Dublin,Franklin County,OhioOperatingFirst public 2015Filing entity: VADATA Inc.Last checked Nov 9, 2026

AmazonDeveloper and operator

Saved in this browser; see it under My feed. Email alerts are not available yet.

Details confirmed

Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.

4 of 6 details confirmed

  • Confirmed: County
  • Confirmed: City or address
  • Confirmed: Stage
  • Confirmed: First public date
  • Still to confirm: Capacity
  • Still to confirm: Electric utility
Know the record? Send it to us

What happens next: No upcoming date is on record.

Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.

Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.

Amazon Web Services Dublin campus is an operating data center project in Dublin, Franklin County, Ohio. Amazon is named as operator. It was first public in 2015. No site capacity figure is published for this project.

Amazon Web Services Dublin campus is an operating data center project in Dublin, Franklin County, Ohio. Amazon is named as operator. No site capacity figure is published for this project. 4 of the six core facts we track for every project are confirmed on this page.

Where this project sits

This project sits in Dublin, Franklin County, Ohio. Each place page carries the projects tracked there, who provides its power and water, and its local rules.

1Public records we have found

For homeowners

What this project means if you live nearby

We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.

Latest from the newswire

  1. What the record shows · November 28, 2026

    Loudoun County data centers: the complete record

  2. What the record shows · November 22, 2026

    SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days

  3. What the record shows · November 22, 2026

    PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

County outline onlyExact site not confirmed yet. The outline shows Franklin County, Ohio.See every project on the map

The land, to scale

One football field
66.96 acres, about 51 football fields. Drawn as a square for scale; the real shape is not known.

Timeline

  1. · DecisionCity of Dublin: Planning staff report documenting the Amazon Dublin campus: five existing data center buildings at 6645-6685 Crosby Court on a 66.956-acre parcel owned by VADATA Inc., approved in five phases from 2015 to 2021 (Cases 15-015WID/DP, 16-087WID-DP, 17-027WID-DP, 20-006WID-DPR, 20-214W...26-060ARTW
  2. · FilingFiled with City of Dublin for Amazon Web Services Dublin campus26-060ARTW
  3. · New projectFirst public record of Amazon Web Services Dublin campusOperating

Laws and bills that may apply here

Found by each bill's own place and size rules. Each one says who has checked it so far.

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Ohio HB 646: Data center tax break caps, self-power, water and rate rules

    The act covers data centers on a single parcel or contiguous, adjacent, or aggregated parcels requiring peak demand capacity greater than twenty-five megawatts at a single building or physical location; this project has no capacity figure on record, but the project's peak demand capacity at a single building or location and its parcel layout is not on record. Status part: the bill's status (Passed House; recommitted in Senate Energy Committee) means its text is not yet operative law, and the text part below is read from the bill as passed one chamber. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.

    “"Data center" means one or more buildings or physical facilities or infrastructure, located on a single real property parcel or on contiguous, adjacent, or otherwise aggregated real property parcels requiring peak demand capacity that is greater than twenty-five megawatts at a single building or physical location and that are used primarily or exclusively for digital information services such as the management, storage, processing, and dissemination of electronic data and information through the use of computer systems, servers, networking equipment, and related components, including equipment cooling systems, or virtual currency mining.” (Sec. 4941.01(B))

    Rule checks: Project is in Ohio. Still to check: size: unknown, who it covers: not checked

Bills and laws in Ohio

All 9 in Bill Watch

Who's involved

From the filings

Numbers stated in permits, agreements, and decisions, as printed. Each links to the filing.

  • City of Dublin, 26-060ARTW

    Stated in the filing
    5 buildings
    Stated in the filing
    66.956 acres

Public records

1 records found so far. 8 kinds of record are still being collected.

See every record

Questions people ask

Where is Amazon Web Services Dublin campus?
Amazon Web Services Dublin campus is a data center project in Dublin, Franklin County, Ohio.
Who operates Amazon Web Services Dublin campus?
Amazon is named as the operator of Amazon Web Services Dublin campus.
How big is Amazon Web Services Dublin campus?
The site covers 66.96 acres.
What stage is Amazon Web Services Dublin campus?
Amazon Web Services Dublin campus is operating. It was first public in 2015.

Sources

Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.

  1. 1
    Planning Report, Case 26-060ARTW, Amazon Dublin Campus Rooftop Cellular Signal Booster Installations (October 8, 2026)
    City of Dublin
    Tier 1 · Captured 2026-11-09 · Open the source
  2. 2
    Governor DeWine Announces Plans for Estimated $7.8 Billion Investment by Amazon Web Services in Ohio (2023-06-26)
    Office of Governor Mike DeWine (release archive)
    Tier 1 · Captured 2026-11-08 · Open the source