Skip to content

Project File

Google Lima data center

Allen County,OhioUnder constructionFirst public 2024Filing entity: Bistrozzi LLCLast checked Nov 8, 2026

GoogleDeveloper and operator

Saved in this browser; see it under My feed. Email alerts are not available yet.

Details confirmed

Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.

4 of 6 details confirmed

  • Confirmed: County
  • Confirmed: Stage
  • Confirmed: Electric utility
  • Confirmed: First public date
  • Still to confirm: City or address
  • Still to confirm: Capacity
Know the record? Send it to us

What happens next: No upcoming date is on record.

Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.

Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.

Google Lima data center is a under-construction data center project in Allen County, Ohio. Google is named as operator. It was first public in 2024. No site capacity figure is published for this project.

Google Lima data center is an under-construction data center project in Allen County, Ohio. Google is named as operator. No site capacity figure is published for this project. 4 of the six core facts we track for every project are confirmed on this page.

Where this project sits

This project sits in Allen County, Ohio. Each place page carries the projects tracked there, who provides its power and water, and its local rules.

1Public records we have found

For homeowners

What this project means if you live nearby

We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.

Latest from the newswire

  1. What the record shows · November 28, 2026

    Loudoun County data centers: the complete record

  2. What the record shows · November 22, 2026

    SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days

  3. What the record shows · November 22, 2026

    PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

County outline onlyExact site not confirmed yet. The outline shows Allen County, Ohio.See every project on the map

The land, to scale

One football field
373 acres, about 282 football fields. Drawn as a square for scale; the real shape is not known.

Timeline

  1. · New projectFirst public record of Google Lima data centerUnder construction

Laws and bills that may apply here

Found by each bill's own place and size rules. Each one says who has checked it so far.

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Ohio HB 646: Data center tax break caps, self-power, water and rate rules

    The act covers data centers on a single parcel or contiguous, adjacent, or aggregated parcels requiring peak demand capacity greater than twenty-five megawatts at a single building or physical location; this project has no capacity figure on record, but the project's peak demand capacity at a single building or location and its parcel layout is not on record.

    “"Data center" means one or more buildings or physical facilities or infrastructure, located on a single real property parcel or on contiguous, adjacent, or otherwise aggregated real property parcels requiring peak demand capacity that is greater than twenty-five megawatts at a single building or physical location and that are used primarily or exclusively for digital information services such as the management, storage, processing, and dissemination of electronic data and information through the use of computer systems, servers, networking equipment, and related components, including equipment cooling systems, or virtual currency mining.” (Sec. 4941.01(B))

    Rule checks: Project is in Ohio. Still to check: size: unknown, who it covers: not checked

Bills and laws in Ohio

All 9 in Bill Watch

Who's involved

  • Developer and operatorGoogle

Public records

1 records found so far. 8 kinds of record are still being collected.

See every record

Questions people ask

Where is Google Lima data center?
Google Lima data center is a data center project in Allen County, Ohio.
Who operates Google Lima data center?
Google is named as the operator of Google Lima data center.
How big is Google Lima data center?
The site covers 373 acres.
What stage is Google Lima data center?
Google Lima data center is under construction. It was first public in 2024.

Sources

Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.

  1. 1
    Data Center Costs, PUCO Case 24-0508-EL-ATA (case page and update)
    Office of the Ohio Consumers' Counsel
    Tier 2 · Captured 2026-11-08 · Open the source
  2. 2
    Google to Build Data Center in Lima, Ohio, with $500 Million Capital Investment
    Allen Economic Development Group
    Tier 2 · Captured 2026-11-08 · Open the source
  3. 3
    Allen County Data Center (project community site)
    Allen County Data Center project
    Tier 4 · Captured 2026-11-08 · Open the source

No corrections have been published for this page. Corrections log · Report an error or send a tip on this page