Project File
Amazon Web Services Hilliard campus
Hilliard,Franklin County,OhioOperatingFirst public 2022Filing entity: Amazon Data Services, Inc.Last checked Nov 9, 2026
AmazonDeveloper and operatorAEP OhioElectric utilityAmazon Data ServicesOperator
Details confirmed
Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.
5 of 6 details confirmed
- Confirmed: County
- Confirmed: City or address
- Confirmed: Stage
- Confirmed: Electric utility
- Confirmed: First public date
- Still to confirm: Capacity
What happens next: No upcoming date is on record.
Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.
Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.
Amazon Web Services Hilliard campus is an operating data center project in Hilliard, Franklin County, Ohio. Amazon Data Services is named as operator. It was first public in 2022. Its permitted standby generators total 72.9 MW.
Amazon Web Services Hilliard campus is an operating data center project in Hilliard, Franklin County, Ohio. Amazon Data Services is named as operator. Its permitted standby generators total 72.9 MW. 5 of the six core facts we track for every project are confirmed on this page.
Where this project sits
This project sits in Hilliard, Franklin County, Ohio. Each place page carries the projects tracked there, who provides its power and water, and its local rules.
For homeowners
What this project means if you live nearby
We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

The land, to scale
Timeline
- · Court caseCourt case filed: City of Hilliard v. Ohio Environmental Protection Agency (fuel cell permit appeal)Ohio Environmental Review Appeals Commission
- · DecisionOhio Power Siting Board: Certificate for the Scioto Darby Creek Road Fuel Cell System Project: a nominal 72.9 MW net capacity solid oxide fuel cell plant (228 units) at 4186 Scioto Darby Creek Road, Hilliard, owned by Ohio Power Company and operated behind the meter for Amazon Data Services, Inc....25-0649-EL-BLN
- · FilingFiled with Ohio Power Siting Board for Amazon Web Services Hilliard campus25-0649-EL-BLN
- · DecisionCity of Hilliard Board of Zoning Appeals: Approved with seven conditions (counted vote 5-0) zoning variances for a 152.13-acre Amazon data center complex at 4120 Scioto Darby Road, including building height up to 63 feet for Buildings B, C, D and E for Amazon Web Services Hilliard campusBZA-22-24
- · FilingFiled with City of Hilliard Board of Zoning Appeals for Amazon Web Services Hilliard campusBZA-22-24
- · New projectFirst public record of Amazon Web Services Hilliard campusOperating
Laws and bills that may apply here
Found by each bill's own place and size rules. Each one says who has checked it so far.
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Ohio HB 646: Data center tax break caps, self-power, water and rate rules
The act covers data centers on a single parcel or contiguous, adjacent, or aggregated parcels requiring peak demand capacity greater than twenty-five megawatts at a single building or physical location; this project has no capacity figure on record, but the project's peak demand capacity at a single building or location and its parcel layout is not on record. Status part: the bill's status (Passed House; recommitted in Senate Energy Committee) means its text is not yet operative law, and the text part below is read from the bill as passed one chamber. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
“"Data center" means one or more buildings or physical facilities or infrastructure, located on a single real property parcel or on contiguous, adjacent, or otherwise aggregated real property parcels requiring peak demand capacity that is greater than twenty-five megawatts at a single building or physical location and that are used primarily or exclusively for digital information services such as the management, storage, processing, and dissemination of electronic data and information through the use of computer systems, servers, networking equipment, and related components, including equipment cooling systems, or virtual currency mining.” (Sec. 4941.01(B))
Rule checks: Project is in Ohio. Still to check: size: unknown, who it covers: not checked
Bills and laws in Ohio
- HB 983 · In committee · Nov 10, 2026Data Center Accountability and Citizen Protection Act requirements
- HB 646 · Passed one chamber · Jun 10, 2026Data center tax break caps, self-power, water and rate rules
- HB 957 · In committee · Jun 3, 2026Ends new data center sales tax exemptions after September 2026
- SB 381 · In committee · Mar 25, 2026PUCO must approve data center grid interconnection agreements
- HB 784 · In committee · Mar 25, 2026Data centers report water use; bans water data in NDAs
- SB 374 · In committee · Mar 25, 2026Ends new data center sales tax exemptions after September 2026
Who's involved
- Developer and operatorAmazon
- Electric utilityAEP Ohio
- OperatorAmazon Data Services
From the filings
Numbers stated in permits, agreements, and decisions, as printed. Each links to the filing.
Ohio Power Siting Board, 25-0649-EL-BLN
- Stated in the filing
- 328 MW
- Stated in the filing
- 142 acres
- Backup generators
- 228 fuel cell units
- Generator capacity
- 72.9 MW
Public records
5 records found so far. 5 kinds of record are still being collected.
See every recordCourt cases and commission dockets
- Court case · Pending · Nov 7, 2025City of Hilliard v. Ohio Environmental Protection Agency (fuel cell permit appeal)
- Utility commission · Decided · Jul 9, 2025Application of Ohio Power Company for approval of a Data Center Power tariff (Schedule DCT) and a Mobile Data Center tariff
Questions people ask
- Where is Amazon Web Services Hilliard campus?
- Amazon Web Services Hilliard campus is a data center project in Hilliard, Franklin County, Ohio.
- Who operates Amazon Web Services Hilliard campus?
- Amazon Data Services is named as the operator of Amazon Web Services Hilliard campus.
- How big is Amazon Web Services Hilliard campus?
- The site covers 142 acres.
- What stage is Amazon Web Services Hilliard campus?
- Amazon Web Services Hilliard campus is operating. It was first public in 2022.
Sources
Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.
- 1Board of Zoning Appeals Meeting Minutes, July 21, 2022
City of HilliardTier 1 · Captured 2026-11-09 · Open the source - 2Staff Report of Investigation and Certificate, Case No. 25-0649-EL-BLN, Scioto Darby Creek Road Fuel Cell System Project
Ohio Power Siting BoardTier 1 · Captured 2026-11-09 · Open the source - 3Hilliard to appeal EPA fuel cell permit for Amazon site
City of HilliardTier 1 · Captured 2026-11-09 · Open the source - 4
- 5Data Center Costs, PUCO Case 24-0508-EL-ATA (case page and update)
Office of the Ohio Consumers' CounselTier 2 · Captured 2026-11-08 · Open the source - 6U.S. Census Geocoder (batch geographies endpoint)
U.S. Census BureauTier 1 · Captured 2026-11-11 · Open the source - 7Governor DeWine Announces Plans for Estimated $7.8 Billion Investment by Amazon Web Services in Ohio (2023-06-26)
Office of Governor Mike DeWine (release archive)Tier 1 · Captured 2026-11-08 · Open the source
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page