STACK NAL01 New Albany campus

New Albany,Franklin County,OhioExpandingLast checked Nov 8, 2026

STACK InfrastructureDeveloper and operator

Saved in this browser; see it under My feed. Email alerts are not available yet.

Details confirmed

Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.

4 of 6 details confirmed

  • Confirmed: County
  • Confirmed: City or address
  • Confirmed: Stage
  • Confirmed: Capacity
  • Still to confirm: Electric utility
  • Still to confirm: First public date
Know the record? Send it to us

What happens next: No upcoming date is on record.

Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.

Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.

STACK NAL01 New Albany campus is an expanding data center project in New Albany, Franklin County, Ohio. STACK Infrastructure is named as operator. It was announced at 60 MW.

STACK NAL01 New Albany campus is an expanding data center project in New Albany, Franklin County, Ohio. STACK Infrastructure is named as operator. It was announced at 60 MW. 4 of the six core facts we track for every project are confirmed on this page.

Where this project sits

This project sits in New Albany, Franklin County, Ohio. Each place page carries the projects tracked there, who provides its power and water, and its local rules.

60 MWAnnounced capacity
1Public records we have found

For homeowners

What this project means if you live nearby

We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.

Latest from the newswire

  1. What the record shows · November 28, 2026

    Loudoun County data centers: the complete record

  2. What the record shows · November 22, 2026

    SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days

  3. What the record shows · November 22, 2026

    PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

County outline onlyExact site not confirmed yet. The outline shows Franklin County, Ohio.See every project on the map

The land, to scale

One football field
40 acres, about 30 football fields. Drawn as a square for scale; the real shape is not known.

Laws and bills that may apply here

Found by each bill's own place and size rules. Each one says who has checked it so far.

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Ohio HB 646: Data center tax break caps, self-power, water and rate rules

    The act covers data centers on a single parcel or contiguous, adjacent, or aggregated parcels requiring peak demand capacity greater than twenty-five megawatts at a single building or physical location; this project has 60 MW announced on record, but the project's peak demand capacity at a single building or location and its parcel layout is not on record.

    “"Data center" means one or more buildings or physical facilities or infrastructure, located on a single real property parcel or on contiguous, adjacent, or otherwise aggregated real property parcels requiring peak demand capacity that is greater than twenty-five megawatts at a single building or physical location and that are used primarily or exclusively for digital information services such as the management, storage, processing, and dissemination of electronic data and information through the use of computer systems, servers, networking equipment, and related components, including equipment cooling systems, or virtual currency mining.” (Sec. 4941.01(B))

    Rule checks: Project is in Ohio; 60 MW on record (announced), threshold 25 MW (Sec. 4941.01(B)). Still to check: who it covers: not checked

Bills and laws in Ohio

All 9 in Bill Watch

Who's involved

Public records

1 records found so far. 8 kinds of record are still being collected.

See every record

Questions people ask

Where is STACK NAL01 New Albany campus?
STACK NAL01 New Albany campus is a data center project in New Albany, Franklin County, Ohio.
Who operates STACK NAL01 New Albany campus?
STACK Infrastructure is named as the operator of STACK NAL01 New Albany campus.
How big is STACK NAL01 New Albany campus?
STACK NAL01 New Albany campus was announced at 60 MW of capacity. The site covers 40 acres.
What stage is STACK NAL01 New Albany campus?
STACK NAL01 New Albany campus is expanding.

Sources

Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.

  1. 1
    Data center frequently asked questions
    City of New Albany Ohio
    Tier 1 · Captured 2026-11-08 · Open the source
  2. 2
    City of New Albany Ohio Data Center Zoning information sheet (May 2026)
    City of New Albany Community Development Department
    Tier 1 · Captured 2026-11-08 · Open the source
  3. 3
    NAL01, New Albany
    STACK Infrastructure
    Tier 4 · Captured 2026-11-08 · Open the source