Project File
Cologix COL4 (Columbus)
Columbus,Franklin County,OhioOperatingFirst public 2026Last checked Nov 14, 2026
CologixOperator
Details confirmed
Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.
5 of 6 details confirmed
- Confirmed: County
- Confirmed: City or address
- Confirmed: Stage
- Confirmed: Capacity
- Confirmed: First public date
- Still to confirm: Electric utility
What happens next: No upcoming date is on record.
Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.
Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.
Cologix COL4 (Columbus) is an operating data center project in Columbus, Franklin County, Ohio. Cologix is named as operator. It was first public in 2026. It was announced at 33 MW.
Cologix COL4 (Columbus) is an operating data center project in Columbus, Franklin County, Ohio. Cologix is named as operator. It was announced at 33 MW. 5 of the six core facts we track for every project are confirmed on this page.
Where this project sits
This project sits in Columbus, Franklin County, Ohio. Each place page carries the projects tracked there, who provides its power and water, and its local rules.
For homeowners
What this project means if you live nearby
We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
Timeline
- · New projectFirst public record of Cologix COL4 (Columbus)Operating
Laws and bills that may apply here
Found by each bill's own place and size rules. Each one says who has checked it so far.
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Ohio HB 646: Data center tax break caps, self-power, water and rate rules
The act covers data centers on a single parcel or contiguous, adjacent, or aggregated parcels requiring peak demand capacity greater than twenty-five megawatts at a single building or physical location; this project has 33 MW announced on record, but the project's peak demand capacity at a single building or location and its parcel layout is not on record. Status part: the bill's status (Passed House; recommitted in Senate Energy Committee) means its text is not yet operative law, and the text part below is read from the bill as passed one chamber. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
“"Data center" means one or more buildings or physical facilities or infrastructure, located on a single real property parcel or on contiguous, adjacent, or otherwise aggregated real property parcels requiring peak demand capacity that is greater than twenty-five megawatts at a single building or physical location and that are used primarily or exclusively for digital information services such as the management, storage, processing, and dissemination of electronic data and information through the use of computer systems, servers, networking equipment, and related components, including equipment cooling systems, or virtual currency mining.” (Sec. 4941.01(B))
Rule checks: Project is in Ohio; 33 MW on record (announced), threshold 25 MW (Sec. 4941.01(B)). Still to check: who it covers: not checked
Bills and laws in Ohio
- HB 983 · In committee · Nov 10, 2026Data Center Accountability and Citizen Protection Act requirements
- HB 646 · Passed one chamber · Jun 10, 2026Data center tax break caps, self-power, water and rate rules
- HB 957 · In committee · Jun 3, 2026Ends new data center sales tax exemptions after September 2026
- SB 381 · In committee · Mar 25, 2026PUCO must approve data center grid interconnection agreements
- HB 784 · In committee · Mar 25, 2026Data centers report water use; bans water data in NDAs
- SB 374 · In committee · Mar 25, 2026Ends new data center sales tax exemptions after September 2026
Who's involved
- OperatorCologix
Public records
0 records found so far. 9 kinds of record are still being collected.
Questions people ask
- Where is Cologix COL4 (Columbus)?
- Cologix COL4 (Columbus) is a data center project in Columbus, Franklin County, Ohio.
- Who operates Cologix COL4 (Columbus)?
- Cologix is named as the operator of Cologix COL4 (Columbus).
- How big is Cologix COL4 (Columbus)?
- Cologix COL4 (Columbus) was announced at 33 MW of capacity.
- What stage is Cologix COL4 (Columbus)?
- Cologix COL4 (Columbus) is operating. It was first public in 2026.
Sources
Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.
- 1Cologix data center locations (operator’s own list)
CologixTier 2 · Captured 2026-11-10 · Open the source - 2
- 32020 ZCTA to county relationship file (tab20_zcta520_county20_natl.txt)
U.S. Census BureauTier 1 · Captured 2026-11-09 · Open the source
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page