city Card
Data centers in Franklin, Tennessee
Draft research: figures were traced to their sources by an AI research agent and have not passed verification yet.
Data Center Fact Check tracks 2 data center projects in Franklin, Tennessee as of November 2026, totaling about 9 MW announced where a figure is published.
Franklin has 2 tracked data centers. Their announced capacity totals about 9 MW where a figure is published. Of those, 2 operating. The projects here are Flexential Nashville - Cool Springs and Flexential Nashville - Franklin. Every figure comes from the public record linked on this page.
Data center projects in Franklin
- Flexential Nashville - Cool Springs
OperatingFranklin3 MW announced
- Flexential Nashville - Franklin
OperatingFranklin6 MW announced
Who serves this place
- Not collected yet.
More places in Williamson County
Franklin is part of Williamson County.
Nearby places
- Brentwood1 data center project tracked
Court cases and commission dockets in Tennessee (3)
Bills and laws in Tennessee
- HB 2061 · Died or failedRequires data centers to register and report power and water use
- SB 1682 · Died or failedRequires data centers to register and report power and water use
- SB 2128 · Signed into law · May 18, 2026Bars utilities from absorbing data center electrical infrastructure costs
- HB 1847 · In effect · May 7, 2026Bars utilities from absorbing data center electrical infrastructure costs
- SB 1832 · Died or failed · Mar 10, 2026Requires computing facilities to devote half their output to public benefit
- SB 1999 · Died or failed · Mar 10, 2026Makes large data centers help fund grid upgrades through tariffs
- SB 2584 · Died or failed · Mar 10, 2026Lets qualified data centers certify compliance for job tax credits
- HB 1461 · Died or failed · Mar 4, 2026Requires computing facilities to devote half their output to public benefit
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
Questions people ask
- How many data centers are in Franklin?
- Data Center Fact Check tracks 2 data center projects in Franklin as of November 2026. Of those, 2 operating.
- What is the biggest data center in Franklin?
- By announced capacity, the biggest data center in Franklin is Flexential Nashville - Franklin, announced at 6 MW. It is operating.
- How much power do data centers in Franklin use?
- The 2 projects tracked in Franklin have announced about 9 MW of capacity in total, where a figure is published. That is announced capacity, not measured electricity use.
Sources
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "Franklin." Accessed 2026-11-29. https://datacenterfactcheck.org/places/us-tn-franklin-city
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page