Project File

PORTS-Pike Technology Campus

Pike County,OhioAnnouncedFirst public 2026Last checked Nov 13, 2026

SB EnergyDeveloper and operatorOpenAIEnd user

Saved in this browser; see it under My feed. Email alerts are not available yet.

Details confirmed

Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.

4 of 6 details confirmed

  • Confirmed: County
  • Confirmed: Stage
  • Confirmed: Capacity
  • Confirmed: First public date
  • Still to confirm: City or address
  • Still to confirm: Electric utility
Know the record? Send it to us

What happens next: No upcoming date is on record.

Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.

Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.

PORTS-Pike Technology Campus is an announced data center project in Pike County, Ohio. SB Energy is named as operator. It was first public in 2026. It was announced at 8,000 MW.

PORTS-Pike Technology Campus is an announced data center project in Pike County, Ohio. SB Energy is named as operator. It was announced at 8,000 MW. 4 of the six core facts we track for every project are confirmed on this page.

Where this project sits

This project sits in Pike County, Ohio. Each place page carries the projects tracked there, who provides its power and water, and its local rules.

8,000 MWAnnounced capacity
0Public records we have found

For homeowners

What this project means if you live nearby

We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.

Latest from the newswire

  1. What the record shows · November 28, 2026

    Loudoun County data centers: the complete record

  2. What the record shows · November 22, 2026

    SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days

  3. What the record shows · November 22, 2026

    PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

County outline onlyExact site not confirmed yet. The outline shows Pike County, Ohio.See every project on the map

Timeline

  1. · New projectFirst public record of PORTS-Pike Technology CampusAnnounced

Laws and bills that may apply here

Found by each bill's own place and size rules. Each one says who has checked it so far.

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Ohio HB 646: Data center tax break caps, self-power, water and rate rules

    The act covers data centers on a single parcel or contiguous, adjacent, or aggregated parcels requiring peak demand capacity greater than twenty-five megawatts at a single building or physical location; this project has 8,000 MW announced on record, but the project's peak demand capacity at a single building or location and its parcel layout is not on record.

    “"Data center" means one or more buildings or physical facilities or infrastructure, located on a single real property parcel or on contiguous, adjacent, or otherwise aggregated real property parcels requiring peak demand capacity that is greater than twenty-five megawatts at a single building or physical location and that are used primarily or exclusively for digital information services such as the management, storage, processing, and dissemination of electronic data and information through the use of computer systems, servers, networking equipment, and related components, including equipment cooling systems, or virtual currency mining.” (Sec. 4941.01(B))

    Rule checks: Project is in Ohio; 8,000 MW on record (it load), threshold 25 MW (Sec. 4941.01(B)). Still to check: who it covers: not checked

Bills and laws in Ohio

All 9 in Bill Watch

Who's involved

Power

Capacity, as announced or filed

  • 8,000 MW · Full build (announced total)Aug 2026 · it_load

Public records

0 records found so far. 9 kinds of record are still being collected.

    See every record

    Questions people ask

    Where is PORTS-Pike Technology Campus?
    PORTS-Pike Technology Campus is a data center project in Pike County, Ohio.
    Who operates PORTS-Pike Technology Campus?
    SB Energy is named as the operator of PORTS-Pike Technology Campus.
    How big is PORTS-Pike Technology Campus?
    PORTS-Pike Technology Campus was announced at 8,000 MW of capacity.
    What stage is PORTS-Pike Technology Campus?
    PORTS-Pike Technology Campus is announced. It was first public in 2026.

    Sources

    Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.

    1. 1
      OpenAI joins PORTS-Pike project
      OpenAI
      Tier 4 · Captured 2026-11-08 · Open the source