Bitdeer Knoxville
Knoxville,Knox County,TennesseeOperatingFiling entity: Bitdeer Technologies GroupLast checked Nov 8, 2026
BitdeerDeveloper and operator
Details confirmed
Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.
4 of 6 details confirmed
- Confirmed: County
- Confirmed: City or address
- Confirmed: Stage
- Confirmed: Capacity
- Still to confirm: Electric utility
- Still to confirm: First public date
What happens next: No upcoming date is on record.
Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.
Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.
Bitdeer Knoxville is an operating data center project in Knoxville, Knox County, Tennessee. Bitdeer is named as operator. It was announced at 86 MW.
Bitdeer Knoxville is an operating data center project in Knoxville, Knox County, Tennessee. Bitdeer is named as operator. It was announced at 86 MW. 4 of the six core facts we track for every project are confirmed on this page.
Where this project sits
This project sits in Knoxville, Knox County, Tennessee. Each place page carries the projects tracked there, who provides its power and water, and its local rules.
For homeowners
What this project means if you live nearby
We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
Laws and bills that may apply here
Found by each bill's own place and size rules. Each one says who has checked it so far.
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Tennessee HB 1847: Bars utilities from absorbing data center electrical infrastructure costs
The act covers data centers projected to have a peak electric demand of fifty megawatts or more during the first three years of operation, whose electrical infrastructure costs a municipality or electric utility may not pay or absorb, for conduct and contracts on or after May 7, 2026; this project has 86 MW on record (grid connection), but the project's projected peak electric demand during its first three years of operation is not on record.
“Is projected to have a peak electric demand of fifty megawatts (50 MW) or more during the first three (3) years of operation.” (SECTION 1, TCA 7-70-101(2)(A)(ii))
Rule checks: Project is in Tennessee; 86 MW on record (grid connection), threshold 50 MW (SECTION 1, TCA 7-70-101(2)(A)(ii)). Still to check: dates: not checked, who it covers: not checked
Bills and laws in Tennessee
- HB 2061 · Died or failedRequires data centers to register and report power and water use
- SB 1682 · Died or failedRequires data centers to register and report power and water use
- SB 2128 · Signed into law · May 18, 2026Bars utilities from absorbing data center electrical infrastructure costs
- HB 1847 · In effect · May 7, 2026Bars utilities from absorbing data center electrical infrastructure costs
- SB 1832 · Died or failed · Mar 10, 2026Requires computing facilities to devote half their output to public benefit
- SB 1999 · Died or failed · Mar 10, 2026Makes large data centers help fund grid upgrades through tariffs
Who's involved
- Developer and operatorBitdeer
Power
Capacity, as announced or filed
- 86 MW · Site electrical capacityDec 2025 · grid connection
- 37 MW · AI data center conversion, phase 1Jul 2026 · what the figure measures is not stated
- 49 MW · AI data center conversion, phase 2Jul 2026 · what the figure measures is not stated
Public records
0 records found so far. 9 kinds of record are still being collected.
Questions people ask
- Where is Bitdeer Knoxville?
- Bitdeer Knoxville is a data center project in Knoxville, Knox County, Tennessee.
- Who operates Bitdeer Knoxville?
- Bitdeer is named as the operator of Bitdeer Knoxville.
- How big is Bitdeer Knoxville?
- Bitdeer Knoxville was announced at 86 MW of capacity.
- What stage is Bitdeer Knoxville?
- Bitdeer Knoxville is operating.
Sources
Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.
- 1Bitdeer Announces November 2025 Production and Operations Update
Bitdeer Technologies GroupTier 4 · Captured 2026-11-08 · Open the source - 2Bitdeer Announces June 2026 Production and Operations Update
Bitdeer Technologies GroupTier 4 · Captured 2026-11-08 · Open the source
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page