Project File
EdgeConneX New Albany campus
New Albany,Licking County,OhioUnder constructionFirst public 2025Last checked Nov 9, 2026
EdgeConneXDeveloper and operatorPowerConneXElectric utility
Details confirmed
Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.
4 of 6 details confirmed
- Confirmed: County
- Confirmed: City or address
- Confirmed: Stage
- Confirmed: First public date
- Still to confirm: Capacity
- Still to confirm: Electric utility
What happens next: No upcoming date is on record.
Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.
Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.
EdgeConneX New Albany campus is a under-construction data center project in New Albany, Licking County, Ohio. EdgeConneX is named as operator. It was first public in 2025. Its permitted standby generators total 216 MW.
EdgeConneX New Albany campus is an under-construction data center project in New Albany, Licking County, Ohio. EdgeConneX is named as operator. Its permitted standby generators total 216 MW. 4 of the six core facts we track for every project are confirmed on this page.
Where this project sits
This project sits in New Albany, Licking County, Ohio. Each place page carries the projects tracked there, who provides its power and water, and its local rules.
For homeowners
What this project means if you live nearby
We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
The land, to scale
Timeline
- · FilingFiled with Ohio Power Siting Board for EdgeConneX New Albany campus26-0361-EL-BGN
- · DecisionOhio Power Siting Board: Certificate for a second behind-the-meter generation facility (PowerConneX II) granted; the docket carries condition-compliance filings by PowerConneX New Albany 2, LLC for EdgeConneX New Albany campus25-0302-EL-BGN
- · Tax dealTax agreement approved: Sales and use tax exemption (ohio rev. code section 122.175) for EdgeConnex50% exemption from the state and county sales and use taxes on computer data center equipment, term 1/1/2026 to 12/31/2035.
- · DecisionOhio Power Siting Board: Certificate approved for the PowerConneX 1 Generation Project, a 120 MW natural gas fired behind-the-meter generation facility co-located with the EdgeConneX data center campus in New Albany for EdgeConneX New Albany campus25-0090-EL-BLN
- · New projectFirst public record of EdgeConneX New Albany campusUnder construction
- · FilingFiled with Ohio Power Siting Board for EdgeConneX New Albany campus25-0302-EL-BGN
Laws and bills that may apply here
Found by each bill's own place and size rules. Each one says who has checked it so far.
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Ohio HB 646: Data center tax break caps, self-power, water and rate rules
The act covers data centers on a single parcel or contiguous, adjacent, or aggregated parcels requiring peak demand capacity greater than twenty-five megawatts at a single building or physical location; this project has no capacity figure on record, but the project's peak demand capacity at a single building or location and its parcel layout is not on record.
“"Data center" means one or more buildings or physical facilities or infrastructure, located on a single real property parcel or on contiguous, adjacent, or otherwise aggregated real property parcels requiring peak demand capacity that is greater than twenty-five megawatts at a single building or physical location and that are used primarily or exclusively for digital information services such as the management, storage, processing, and dissemination of electronic data and information through the use of computer systems, servers, networking equipment, and related components, including equipment cooling systems, or virtual currency mining.” (Sec. 4941.01(B))
Rule checks: Project is in Ohio. Still to check: size: unknown, who it covers: not checked
Bills and laws in Ohio
- HB 983 · In committee · Nov 10, 2026Data Center Accountability and Citizen Protection Act requirements
- HB 646 · Passed one chamber · Jun 10, 2026Data center tax break caps, self-power, water and rate rules
- HB 957 · In committee · Jun 3, 2026Ends new data center sales tax exemptions after September 2026
- SB 381 · In committee · Mar 25, 2026PUCO must approve data center grid interconnection agreements
- HB 784 · In committee · Mar 25, 2026Data centers report water use; bans water data in NDAs
- SB 374 · In committee · Mar 25, 2026Ends new data center sales tax exemptions after September 2026
Who's involved
- Developer and operatorEdgeConneX
- Electric utilityPowerConneX
From the filings
Numbers stated in permits, agreements, and decisions, as printed. Each links to the filing.
Ohio Power Siting Board, 26-0361-EL-BGN
- Generator capacity
- 430 MW
Ohio Power Siting Board, 25-0302-EL-BGN
- Generator capacity
- 216 MW
Ohio Power Siting Board, 25-0090-EL-BLN
- Generator capacity
- 120 MW
Public records
5 records found so far. 6 kinds of record are still being collected.
See every recordQuestions people ask
- Where is EdgeConneX New Albany campus?
- EdgeConneX New Albany campus is a data center project in New Albany, Licking County, Ohio.
- Who operates EdgeConneX New Albany campus?
- EdgeConneX is named as the operator of EdgeConneX New Albany campus.
- How big is EdgeConneX New Albany campus?
- The site covers 49 acres.
- What stage is EdgeConneX New Albany campus?
- EdgeConneX New Albany campus is under construction. It was first public in 2025.
Sources
Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.
- 1PowerConneX New Albany 3 Energy Center, public meeting notice (Case 26-0361-EL-BGN)
EdgeConneXTier 2 · Captured 2026-11-09 · Open the source - 2DIS case record for 26-0361-EL-BGN (PowerConneX, Inc.)
Public Utilities Commission of OhioTier 1 · Captured 2026-11-09 · Open the source - 3DIS case record for 25-0302-EL-BGN (PowerConneX, Inc.)
Public Utilities Commission of OhioTier 1 · Captured 2026-11-09 · Open the source - 4OPSB approves PowerConneX 1 generation project (PUCO bulletin)
Ohio Power Siting BoardTier 1 · Captured 2026-11-08 · Open the source - 5Ohio Data Center Tax Exemption Projects Summary (Last Updated 6/10/2026)
Ohio Department of DevelopmentTier 1 · Captured 2026-11-09 · Open the source · Archived copy - 6Data center frequently asked questions
City of New Albany OhioTier 1 · Captured 2026-11-08 · Open the source - 7City of New Albany Ohio Data Center Zoning information sheet (May 2026)
City of New Albany Community Development DepartmentTier 1 · Captured 2026-11-08 · Open the source
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page