Project File

xAI Colossus (Memphis)

Memphis,Shelby County,TennesseeOperatingFirst public 2024Filing entity: CTC Property LLCLast checked Nov 9, 2026

xAIDeveloper and operatorSpaceXCompute providerMLGWElectric utilityAnthropicEnd user

Saved in this browser; see it under My feed. Email alerts are not available yet.

Details confirmed

Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.

6 of 6 details confirmed

  • Confirmed: County
  • Confirmed: City or address
  • Confirmed: Stage
  • Confirmed: Capacity
  • Confirmed: Electric utility
  • Confirmed: First public date
Know the record? Send it to us

What happens next: No upcoming date is on record.

Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.

Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.

xAI Colossus (Memphis) is an operating data center project in Memphis, Shelby County, Tennessee. xAI is named as operator. It was first public in 2024. It was announced at 300 MW.

xAI Colossus (Memphis) is an operating data center project in Memphis, Shelby County, Tennessee. xAI is named as operator. It was announced at 300 MW. All six of the core facts we track for every project are confirmed on this page.

Where this project sits

This project sits in Memphis, Shelby County, Tennessee. Each place page carries the projects tracked there, who provides its power and water, and its local rules.

xAI Colossus video · 2 min 5 sec

Newswire for xAI Colossus (Memphis)

  1. What the record shows · November 22, 2026

    SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days

  2. What the record shows · November 28, 2026

    Loudoun County data centers: the complete record

  3. What the record shows · November 22, 2026

    PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

300 MWAnnounced capacity
10Public records we have found

For homeowners

What this project means if you live nearby

Each fact says which way it runs: comes to the community (such as tax paid), comes from the community (such as water or a tax break), or goes both ways. The labels show direction, not whether it is good or bad. How we work

  1. Property tax

    This site pays full property taxes, and the city voted to steer part of that revenue to the surrounding area.

    Comes to the community
  2. Tax breaks

    No tax break for xAI at this site appears in any record read this pass.

    Not known yet
  3. Money for schools and services

    No payment or community agreement by xAI is in the records read.

    Not known yet
  4. Electricity bill

    MLGW and TVA supply this site, with 150 megawatts approved in 2024 and a further increment approved in 2026.

    Comes from the community
  5. Water

    MLGW supplies this site's water, and xAI is building a recycled water plant next door.

    Comes from the community
  6. Jobs

    No record read this pass states how many people work at this campus.

    Not known yet
  7. Next door: height, setbacks, noise

    County commissioners urged a public hearing before the turbine permit decision, citing the South Memphis site.

    Goes both ways
  8. Your say

    Residents had formal channels: a county-urged permit hearing and a city council vote on the tax ordinance.

    How to take part
Aerial view of xAI Colossus (Memphis) in Memphis, Shelby County, Tennessee, captured 2021
Aerial image, USDA National Agriculture Imagery Program, via the USGS National Map, Public domain (USDA NAIP), captured 2021Aerial images can be older than the campus. This one shows what was on the ground when it was taken.Source: USDA National Agriculture Imagery Program, via the USGS National MapLicense: Public domain (USDA NAIP)
Site-level positionPin placed from the position we have on file, inside Shelby County, Tennessee.See every project on the map

Timeline

  1. · FilingFiled with Anthropic; xAI for xAI Colossus (Memphis)
  2. · DecisionCity of Memphis: Ordinance providing for the allocation of lawfully available funds of the city, in an artificial intelligence property, to certain public purposes within those areas of the city affected by the development, use and operation of such property; approved on third and final reading, ...Ordinance No. 5953
  3. · FilingFiled with Memphis Light, Gas and Water for xAI Colossus (Memphis)
  4. · FilingFiled with Greater Memphis Chamber for xAI Colossus (Memphis)
  5. · FilingFiled with Shelby County Commission for xAI Colossus (Memphis)
  6. · DecisionTennessee Valley Authority: Approved 150 MW of firm power supply to the new MLGW end-use customer (CTC Property LLC, an xAI subsidiary), contingent on the customer's agreement to demand response terms for xAI Colossus (Memphis)Exhibit 11/07/24G
  7. · FilingFiled with Tennessee Valley Authority for xAI Colossus (Memphis)Exhibit 11/07/24G
  8. · FilingFiled with Greater Memphis Chamber for xAI Colossus (Memphis)
All 9 events for this project

Laws and bills that may apply here

Found by each bill's own place and size rules. Each one says who has checked it so far.

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Tennessee HB 1847: Bars utilities from absorbing data center electrical infrastructure costs

    On status, the bill was enacted as Public Chapter 961 and is in effect, which sets the May 7, 2026 date the act applies from; on the text, the act covers a building that primarily contains electronic equipment used to process, store, or transmit digital information and is projected to have a peak electric demand of fifty megawatts or more during the first three years of operation, and bars a municipality or electric utility from paying or absorbing its electrical infrastructure costs; this project is an operating data center in Memphis, Tennessee, with 300 MW of grid electric service requested on record, but no staged fact states its projected peak electric demand during its first three years of operation.

    “Is projected to have a peak electric demand of fifty megawatts (50 MW) or more during the first three (3) years of operation.” (SECTION 1, TCA 7-70-101(2)(A)(ii))

    Rule checks: Project is in Tennessee; 300 MW on record (grid connection), threshold 50 MW (SECTION 1, TCA 7-70-101(2)(A)(ii)). Still to check: dates: not checked, who it covers: not checked

Bills and laws in Tennessee

All 12 in Bill Watch

Who's involved

Power

Capacity, as announced or filed

  • 150 MW · Grid supply, first TVA approvalNov 2024 · grid connection
  • 300 MW · Grid supply requested from MLGW (two successive 150 MW increments)May 2025 · grid connection
  • 247.2 MW · Turbine fleetJul 2025 · generator_capacity

From the filings

Numbers stated in permits, agreements, and decisions, as printed. Each links to the filing.

  • Greater Memphis Chamber

    Stated in the filing
    Largest capital investment by a new-to-market company in Memphis history (Chamber characterization); described as multi-billion-dollar, no figure stated
    Stated in the filing
    Project stated as pending approval by the Memphis Shelby County Economic Development Growth Engine (EDGE), Tennessee Valley Authority, and governing authorities
  • Memphis Light, Gas and Water

    Stated in the filing
    13 million_gallons_per_day
    Stated in the filing
    Second 150 MW increment: studies complete and a second substation under construction at xAI expense; TVA Board decision then pending; MLGW projected delivery no later than December 2025
    Stated in the filing
    xAI pays the prevailing industrial rate and signed a curtailment agreement with TVA and MLGW for high-demand periods
    Stated in the filing
    300 MW
    Stated in the filing
    Pre-existing 16-inch gas main serves the site; xAI paid for an 8-inch tap
    Stated in the filing
    The former Electrolux plant on the site was built with a 2010 $97 million State of Tennessee grant and a $3.1 million state training grant, and carried a 15-year local property tax abatement of 75 percent
    Stated in the filing
    Connected to a pre-existing 20-inch water main on Paul Lowry Road; water billed at the prevailing commercial rate
    Stated in the filing
    150 MW delivered: 8 MW from the existing substation plus 142 MW from a new substation, both built or upgraded at xAI expense; TVA Board approved
  • City of Memphis, Ordinance No. 5953

    Stated in the filing
    Allocation of lawfully available funds of the city, in an artificial intelligence property, to certain public purposes within those areas of the city affected by the development, use and operation of such property
    Stated in the filing
    Approved on third and final reading, as amended, with 11 ayes printed (Carlisle, Cooper-Sutton, Easter-Thomas, Green, Smiley, Spinosa, Swearengen-Washington, Walker, Warren, White, Chairman Canale); Ford did not cast a vote; Logan absent; no nays printed
    Stated in the filing
    Walker amendment to item 20 approved with 12 ayes printed (Carlisle, Cooper-Sutton, Easter-Thomas, Ford, Green, Smiley, Spinosa, Swearengen-Washington, Walker, Warren, White, Chairman Canale); Logan absent
  • Anthropic; xAI

    Stated in the filing
    300 MW
    Stated in the filing
    220,000 GPUs
  • Greater Memphis Chamber

    Stated in the filing
    150 MW
    Stated in the filing
    150 MW
    Stated in the filing
    Temporary gas turbines being demobilized over the two months after May 1, 2025; about half to remain for Phase II until substation #22 (planned fall 2025), then a backup role
  • Tennessee Valley Authority, Exhibit 11/07/24G

    Stated in the filing
    Approval contingent on the customer's agreement to certain demand response terms offered for similar customer loads
    Stated in the filing
    50 MW
    Stated in the filing
    150 MW
    Stated in the filing
    2024-12-01
  • Shelby County Commission

    Stated in the filing
    CTC Property LLC applied for permits to operate 15 methane gas turbines 24 hours a day, 7 days a week, to power its operations long-term; application submitted January 2025
    Stated in the filing
    Resolution urges the Health Department to delay the permit approval process until a public hearing is held under the Tennessee Open Meetings Act, with public notice and an opportunity for public comment

Public records

10 records found so far. 6 kinds of record are still being collected.

See every record

Court cases and commission dockets

Questions people ask

Where is xAI Colossus (Memphis)?
xAI Colossus (Memphis) is a data center project in Memphis, Shelby County, Tennessee.
Who operates xAI Colossus (Memphis)?
xAI is named as the operator of xAI Colossus (Memphis).
How big is xAI Colossus (Memphis)?
xAI Colossus (Memphis) was announced at 300 MW of capacity.
What stage is xAI Colossus (Memphis)?
xAI Colossus (Memphis) is operating. It was first public in 2024.

Sources

Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.

  1. 1
    Velocity Meets Potency: xAI Announces Memphis as New Home (press release, June 5, 2024)
    Greater Memphis Chamber
    Tier 2 · Captured 2026-11-09 · Open the source
  2. 2
    2025 xAI Update (MLGW published briefing, May 2025)
    Memphis Light, Gas and Water
    Tier 1 · Captured 2026-11-09 · Open the source
  3. 3
    Minutes, Meeting of the City Council, City of Memphis, August 19, 2025
    City of Memphis
    Tier 1 · Captured 2026-11-09 · Open the source
  4. 4
    Higher limits and a new compute partnership with SpaceX (Anthropic news post, May 6, 2026)
    Anthropic
    Tier 2 · Captured 2026-11-09 · Open the source
  5. 5
    New Compute Partnership with Anthropic (xAI news post, May 6, 2026)
    xAI
    Tier 2 · Captured 2026-11-09 · Open the source
  6. 6
    xAI Phase One Substation #63 Providing 150MW of Power to Facility (press release, May 1, 2025)
    Greater Memphis Chamber
    Tier 2 · Captured 2026-11-09 · Open the source
  7. 7
    TVA Board Resolution and Memorandum, Exhibit 11/07/24G: Greater than 100 MW firm power arrangement with CTC Property LLC (xAI)
    Tennessee Valley Authority
    Tier 1 · Captured 2026-11-09 · Open the source
  8. 8
    Shelby County Commission resolution urging a public hearing before approval or denial of the permit submitted by CTC Property LLC (as amended in committee, March 25, 2025)
    Shelby County Commission
    Tier 1 · Captured 2026-11-09 · Open the source
  9. 9
    Memphis City Council regular agenda October 20 2026
    City of Memphis
    Tier 1 · Captured 2026-11-08 · Open the source
  10. 10
    Electric Service Schedule TDC, Time of Use Data Service (rate effective October 1, 2026)
    Memphis Light, Gas and Water Division, City of Memphis
    Tier 1 · Captured 2026-11-11 · Open the source · Archived copy
  11. 11
    xAI - Greater Memphis Chamber (project page: Pidgeon Industrial Park, 552 acres, live 2024-08-08, about 300 MW)
    Greater Memphis Chamber
    Tier 1 · Captured 2026-11-08 · Open the source
  12. 12
    xAI Colossus: the Memphis AI supercomputer explained (built from xAI, MLGW, and Chamber statements)
    The Model Press
    Tier 3 · Captured 2026-11-08 · Open the source
  13. 13
    TVA Board Resolution (Power Availability), February 11, 2026, Exhibit 02/11/26E
    Tennessee Valley Authority
    Tier 1 · Captured 2026-11-09 · Open the source
  14. 14
    Memphis City Council Regular Agenda, June 24, 2025 (council roster)
    City of Memphis
    Tier 1 · Captured 2026-11-09 · Open the source
  15. 15
    Greater than 100 MW firm power arrangement with CTC Property LLC (xAI), TVA Board of Directors presentation, November 7, 2024
    Tennessee Valley Authority
    Tier 1 · Captured 2026-11-08 · Open the source
  16. 16
    Construction Permit No. 01156-01PC, CTC Property LLC (Colossus Data Center), issued July 2, 2025
    Shelby County Health Department
    Tier 1 · Captured 2026-11-08 · Open the source

No corrections have been published for this page. Corrections log · Report an error or send a tip on this page