Project File

Meta New Albany Data Center

New Albany,Licking County,OhioOperatingFirst public 2017Filing entity: Sidecat LLCLast checked Nov 9, 2026

MetaDeveloper and operatorAEP OhioElectric utilityWill-Power OHOther role

Saved in this browser; see it under My feed. Email alerts are not available yet.

Details confirmed

Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.

6 of 6 details confirmed

  • Confirmed: County
  • Confirmed: City or address
  • Confirmed: Stage
  • Confirmed: Capacity
  • Confirmed: Electric utility
  • Confirmed: First public date
Know the record? Send it to us

What happens next: No upcoming date is on record.

Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.

Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.

Meta New Albany Data Center is an operating data center project in New Albany, Licking County, Ohio. Meta is named as operator. It was first public in 2017. Its permitted standby generators total 200 MW.

Meta New Albany Data Center is an operating data center project in New Albany, Licking County, Ohio. Meta is named as operator. Its permitted standby generators total 200 MW. All six of the core facts we track for every project are confirmed on this page.

Where this project sits

This project sits in New Albany, Licking County, Ohio. Each place page carries the projects tracked there, who provides its power and water, and its local rules.

12Public records we have found
2Tax agreements on record
200Generator capacity, MW

For homeowners

What this project means if you live nearby

Each fact says which way it runs: comes to the community (such as tax paid), comes from the community (such as water or a tax break), or goes both ways. The labels show direction, not whether it is good or bad. How we work

  1. Property tax

    The city abates 100 percent of this campus's real property taxes for 15 years under a 2017 agreement.

    Comes to the community
  2. Tax breaks

    The state gave this project a 100 percent sales tax exemption on data center equipment, approved in 2017.

    Comes to the community
  3. Money for schools and services

    Meta says it has directed over $7.8 million in community grants and sponsorships across Franklin and Licking counties since 2017.

    Comes to the community
  4. Electricity bill

    AEP Ohio supplies this campus from the grid; since 2025 a 200 MW on-site gas plant also feeds it behind the meter.

    Comes from the community
  5. Water

    Columbus supplies the city's water and the city sewers this campus; Meta reported withdrawing 86 million liters in 2024.

    Comes from the community
  6. Jobs

    Meta says the campus supports over 300 operational jobs; the 2017 announcement projected about 100.

    Comes from the community
  7. Next door: height, setbacks, noise

    No siting, setback, or noise rule for this campus is in our records yet.

    Not known yet
  8. Your say

    New Albany's council approved this campus's tax agreements on July 31, 2017, recorded as six yes votes with no roll call.

    How to take part

Latest from the newswire

  1. What the record shows · November 28, 2026

    Loudoun County data centers: the complete record

  2. What the record shows · November 22, 2026

    SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days

  3. What the record shows · November 22, 2026

    PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

County outline onlyExact site not confirmed yet. The outline shows Licking County, Ohio.See every project on the map

The land, to scale

One football field
740 acres, about 560 football fields. Drawn as a square for scale; the real shape is not known.

Timeline

  1. · DecisionOhio Power Siting Board: Authorized construction of the Socrates South Power Generation Project, a 200 MW natural gas-fired facility operating behind the meter to serve the adjacent Sidecat data center campus, not physically connected to the electric grid for Meta New Albany Data Center25-0185-EL-BLN
  2. · FilingFiled with City of New Albany for Meta New Albany Data Center
  3. · FilingFiled with City of New Albany for Meta New Albany Data Center
  4. · DecisionCity of New Albany: Authorized a packaged sanitary sewer lift station for the Beech Road corridor (R-42-2017) and contracts for the sanitary sewer, waterline, and roadway projects serving development south of SR-161 including the Sidecat site (R-43-2017) for Meta New Albany Data CenterR-42-2017; R-43-2017
  5. · FilingFiled with City of New Albany for Meta New Albany Data CenterR-42-2017; R-43-2017
  6. · DecisionFacebook; JobsOhio; City of New Albany: Joint announcement that Facebook would build its tenth data center in the New Albany International Business Park: a $750 million, 970,000 sq ft facility on a 345-acre site, powered by 100 percent renewable energy, delivering services from 2019 for Meta New ...
  7. · FilingFiled with Facebook; JobsOhio; City of New Albany for Meta New Albany Data Center
  8. · New projectFirst public record of Meta New Albany Data CenterOperating
All 14 events for this project

Laws and bills that may apply here

Found by each bill's own place and size rules. Each one says who has checked it so far.

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Ohio HB 646: Data center tax break caps, self-power, water and rate rules

    The act covers data centers on a single parcel or contiguous, adjacent, or aggregated parcels requiring peak demand capacity greater than twenty-five megawatts at a single building or physical location; this project has 400 MW on record (generator capacity), but the project's peak demand capacity at a single building or location and its parcel layout is not on record.

    “"Data center" means one or more buildings or physical facilities or infrastructure, located on a single real property parcel or on contiguous, adjacent, or otherwise aggregated real property parcels requiring peak demand capacity that is greater than twenty-five megawatts at a single building or physical location and that are used primarily or exclusively for digital information services such as the management, storage, processing, and dissemination of electronic data and information through the use of computer systems, servers, networking equipment, and related components, including equipment cooling systems, or virtual currency mining.” (Sec. 4941.01(B))

    Rule checks: Project is in Ohio. Still to check: size: unknown, who it covers: not checked

Bills and laws in Ohio

All 9 in Bill Watch

Who's involved

Power and water

Water, as reported by the operator

New Albany (OH) facility as named in Meta's 2025 Environmental Data Index

  • 2024 · Withdrawal: 86 ML
  • 2023 · Withdrawal: 72 ML
  • 2022 · Withdrawal: 87 ML
  • 2021 · Withdrawal: 121 ML
  • 2020 · Withdrawal: 35 ML

Capacity, as announced or filed

  • 400 MW · Dedicated generation, Socrates North and South (combined)Aug 2025 · generator_capacity

From the filings

Numbers stated in permits, agreements, and decisions, as printed. Each links to the filing.

  • City of New Albany

    Stated in the filing
    973,670 sq_ft
    Stated in the filing
    518,184 sq_ft
  • Meta Platforms, Inc.

    Stated in the filing
    1,200 skilled trade workers on site at peak
    Stated in the filing
    $7.8 million
    Stated in the filing
    300 jobs (stated as 300+)
  • Ohio Tax Credit Authority

    Stated in the filing
    100 percent
    Stated in the filing
    40 years
  • Facebook; JobsOhio; City of New Albany

    Stated in the filing
    $750 million
    Stated in the filing
    345 acres
    Stated in the filing
    100 jobs
    Stated in the filing
    970,000 sq_ft
  • City of New Albany, R-32-2017

    Stated in the filing
    100 percent
    Stated in the filing
    15 years
    Stated in the filing
    $700,000 per year (minimum city revenue payment under the CRA agreement, from 2021)
    Stated in the filing
    50 jobs
    Stated in the filing
    $250,000
    Stated in the filing
    $1.4 million per year (minimum city revenue payment under the CRA agreement, from 2023)
  • City of New Albany

    Stated in the filing
    302,944 sq_ft
    Stated in the filing
    362,317 sq_ft
  • Ohio Power Siting Board, 25-0185-EL-BLN

    Stated in the filing
    740 acres
    Generator capacity
    200 MW

Public records

12 records found so far. 5 kinds of record are still being collected.

See every record

Questions people ask

Where is Meta New Albany Data Center?
Meta New Albany Data Center is a data center project in New Albany, Licking County, Ohio.
Who operates Meta New Albany Data Center?
Meta is named as the operator of Meta New Albany Data Center.
How big is Meta New Albany Data Center?
The site covers 740 acres.
What stage is Meta New Albany Data Center?
Meta New Albany Data Center is operating. It was first public in 2017.

Sources

Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.

  1. 1
    Community Development Department Monthly Report, November 2019
    City of New Albany
    Tier 1 · Captured 2026-11-09 · Open the source
  2. 2
    Here is how the New Albany Data Center is supporting the long-term vitality of Ohio
    Meta Platforms, Inc.
    Tier 1 · Captured 2026-11-09 · Open the source
  3. 3
    New Albany: where Ohio's community spirit meets the frontier of AI
    Meta Platforms, Inc.
    Tier 1 · Captured 2026-11-09 · Open the source
  4. 4
    Ohio Data Center Tax Exemption Projects Summary (Last Updated 6/10/2026)
    Ohio Department of Development
    Tier 1 · Captured 2026-11-09 · Open the source · Archived copy
  5. 5
    Ohio Revised Code Section 122.175, Tax exemption for sale, storage, use, or other consumption of computer data center equipment
    Ohio Legislative Service Commission (Ohio Laws)
    Tier 1 · Captured 2026-11-08 · Open the source
  6. 6
    Facebook to Build One of the World's Most Advanced Data Centers in New Albany
    Innovate New Albany
    Tier 1 · Captured 2026-11-09 · Open the source
  7. 7
    New Albany City Council Meeting Minutes, July 31, 2017
    City of New Albany
    Tier 1 · Captured 2026-11-09 · Open the source
  8. 8
    Resolution R-32-2017 (City of New Albany adopted legislation, July 31, 2017)
    City of New Albany
    Tier 1 · Captured 2026-11-09 · Open the source
  9. 9
    Community Development Department Monthly Report, January 2025
    City of New Albany
    Tier 1 · Captured 2026-11-09 · Open the source
  10. 10
    New Albany City Council Meeting Minutes, September 5, 2017
    City of New Albany
    Tier 1 · Captured 2026-11-09 · Open the source
  11. 11
    OPSB approves construction of Licking County natural gas-fired power plant (Socrates South)
    Public Utilities Commission of Ohio
    Tier 1 · Captured 2026-11-09 · Open the source
  12. 12
    Data center frequently asked questions
    City of New Albany Ohio
    Tier 1 · Captured 2026-11-08 · Open the source
  13. 13
    City of New Albany Ohio Data Center Zoning information sheet (May 2026)
    City of New Albany Community Development Department
    Tier 1 · Captured 2026-11-08 · Open the source
  14. 14
    Data Center Costs, PUCO Case 24-0508-EL-ATA (case page and update)
    Office of the Ohio Consumers' Counsel
    Tier 2 · Captured 2026-11-08 · Open the source
  15. 15
    Follow in Facebook's Footsteps: Why Ohio is a Prime Location for Data Centers
    AEP
    Tier 1 · Captured 2026-11-09 · Open the source
  16. 16
    Meta 2025 Environmental Data Index
    Meta Platforms, Inc.
    Tier 4 · Captured 2026-11-08 · Open the source
  17. 17
    Water and Sewer Contract Communities list (7-14-2025)
    City of Columbus
    Tier 1 · Captured 2026-11-09 · Open the source
  18. 18
    Socrates North and South Power Solution fact sheet (Will-Power OH, New Albany, Ohio)
    Williams (Will-Power OH LLC)
    Tier 4 · Captured 2026-11-08 · Open the source
  19. 19
    United States - Meta Data Centers (fleet list incl. Fort Worth)
    Meta
    Tier 4 · Captured 2026-11-08 · Open the source