Lists from the record

Three rankings computed from the record we publish: the largest tax breaks whose agreements state a dollar value, and the projects we track counted by state and by the company that operates them. The fourth list the record supports, largest projects by announced capacity, has its own page. Big numbers gathers the record's other counts.

Three lists, all computed from the record we publish. The largest stated tax breaks rank the 66 tax agreements whose own record states a dollar value, out of the 218 agreements we track: each value is printed as its record states it, with who stated it. The other two lists are counts of the 1320 projects we track: how many sit in each state, and how many name each operator. The tax break values are never added together: they are estimates and reported totals from different parties, over different terms, in different years.

Largest stated tax breaks

Ranked by the dollar value stated in the agreement's own record. Only 66 of the 218 agreements we track state a value; the other 152 state percentages, rates, or payment schedules with no total, so they cannot be ranked here. 14 of the valued agreements name a place and no single project. The values are never added together.

  • 1. Meta Fort Worth Data Center

    Stated value: $271,164,696

    Stated by: Total agreement amount reported in the City of Fort Worth amendment filing with the Texas Comptroller (amendment 0012683)

    Agreement: Economic development program agreement (Texas Local Government Code Chapter 380)

    Beneficiary, as filed: Winner LLC

    Place: Fort Worth

    Approved: May 19, 2015

    Term: 10 years

  • 2. Meta Huntsville Data Center

    Stated value: $86,250,000

    Stated by: Office of the Governor of Alabama (announcement estimate, June 14, 2018)

    Agreement: Alabama Jobs Act investment credit (State of Alabama)

    Beneficiary, as filed: Facebook

    Place: Huntsville

    Approved: Not dated

    Term: 10 years

  • 3. Meta El Paso data center

    Stated value: $73,000,000

    Stated by: Total agreement amount as reported in the taxing unit filing with the Texas Comptroller

    Agreement: Economic development agreement (Texas Local Government Code Chapter 380)

    Beneficiary, as filed: Wurldwide LLC (Meta)

    Place: El Paso

    Approved: Not dated

  • 4. Apple Reno data center

    Stated value: $62,153,275

    Stated by: Nevada Governor's Office of Economic Development (board packet estimate, restated in GOED's July 25, 2024 release)

    Agreement: Partial tax abatement for data centers (NRS 360.754)

    Beneficiary, as filed: Apple Inc.

    Place: Washoe County

    Approved: July 25, 2024

    Term: 10 years

  • 5. Agreement

    Stated value: $57,719,970

    Stated by: County of Mecklenburg (FY2023 ACFR, Note 20)

    Agreement: Property tax abatement agreements (individually negotiated by the County and its Industrial Development Authority)

    Beneficiary, as filed: Not named in the record

    Place: Mecklenburg County

    Approved: Not dated

  • 6. Meta DeKalb Data Center

    Stated value: $50,000,000

    Stated by: Illinois DCEO, Data Center Investment Program 2025 Annual Report (MOU table, p. 7)

    Agreement: Sales and use tax exemptions and credits (20 ILCS 605/605-1025)

    Beneficiary, as filed: Goldframe LLC

    Place: DeKalb

    Approved: 2021

    Term: 20 years

  • 7. Amazon Data Services, Inc. (AWS)

    Stated value: $42,900,000

    Stated by: Total agreement amount as reported in the taxing unit filing with the Texas Comptroller

    Agreement: Economic development agreement (Texas Local Government Code Chapter 380)

    Beneficiary, as filed: Amazon Data Services, Inc. (AWS)

    Place: Dallas County

    Approved: Not dated

  • 8. Prime ORD Chicago Campus

    Stated value: $32,325,000

    Stated by: Illinois DCEO, Data Center Investment Program 2025 Annual Report (MOU table, p. 7)

    Agreement: Sales and use tax exemptions and credits (20 ILCS 605/605-1025)

    Beneficiary, as filed: Elk Grove Village Property LLC (Phase 1)

    Place: Elk Grove Village

    Approved: 2023

    Term: 20 years

  • 9. Microsoft Medina County data center (SAT89/SAT90)

    Stated value: $32,000,000

    Stated by: Total agreement amount as reported in the taxing unit filing with the Texas Comptroller

    Agreement: Economic development agreement (Texas Local Government Code Chapter 381)

    Beneficiary, as filed: Microsoft Corporation

    Place: Medina County

    Approved: Not dated

  • 10. EdgeConneX Chicago Campus (CHI01/CHI02/CHI03)

    Stated value: $31,327,375

    Stated by: Illinois DCEO, Data Center Investment Program 2025 Annual Report (MOU table, p. 7)

    Agreement: Sales and use tax exemptions and credits (20 ILCS 605/605-1025)

    Beneficiary, as filed: EdgeConneX, Inc.

    Place: Elk Grove Village

    Approved: 2025

    Term: 20 years

  • 11. SDC CHI III, LLC

    Stated value: $28,125,000

    Stated by: Illinois DCEO, Data Center Investment Program 2025 Annual Report (MOU table, p. 7)

    Agreement: Sales and use tax exemptions and credits (20 ILCS 605/605-1025)

    Beneficiary, as filed: SDC CHI III, LLC

    Place: Elk Grove Village

    Approved: 2025

    Term: 20 years

  • 12. EdgeCore Reno Campus

    Stated value: $26,272,322

    Stated by: Nevada Governor's Office of Economic Development (biennial report approval table estimates)

    Agreement: Partial tax abatement for data centers (NRS 360.754)

    Beneficiary, as filed: MECP1 Reno 1, LLC

    Place: Storey County

    Approved: March 2018

    Term: 20 years

  • 13. Meta Altoona Data Center

    Stated value: $26,000,000

    Stated by: Iowa Economic Development Authority FY2025 Annual Report, maximum tax benefit for award 13-HQJTC-040 as amended

    Agreement: State tax benefits under the Iowa High Quality Jobs Program (IEDA award 13-HQJTC-040)

    Beneficiary, as filed: Siculus, Inc.

    Place: Iowa

    Approved: April 23, 2013

  • 14. Digital Realty Franklin Park Campus (ORD12/ORD13/ORD14)

    Stated value: $25,280,147

    Stated by: Illinois DCEO, Data Center Investment Program 2025 Annual Report (MOU table, p. 7)

    Agreement: Sales and use tax exemptions and credits (20 ILCS 605/605-1025)

    Beneficiary, as filed: Digital Realty Trust, LP

    Place: Franklin Park

    Approved: 2020

    Term: 20 years

  • 15. Design LLC

    Stated value: $25,054,937

    Stated by: Nevada Governor's Office of Economic Development (biennial report approval table estimates)

    Agreement: Partial tax abatement for data centers (NRS 360.754)

    Beneficiary, as filed: Design LLC

    Place: Storey County

    Approved: September 2020

    Term: 20 years

  • 16. Microsoft Northlake Data Center (CH1)

    Stated value: $24,258,433

    Stated by: Illinois DCEO, Data Center Investment Program 2025 Annual Report (MOU table, p. 7)

    Agreement: Sales and use tax exemptions and credits (20 ILCS 605/605-1025)

    Beneficiary, as filed: Microsoft Corporation

    Place: Northlake

    Approved: 2021

    Term: 20 years

  • 17. Fleet Data Centers South Valley (Storey County)

    Stated value: $23,350,806

    Stated by: Nevada Governor's Office of Economic Development (board approval release, February 5, 2026)

    Agreement: Partial tax abatement for data centers (NRS 360.754)

    Beneficiary, as filed: SV RNO Property Owner 1, LLC

    Place: Storey County

    Approved: February 5, 2026

  • 18. Microsoft Project Alluvion (West Des Moines)

    Stated value: $20,256,000

    Stated by: Iowa Economic Development Authority

    Agreement: State tax benefits under the Iowa High Quality Jobs Program (IEDA award 14-HQJTC-028)

    Beneficiary, as filed: Microsoft Corporation

    Place: Iowa

    Approved: April 18, 2014

  • 19. Iron Mountain CHI-1 (Des Plaines)

    Stated value: $20,000,000

    Stated by: Illinois DCEO, Data Center Investment Program 2025 Annual Report (MOU table, p. 7)

    Agreement: Sales and use tax exemptions and credits (20 ILCS 605/605-1025)

    Beneficiary, as filed: Iron Mountain Data Centers, LLC

    Place: Des Plaines

    Approved: 2024

    Term: 20 years

  • 20. Microsoft Project Mountain (West Des Moines)

    Stated value: $20,000,000

    Stated by: Iowa Economic Development Authority

    Agreement: State tax benefits under the Iowa High Quality Jobs Program (IEDA award 13-HQJTC-046)

    Beneficiary, as filed: Microsoft Corporation

    Place: Iowa

    Approved: June 21, 2013

  • 21. Meta Eagle Mountain Data Center

    Stated value: $20,000,000

    Stated by: Governor's Office of Economic Opportunity RDA reporting system, Utah County record: Total Funds Authorized to Receive

    Agreement: Tax increment participation under interlocal agreement (Sweet Water #1 Community Reinvestment Area)

    Beneficiary, as filed: Stadion LLC (Sweet Water #1 CRA project area)

    Place: Eagle Mountain

    Approved: Not dated

  • 22. Apple Waukee data center

    Stated value: $19,650,000

    Stated by: Iowa Economic Development Authority

    Agreement: State tax benefits under the Iowa High Quality Jobs Program (IEDA award 18-HQJTC-008)

    Beneficiary, as filed: Apple Inc.

    Place: Iowa

    Approved: August 24, 2017

  • 23. Vantage NV1 (Storey County)

    Stated value: $19,274,000

    Stated by: Nevada Governor's Office of Economic Development (board packet approval figures, November 14, 2024)

    Agreement: Partial tax abatement for data centers (NRS 360.754)

    Beneficiary, as filed: Vantage Data Centers NV12, LLC

    Place: Storey County

    Approved: November 14, 2024

    Term: 10 years

  • 24. Aligned Elk Grove Village Campus (ORD-03)

    Stated value: $17,812,500

    Stated by: Illinois DCEO, Data Center Investment Program 2025 Annual Report (MOU table, p. 7)

    Agreement: Sales and use tax exemptions and credits (20 ILCS 605/605-1025)

    Beneficiary, as filed: Aligned Data Centers (EGV) PropCo, LLC

    Place: Elk Grove Village

    Approved: 2023

    Term: 20 years

  • 25. Serverfarm CH1 (840 South Canal)

    Stated value: $17,812,500

    Stated by: Illinois DCEO, Data Center Investment Program 2025 Annual Report (MOU table, p. 7)

    Agreement: Sales and use tax exemptions and credits (20 ILCS 605/605-1025)

    Beneficiary, as filed: Serverfarm LLC dba SF CH1, LLC

    Place: Chicago

    Approved: 2023

    Term: 20 years

  • 26. Digital Realty Elk Grove Village Campus (CH1/CH2/CH3)

    Stated value: $17,538,022

    Stated by: Illinois DCEO, Data Center Investment Program 2025 Annual Report (MOU table, p. 7)

    Agreement: Sales and use tax exemptions and credits (20 ILCS 605/605-1025)

    Beneficiary, as filed: Digital Realty Trust, LP

    Place: Elk Grove Village

    Approved: 2021

    Term: 20 years

  • 27. NTT Chicago Campus (Itasca)

    Stated value: $17,250,000

    Stated by: Illinois DCEO, Data Center Investment Program 2025 Annual Report (MOU table, p. 7)

    Agreement: Sales and use tax exemptions and credits (20 ILCS 605/605-1025)

    Beneficiary, as filed: NTT Global Data Centers

    Place: Itasca

    Approved: 2020

    Term: 20 years

  • 28. Microsoft Hoffman Estates Campus

    Stated value: $17,187,500

    Stated by: Illinois DCEO, Data Center Investment Program 2025 Annual Report (MOU table, p. 7)

    Agreement: Sales and use tax exemptions and credits (20 ILCS 605/605-1025)

    Beneficiary, as filed: Microsoft Corporation

    Place: Hoffman Estates

    Approved: 2021

    Term: 20 years

  • 29. Centersquare ORD2 (Elk Grove Village)

    Stated value: $17,134,551

    Stated by: Illinois DCEO, Data Center Investment Program 2025 Annual Report (MOU table, p. 7)

    Agreement: Sales and use tax exemptions and credits (20 ILCS 605/605-1025)

    Beneficiary, as filed: 2425 Busse Road LLC (CenterSquare ORD2)

    Place: Elk Grove Village

    Approved: 2025

    Term: 20 years

  • 30. Cigna Windsor Data Center

    Stated value: $17,095,436

    Stated by: Connecticut DECD FY2025 Annual Report, Table 14 (Tax Rebates Earned, 2023-2025)

    Agreement: Tax incentive agreement program (Public Act 21-1 of the February 2021 special session, HB 6514)

    Beneficiary, as filed: Cigna Corporation

    Place: Windsor

    Approved: Not dated

  • 31. Greensparc Cordova Data Center

    Stated value: $17,000,000

    Stated by: AIDEA board minutes, June 17, 2025

    Agreement: AIDEA term loan, Resolution G25-03 (state development finance; a loan, not a tax abatement)

    Beneficiary, as filed: Greensparc Inc.

    Place: Chugach Census Area

    Approved: June 17, 2025

    Term: 5 years

  • 32. HydraVault Chicago

    Stated value: $16,875,000

    Stated by: Illinois DCEO, Data Center Investment Program 2025 Annual Report (MOU table, p. 7)

    Agreement: Sales and use tax exemptions and credits (20 ILCS 605/605-1025)

    Beneficiary, as filed: HydraVault LLC

    Place: Chicago

    Approved: 2025

    Term: 20 years

  • 33. SSDC1, LLC

    Stated value: $16,770,000

    Stated by: Total agreement amount as reported in the taxing unit filing with the Texas Comptroller

    Agreement: Economic development agreement (Texas Local Government Code Chapter 380)

    Beneficiary, as filed: SSDC1, LLC

    Place: Hopkins County

    Approved: Not dated

  • 34. Google Council Bluffs data center campus

    Stated value: $16,600,000

    Stated by: City of Council Bluffs staff estimate in the October 10, 2022 Council Communication and Resolution 22-256

    Agreement: Local property tax abatement under the Iowa High Quality Jobs program (joint City of Council Bluffs and Google LLC application to IEDA, authorized by City Resolution 22-256)

    Beneficiary, as filed: Google LLC

    Place: Council Bluffs

    Approved: October 10, 2022

    Term: 20 years

  • 35. Chirisa Volo Data Center

    Stated value: $16,375,000

    Stated by: Illinois DCEO, Data Center Investment Program 2025 Annual Report (MOU table, p. 7)

    Agreement: Sales and use tax exemptions and credits (20 ILCS 605/605-1025)

    Beneficiary, as filed: Chirisa Volo LLC

    Place: Volo

    Approved: 2023

    Term: 20 years

  • 36. Centersquare ORD4 (Lisle)

    Stated value: $16,148,419

    Stated by: Illinois DCEO, Data Center Investment Program 2025 Annual Report (MOU table, p. 7)

    Agreement: Sales and use tax exemptions and credits (20 ILCS 605/605-1025)

    Beneficiary, as filed: 4513 Western Avenue LLC (Centersquare ORD4)

    Place: Lisle

    Approved: 2025

    Term: 20 years

  • 37. Metro Edge IMD1 (Illinois Medical District)

    Stated value: $16,070,247

    Stated by: Illinois DCEO, Data Center Investment Program 2025 Annual Report (MOU table, p. 7)

    Agreement: Sales and use tax exemptions and credits (20 ILCS 605/605-1025)

    Beneficiary, as filed: MEDP Mission Critical Facility, LLC dba Metro Edge

    Place: Chicago

    Approved: 2023

    Term: 20 years

  • 38. Aligned Chicago Campus (ORD-01, ORD-02)

    Stated value: $15,781,250

    Stated by: Illinois DCEO, Data Center Investment Program 2025 Annual Report (MOU table, p. 7)

    Agreement: Sales and use tax exemptions and credits (20 ILCS 605/605-1025)

    Beneficiary, as filed: Aligned Data Centers

    Place: Northlake

    Approved: 2021

    Term: 20 years

  • 39. Microsoft Elk Grove Village Campus

    Stated value: $15,750,000

    Stated by: Illinois DCEO, Data Center Investment Program 2025 Annual Report (MOU table, p. 7)

    Agreement: Sales and use tax exemptions and credits (20 ILCS 605/605-1025)

    Beneficiary, as filed: Microsoft Corporation

    Place: Elk Grove Village

    Approved: 2020

    Term: 20 years

  • 40. T5@CHI III Northlake

    Stated value: $15,750,000

    Stated by: Illinois DCEO, Data Center Investment Program 2025 Annual Report (MOU table, p. 7)

    Agreement: Sales and use tax exemptions and credits (20 ILCS 605/605-1025)

    Beneficiary, as filed: T5@Chicago III, LP

    Place: Northlake

    Approved: 2024

    Term: 20 years

  • 41. CyrusOne Wood Dale Campus

    Stated value: $15,625,000

    Stated by: Illinois DCEO, Data Center Investment Program 2025 Annual Report (MOU table, p. 7)

    Agreement: Sales and use tax exemptions and credits (20 ILCS 605/605-1025)

    Beneficiary, as filed: C1 Chicago 1 LLC - C1 Chicago 2 LLC

    Place: Wood Dale

    Approved: 2024

    Term: 20 years

  • 42. CyrusOne Aurora Campus (CHI1-CHI3)

    Stated value: $15,625,000

    Stated by: Illinois DCEO, Data Center Investment Program 2025 Annual Report (MOU table, p. 7)

    Agreement: Sales and use tax exemptions and credits (20 ILCS 605/605-1025)

    Beneficiary, as filed: C1 Chicago Aurora III LLC

    Place: Aurora

    Approved: 2024

    Term: 20 years

  • 43. CyrusOne CHI-11 West Yorkville Campus

    Stated value: $15,625,000

    Stated by: Illinois DCEO, Data Center Investment Program 2025 Annual Report (MOU table, p. 7)

    Agreement: Sales and use tax exemptions and credits (20 ILCS 605/605-1025)

    Beneficiary, as filed: C1 Yorkville LLC

    Place: Yorkville

    Approved: 2024

    Term: 20 years

  • 44. CoreSite Chicago Campus (CH1, CH2)

    Stated value: $15,625,000

    Stated by: Illinois DCEO, Data Center Investment Program 2025 Annual Report (MOU table, p. 7)

    Agreement: Sales and use tax exemptions and credits (20 ILCS 605/605-1025)

    Beneficiary, as filed: CoreSite, L.P.

    Place: Chicago

    Approved: 2020

    Term: 20 years

  • 45. CyrusOne Aurora Campus (CHI1-CHI3)

    Stated value: $15,625,000

    Stated by: Illinois DCEO, Data Center Investment Program 2025 Annual Report (MOU table, p. 7)

    Agreement: Sales and use tax exemptions and credits (20 ILCS 605/605-1025)

    Beneficiary, as filed: CyrusOne (C1 Chicago)

    Place: Aurora

    Approved: 2022

    Term: 20 years

  • 46. EdgeConneX Chicago Campus (CHI01/CHI02/CHI03)

    Stated value: $15,625,000

    Stated by: Illinois DCEO, Data Center Investment Program 2025 Annual Report (MOU table, p. 7)

    Agreement: Sales and use tax exemptions and credits (20 ILCS 605/605-1025)

    Beneficiary, as filed: EdgeConneX, Inc.

    Place: Elk Grove Village

    Approved: 2023

    Term: 20 years

  • 47. Equinix Elk Grove Village Campus (CH3, CH5)

    Stated value: $15,625,000

    Stated by: Illinois DCEO, Data Center Investment Program 2025 Annual Report (MOU table, p. 7)

    Agreement: Sales and use tax exemptions and credits (20 ILCS 605/605-1025)

    Beneficiary, as filed: Equinix LLC

    Place: Elk Grove Village

    Approved: 2024

    Term: 20 years

  • 48. QTS Chicago Mega Data Center

    Stated value: $15,625,000

    Stated by: Illinois DCEO, Data Center Investment Program 2025 Annual Report (MOU table, p. 7)

    Agreement: Sales and use tax exemptions and credits (20 ILCS 605/605-1025)

    Beneficiary, as filed: Quality Technology Service (QTS)

    Place: Chicago

    Approved: 2021

    Term: 20 years

  • 49. SDC CHI I, LLC

    Stated value: $15,625,000

    Stated by: Illinois DCEO, Data Center Investment Program 2025 Annual Report (MOU table, p. 7)

    Agreement: Sales and use tax exemptions and credits (20 ILCS 605/605-1025)

    Beneficiary, as filed: SDC CHI I, LLC

    Place: Elk Grove Village

    Approved: 2021

    Term: 20 years

  • 50. SDC CHI II Busse, LLC

    Stated value: $15,625,000

    Stated by: Illinois DCEO, Data Center Investment Program 2025 Annual Report (MOU table, p. 7)

    Agreement: Sales and use tax exemptions and credits (20 ILCS 605/605-1025)

    Beneficiary, as filed: SDC CHI II Busse, LLC

    Place: Elk Grove Village

    Approved: 2022

    Term: 20 years

  • 51. STACK CHI01 (Elk Grove Village)

    Stated value: $15,625,000

    Stated by: Illinois DCEO, Data Center Investment Program 2025 Annual Report (MOU table, p. 7)

    Agreement: Sales and use tax exemptions and credits (20 ILCS 605/605-1025)

    Beneficiary, as filed: STACK Infrastructure

    Place: Elk Grove Village

    Approved: 2020

    Term: 20 years

  • 52. T5@Chicago (Chicago I and II)

    Stated value: $15,625,000

    Stated by: Illinois DCEO, Data Center Investment Program 2025 Annual Report (MOU table, p. 7)

    Agreement: Sales and use tax exemptions and credits (20 ILCS 605/605-1025)

    Beneficiary, as filed: T5@Chicago II, LLC

    Place: Elk Grove Village

    Approved: 2020

    Term: 20 years

  • 53. T5@Chicago IV Grayslake Campus

    Stated value: $15,625,000

    Stated by: Illinois DCEO, Data Center Investment Program 2025 Annual Report (MOU table, p. 7)

    Agreement: Sales and use tax exemptions and credits (20 ILCS 605/605-1025)

    Beneficiary, as filed: T5@Chicago IV, LP

    Place: Grayslake

    Approved: 2025

    Term: 20 years

  • 54. Vantage NV1 (Storey County)

    Stated value: $11,531,616

    Stated by: Nevada Governor's Office of Economic Development (board packet approval figures, March 21, 2024)

    Agreement: Partial tax abatement for data centers (NRS 360.754)

    Beneficiary, as filed: Vantage Data Centers NV11, LLC

    Place: Storey County

    Approved: March 21, 2024

    Term: 10 years

  • 55. STACK Lancaster

    Stated value: $5,120,000

    Stated by: Total agreement amount as reported in the taxing unit filing with the Texas Comptroller

    Agreement: Economic development agreement (Texas Local Government Code Chapter 380)

    Beneficiary, as filed: SI DFW02A, LLC (STACK Infrastructure)

    Place: Lancaster

    Approved: Not dated

  • 56. Microsoft Project Osmium (West Des Moines)

    Stated value: $4,725,000

    Stated by: Iowa Economic Development Authority

    Agreement: State tax benefits under the Iowa High Quality Jobs Program (IEDA award 17-HQJTC-006)

    Beneficiary, as filed: Microsoft Corporation

    Place: Iowa

    Approved: July 22, 2016

  • 57. Colovore RNO01

    Stated value: $4,076,970

    Stated by: Nevada Governor's Office of Economic Development (board approval release, August 5, 2026)

    Agreement: Partial tax abatement for data centers (NRS 360.754)

    Beneficiary, as filed: Colovore Reno 1, LLC

    Place: Storey County

    Approved: August 5, 2026

  • 58. Company not named in the city's filing (filer listed the City of Glenn Heights)

    Stated value: $3,000,000

    Stated by: Total agreement amount as reported in the taxing unit filing with the Texas Comptroller

    Agreement: Economic development agreement (Texas Local Government Code Chapter 380)

    Beneficiary, as filed: Company not named in the city's filing (filer listed the City of Glenn Heights)

    Place: Dallas County

    Approved: Not dated

  • 59. Meta Fort Worth Data Center

    Stated value: $2,800,000

    Stated by: Tarrant County fiscal note (Commissioners Court Communication 133917): maximum 10-year county abatement estimated at $2.8 million, plus just under $1.8 million for the hospital district

    Agreement: Tax abatement agreement, county participation (Texas Tax Code Chapter 312)

    Beneficiary, as filed: Winner LLC

    Place: Tarrant County

    Approved: October 6, 2020

    Term: 10 years

  • 60. Lancium Clean Campus data centers (Crusoe)

    Stated value: $2,500,000

    Stated by: Development Corporation of Abilene

    Agreement: Performance agreement (water and sewer reimbursement)

    Beneficiary, as filed: Lancium

    Place: Abilene

    Approved: December 21, 2021

  • 61. Lancium LLC

    Stated value: $595,000

    Stated by: Total agreement amount as reported in the taxing unit filing with the Texas Comptroller

    Agreement: Economic development agreement (Texas Local Government Code Chapter 380)

    Beneficiary, as filed: Lancium LLC

    Place: Pecos County

    Approved: Not dated

  • 62. DDI Garland LLC (Digital Realty Garland Data Center)

    Stated value: $500,000

    Stated by: Total agreement amount as reported in the taxing unit filing with the Texas Comptroller

    Agreement: Economic development agreement (Texas Local Government Code Chapter 380)

    Beneficiary, as filed: DDI Garland LLC (Digital Realty Garland Data Center)

    Place: Garland

    Approved: Not dated

  • 63. Digital Realty Trust, L.P.

    Stated value: $200,000

    Stated by: Total agreement amount as reported in the taxing unit filing with the Texas Comptroller

    Agreement: Economic development agreement (Texas Local Government Code Chapter 380)

    Beneficiary, as filed: Digital Realty Trust, L.P.

    Place: Dallas

    Approved: Not dated

  • 64. Bitcoin Mining Institute LLC

    Stated value: $100,000

    Stated by: Total agreement amount as reported in the taxing unit filing with the Texas Comptroller

    Agreement: Economic development agreement (Texas Local Government Code Chapter 380)

    Beneficiary, as filed: Bitcoin Mining Institute LLC

    Place: Anderson County

    Approved: Not dated

  • 65. Bitcoin Mining Institute LLC

    Stated value: $100,000

    Stated by: Total agreement amount as reported in the taxing unit filing with the Texas Comptroller

    Agreement: Economic development agreement (Texas Local Government Code Chapter 380)

    Beneficiary, as filed: Bitcoin Mining Institute LLC

    Place: Anderson County

    Approved: Not dated

  • 66. CoreWeave, Inc.

    Stated value: $100,000

    Stated by: Total agreement amount as reported in the taxing unit filing with the Texas Comptroller

    Agreement: Economic development agreement (Texas Local Government Code Chapter 380)

    Beneficiary, as filed: CoreWeave, Inc.

    Place: Plano

    Approved: Not dated

The tax break per job calculator divides a stated value by the jobs the same record commits to, where both are stated.

Most tracked projects by state

A count of the 1320 projects we track, by the state each one sits in. All 51 states and districts with a tracked project are listed. The count covers our tracked record, not every data center in a state.

Most tracked projects by operator

A count of tracked projects by the company the record names as facility operator, the company that runs the site. The top 25 of the 152 operators the record names are listed. A project that names two operators counts once under each.

How to read these lists

A stated value is not a received value. The tax break list ranks the figure in each agreement's own record: a governor's estimate at announcement, a total a taxing unit reported to a state comptroller, an amount a county audit recorded for one year. Each row names who stated the figure, and the receipt points to the exact place in the document it comes from.

No totals. The stated values cover different terms and different years and come from different parties, so this page adds none of them together. The state and operator lists are counts of projects, and they are labeled as counts wherever they appear.

The subset boundary is the story. 152 of the 218 agreements we track state no dollar total at all, including some of the largest agreements in the record, so the tax break list ranks the 66 that do and says so at the top. An agreement missing from that list is missing a published total, not missing a tax break.

Counts are of the tracked record. We track projects of at least 5 megawatts and projects a public list names as data centers, in 51 states and districts. A state or operator count can rise because we found more of the record, not only because more was built.

Every figure is draft research: traced to the publisher's own filing, agreement, or release by an AI research agent and not yet through verification. Each receipt says so.

The other side of the same record

A stated tax break is one side of an agreement. The other side is on the same record: the conditions each agreement carries, printed on its row's source, and each project's own page, which holds its tax agreements, its job commitments, and what officials and residents said about it. Of the 48 projects named on the tax break list, 8 carry an impact record covering property tax, tax breaks, electricity, water, jobs, community, neighbors, and voice. For the rest, and for the 14 valued agreements that name a place and no single project, we checked their impact records and project pages and hold none staged yet; that is stated here rather than left blank.

This page sits under What it means for locals. Its sibling pages keep the same kind of record: largest projects by announced capacity, grid load growth by state for the load utilities say is coming, and measured water use for the water figures operators publish.

  1. What the record shows · November 28, 2026

    Loudoun County data centers: the complete record

    Loudoun County's 128 data centers paid $684.8 million in equipment tax in fiscal 2024, at the full county rate. The record, from the county's books.

  2. What the record shows · November 22, 2026

    SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days

    Per SpaceX's Form 424B4, xAI Colossus 2 in Memphis runs two clusters online: about 110,000 GB200 processors at about 210 MW, and 110,000 GB300 processors at 220 MW, 430 MW in total.

Questions people ask

What is the largest tax break a data center has been given?
The largest stated tax break in the record is $271,164,696 for Meta Fort Worth Data Center in Fort Worth, under Economic development program agreement (Texas Local Government Code Chapter 380). The value is stated by Total agreement amount reported in the City of Fort Worth amendment filing with the Texas Comptroller (amendment 0012683), and it is printed with its source on its row above. A stated value is the figure in the agreement's own record: an estimate or a reported total, not an audited amount a project has already received.
Why does the tax break list rank only 66 of the 218 agreements?
Because only 66 of the 218 agreements we track state a dollar value in a record we have found. The other 152 state their terms as percentages, rates, or payment schedules with no total, and a ranking needs a figure. An agreement with no stated value is not a small agreement: some of the largest, including the Wasco County Strategic Investment Program agreement in Oregon, publish their terms with no total at all.
Why is there no combined total for the tax breaks?
Because the values are not the same kind of figure. One is a governor's estimate at announcement, one is a total reported in a filing years later, one is an amount a county audit recorded for a single year. They cover different terms and different years, so adding them would produce a number no record states. Each value stands on its own row with who stated it.
Which state has the most data centers?
Of the projects we track, Virginia has the most, with 231 of the 1320 tracked projects. That is a count of our tracked record, which covers projects of at least 5 megawatts and projects a public list names as data centers; it is not a census of every data center in the state.
Which company operates the most tracked data centers?
DataBank is named as facility operator on 80 of the projects we track, the most of the 152 operators the record names. The count uses the facility operator role only: the company that runs the site. Developers, utilities, and landowners named on the same projects are counted on their own company pages, not here. A project that names two operators counts once under each.

Sources

  1. 1
    City Secretary Contract No. 46727: Tax Abatement Agreement with Winner LLC
    City of Fort Worth, City Secretary
    Tier 1 · Open the source
  2. 2
    Governor Ivey Announces Facebook to Invest $750 Million in New Data Center in Huntsville
    Office of the Governor of Alabama
    Tier 1 · Open the source
  3. 3
    Local Development Agreement Database (SB 1340), Chapter 380/381 agreements dataset
    Texas Comptroller of Public Accounts
    Tier 1 · Open the source
  4. 4
    Apple, Inc. Data Center Tax Abatement Board Packet (Item 7-B, GOED Board, July 25, 2024)
    Nevada Governor's Office of Economic Development
    Tier 1 · Open the source
  5. 5
    Annual Comprehensive Financial Report, Year Ended June 30, 2023
    County of Mecklenburg, Virginia
    Tier 1 · Open the source
  6. 6
    Data Center Investment Program 2025 Annual Report
    Illinois Department of Commerce and Economic Opportunity
    Tier 1 · Open the source
  7. 7
    GOED Biennial Report to the Legislature on Abatements from Taxation, FY2010-FY2022 (NRS 231.0685)
    Nevada Governor's Office of Economic Development
    Tier 1 · Open the source
  8. 8
    Iowa Economic Development Authority 2015 Annual Report, Annual Report by Status (report dated January 1, 2015)
    Iowa Economic Development Authority
    Tier 1 · Open the source
  9. 9
    Governor's Office of Economic Development Approves $80.9 Million in Tax Ababatements (February 5, 2026 board approvals release)
    Nevada Governor's Office of Economic Development
    Tier 1 · Open the source
  10. 10
    Iowa Economic Development Authority FY2025 Annual Report (report dated January 31, 2026)
    Iowa Economic Development Authority
    Tier 1 · Open the source
  11. 11
    RDA Yearly Report Taxing Entity: 2025 - UTAH CNTY - Sweet Water #1 CRA
    Utah Governor's Office of Economic Opportunity (GOED RDA reporting system)
    Tier 1 · Open the source
  12. 12
    GOED Board Packet: Vantage Data Centers NV12, LLC (November 14, 2024 meeting), Item 8.A
    Nevada Governor's Office of Economic Development
    Tier 1 · Open the source
  13. 13
    DECD 2025 Annual Report (FY 2025)
    Connecticut Department of Economic and Community Development
    Tier 1 · Open the source
  14. 14
    AIDEA Board Meeting Minutes, June 17, 2025 (Resolution G25-03, Greensparc term loan)
    Alaska Industrial Development and Export Authority
    Tier 1 · Open the source
  15. 15
    Resolution No. 22-256 authorizing a joint application to the Iowa Economic Development Authority by the City of Council Bluffs and Google LLC for benefits under the High Quality Jobs Program
    City of Council Bluffs
    Tier 1 · Open the source
  16. 16
    GOED Board Packet: Vantage Data Centers NV11, LLC (March 21, 2024 meeting), Item 8.B
    Nevada Governor's Office of Economic Development
    Tier 1 · Open the source
  17. 17
    GOED Board Approves $190.6M in Tax Abatements (August 5, 2026 board approvals release)
    Nevada Governor's Office of Economic Development
    Tier 1 · Open the source
  18. 18
    Commissioners Court Communication 133917: Tax Abatement Agreement between Tarrant County and Winner LLC
    Tarrant County
    Tier 1 · Open the source
  19. 19
    DCOA Board Meeting Packet, August 5, 2025
    Development Corporation of Abilene
    Tier 1 · Open the source

Back to What it means for locals

Cite this page

Copy this citation when you reuse a figure or a finding from this page.

Data Center Fact Check. "Lists from the record." Updated 2026-11-29. Accessed 2026-11-29. https://datacenterfactcheck.org/benefits/record-lists