar 25, 2026Ends new data center sales tax exemptions after September 2026
- HB 710 · In committee · Feb 25, 2026Bans public support and limits new data center construction
- HB 706 · In committee · Feb 25, 2026Minimum billing and service requirements for data center customers
- SB 190 · In committee · May 7, 2025Omnibus tax bill ending the data center sales tax exemption
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
Officials we track for Ohio
The lawmakers and local officials whose recorded jurisdiction is Ohio, with the bills and votes we have on record for each.
- Brian CooperMember, Ohio Tax Credit Authority
- Deborah McGrawMember, Ohio Tax Credit Authority
- Joy EvangelistaMember, Ohio Tax Credit Authority
- Susan RestrepoActing Chair, Ohio Tax Credit Authority
Questions people ask
- How many data centers are in Ohio?
- Data Center Fact Check tracks 51 data center projects in Ohio as of November 2026. Of those, 21 operating, 13 under construction and 6 proposed.
- What is the biggest data center in Ohio?
- By announced capacity, the biggest data center in Ohio is PORTS-Pike Technology Campus, announced at 8,000 MW. It is announced.
- How much power do data centers in Ohio use?
- The 51 projects tracked in Ohio have announced about 9,679 MW of capacity in total, where a figure is published. That is announced capacity, not measured electricity use.
Sources
- 1Amazon Investment in New Albany Contributes $1.4 Billion to Licking County GDP
City of New AlbanyTier 1 · Open the source - 2
- 3
- 4Resolution R-32-2017 (City of New Albany adopted legislation, July 31, 2017)
City of New AlbanyTier 1 · Open the source - 5Community Development Department Monthly Report, November 2019
City of New AlbanyTier 1 · Open the source - 6Ohio Data Center Tax Exemption Projects Summary (Last Updated 6/10/2026)
Ohio Department of DevelopmentTier 1 · Open the source · Archived copy - 7Ohio Revised Code Section 122.175, Tax exemption for sale, storage, use, or other consumption of computer data center equipment
Ohio Legislative Service Commission (Ohio Laws)Tier 1 · Open the source - 8New Albany: where Ohio's community spirit meets the frontier of AI
Meta Platforms, Inc.Tier 1 · Open the source - 9Governor DeWine Announces $10 Billion Investment Plan from Amazon Web Services in Greater Ohio
Office of Governor Mike DeWineTier 1 · Open the source - 10Staff Report of Investigation and Certificate, Case No. 25-0649-EL-BLN, Scioto Darby Creek Road Fuel Cell System Project
Ohio Power Siting BoardTier 1 · Open the source - 11Follow in Facebook's Footsteps: Why Ohio is a Prime Location for Data Centers
AEPTier 1 · Open the source - 12OPSB approves construction of Licking County natural gas-fired power plant (Socrates South)
Public Utilities Commission of OhioTier 1 · Open the source - 13
- 14
- 15
- 16Google 2025 Environmental Report (2024 data), Water use by data center location table
GoogleTier 4 · Open the source - 17
- 18New Albany City Council Meeting Minutes, September 5, 2017
City of New AlbanyTier 1 · Open the source - 19Amazon Web Services to Invest $7.8 Billion in Ohio
JobsOhio (joint release with the Office of Governor Mike DeWine)Tier 1 · Open the source - 202014-2015 Annual Report
GROW Licking County Community Improvement CorporationTier 1 · Open the source - 21Facebook to Build One of the World's Most Advanced Data Centers in New Albany
Innovate New AlbanyTier 1 · Open the source - 22Here is how the New Albany Data Center is supporting the long-term vitality of Ohio
Meta Platforms, Inc.Tier 1 · Open the source - 23
- 24Planning Report, Case 26-060ARTW, Amazon Dublin Campus Rooftop Cellular Signal Booster Installations (October 8, 2026)
City of DublinTier 1 · Open the source - 25
- 26New Albany City Council Meeting Minutes, February 19, 2019
City of New AlbanyTier 1 · Open the source - 27Data Center Development in Sunbury, Ohio: Frequently Asked Questions (February 24, 2026)
City of SunburyTier 1 · Open the source - 28Ohio Tax Credit Authority meeting minutes, June 24, 2024
Ohio Tax Credit Authority (Ohio Department of Development)Tier 1 · Open the source
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "Ohio." Accessed 2026-11-29. https://datacenterfactcheck.org/places/us-oh
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page