Data centers in Tennessee

Draft research: figures were traced to their sources by an AI research agent and have not passed verification yet.

Data Center Fact Check tracks 21 data center projects in Tennessee as of November 2026: 18 operating, 1 in permitting and 1 cancelled, totaling about 830 MW announced where a figure is published.

Tennessee has 21 tracked data centers. Their announced capacity totals about 830 MW where a figure is published. Of those, 18 operating, 1 in permitting and 1 cancelled. Every project we track here is listed below, with the public records behind it. Every figure comes from the public record linked on this page.

xAI Colossus video · 2 min 5 sec

Full project file: xAI Colossus (Memphis)

21Data center projects we track

Data center projects in Tennessee

Who serves this place

  • Not collected yet.

Counties and cities in Tennessee

Counties

Cities and towns

For homeowners

What the projects here mean if you live nearby

Each fact says which way it runs: comes to the community (such as tax paid), comes from the community (such as water or a tax break), or goes both ways. The labels show direction, not whether it is good or bad. How we work

  1. Property tax

    • xAI Colossus 2 (Memphis, Whitehaven):This campus is privately owned, and no tax break for it was found; its tax bills are not published.

      Not known yet
    • xAI Colossus (Memphis):This site pays full property taxes, and the city voted to steer part of that revenue to the surrounding area.

      Comes to the community
  2. Tax breaks

  3. Money for schools and services

  4. Electricity bill

    • xAI Colossus 2 (Memphis, Whitehaven):MLGW gives this campus only a small general-services supply; its main power is generated at a linked plant across the state line.

      Comes from the community
    • xAI Colossus (Memphis):MLGW and TVA supply this site, with 150 megawatts approved in 2024 and a further increment approved in 2026.

      Comes from the community
  5. Water

    • xAI Colossus (Memphis):MLGW supplies this site's water, and xAI is building a recycled water plant next door.

      Comes from the community
    • xAI Colossus 2 (Memphis, Whitehaven):MLGW supplies this campus through a pre-existing 8-inch water main, and the utility records no request for more.

      Comes from the community
  6. Jobs

  7. Next door: height, setbacks, noise

    • xAI Colossus 2 (Memphis, Whitehaven):The contested record for this campus sits across the state line, where its power plant drew a public hearing and a federal lawsuit.

      Goes both ways
    • xAI Colossus (Memphis):County commissioners urged a public hearing before the turbine permit decision, citing the South Memphis site.

      Goes both ways
  8. Your say

    • xAI Colossus 2 (Memphis, Whitehaven):Residents had formal channels on the linked plant's permit: a public comment period and a noticed public hearing in Mississippi.

      How to take part
    • xAI Colossus (Memphis):Residents had formal channels: a county-urged permit hearing and a city council vote on the tax ordinance.

      How to take part

Tax breaks and payments

  • Sales and use tax exemption with a reduced electricity rate (Tenn. Code Ann. Sections 67-6-102 and 67-6-206(c))

    A qualified data center may purchase computers, computer networks, software, systems, and peripheral devices, including repair, installation, warranties, and service contracts, exempt from sales and use tax. Backup power infrastructure and cooling equipment used primarily for and necessary to the operation of the data center are also exempt. Electricity for a qualified data center is taxed at a reduced state rate of 1.5 percent instead of the standard rate.

Recent cases and dockets in Tennessee

All 3 court cases and commission dockets in Tennessee

Bills and laws in Tennessee

Open Bill Watch

Newswire for Tennessee

  1. What the record shows · November 22, 2026

    SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days

  2. What the record shows · November 28, 2026

    Loudoun County data centers: the complete record

  3. What the record shows · November 22, 2026

    PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

Questions people ask

How many data centers are in Tennessee?
Data Center Fact Check tracks 21 data center projects in Tennessee as of November 2026. Of those, 18 operating, 1 in permitting and 1 cancelled.
What is the biggest data center in Tennessee?
By announced capacity, the biggest data center in Tennessee is xAI Colossus 2 (Memphis, Whitehaven), announced at 430 MW. It is operating.
How much power do data centers in Tennessee use?
The 21 projects tracked in Tennessee have announced about 830 MW of capacity in total, where a figure is published. That is announced capacity, not measured electricity use.

Sources

  1. 1
    How big is xAI's presence in Memphis area? A guide to its 3 campuses
    Memphis Commercial Appeal
    Tier 3 · Open the source
  2. 2
    Minutes, Meeting of the City Council, City of Memphis, August 19, 2025
    City of Memphis
    Tier 1 · Open the source
  3. 3
    2025 xAI Update (MLGW published briefing, May 2025)
    Memphis Light, Gas and Water
    Tier 1 · Open the source
  4. 4
    MLGW Statement on xAI (July 22, 2025)
    Memphis Light, Gas and Water
    Tier 1 · Open the source
  5. 5
    Response to Comments and Preliminary Determination, MZX Tech LLC, PSD Permit to Construct No. 0680-00119 (complete packet)
    Mississippi Department of Environmental Quality
    Tier 1 · Open the source
  6. 6
    enSearch Online facility record, Agency Interest No. 12592 (MZX Tech LLC)
    Mississippi Department of Environmental Quality
    Tier 1 · Open the source
  7. 7
    TVA Board Resolution and Memorandum, Exhibit 11/07/24G: Greater than 100 MW firm power arrangement with CTC Property LLC (xAI)
    Tennessee Valley Authority
    Tier 1 · Open the source
  8. 8
    xAI Phase One Substation #63 Providing 150MW of Power to Facility (press release, May 1, 2025)
    Greater Memphis Chamber
    Tier 2 · Open the source
  9. 9
    TVA Board Resolution (Power Availability), February 11, 2026, Exhibit 02/11/26E
    Tennessee Valley Authority
    Tier 1 · Open the source
  10. 10
    Velocity Meets Potency: xAI Announces Memphis as New Home (press release, June 5, 2024)
    Greater Memphis Chamber
    Tier 2 · Open the source
  11. 11
    xAI - Greater Memphis Chamber (project page: Pidgeon Industrial Park, 552 acres, live 2024-08-08, about 300 MW)
    Greater Memphis Chamber
    Tier 1 · Open the source
  12. 12
    xAI Memphis Announces Expansion Of Supercomputer with Addition Of Tech Companies In Digital Delta
    Greater Memphis Chamber
    Tier 1 · Open the source
  13. 13
    Shelby County Commission resolution urging a public hearing before approval or denial of the permit submitted by CTC Property LLC (as amended in committee, March 25, 2025)
    Shelby County Commission
    Tier 1 · Open the source
  14. 14
    Tennessee Sales and Use Tax Manual, August 2026 (Chapter 1 rates table; exemptions chapter, Qualified Data Center, p. 245)
    Tennessee Department of Revenue
    Tier 1 · Open the source

Cite this page

Copy this citation when you reuse a figure or a finding from this page.

Data Center Fact Check. "Tennessee." Accessed 2026-11-29. https://datacenterfactcheck.org/places/us-tn