Project File
xAI Colossus (Memphis)
Memphis,Shelby County,TennesseeOperatingFirst public 2024Filing entity: CTC Property LLCLast checked Nov 9, 2026
xAIDeveloper and operatorSpaceXCompute providerMLGWElectric utilityAnthropicEnd user
Details confirmed
Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.
6 of 6 details confirmed
- Confirmed: County
- Confirmed: City or address
- Confirmed: Stage
- Confirmed: Capacity
- Confirmed: Electric utility
- Confirmed: First public date
What happens next: No upcoming date is on record.
Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.
Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.
xAI Colossus (Memphis) is an operating data center project in Memphis, Shelby County, Tennessee. xAI is named as operator. It was first public in 2024. It was announced at 300 MW.
xAI Colossus (Memphis) is an operating data center project in Memphis, Shelby County, Tennessee. xAI is named as operator. It was announced at 300 MW. All six of the core facts we track for every project are confirmed on this page.
Where this project sits
This project sits in Memphis, Shelby County, Tennessee. Each place page carries the projects tracked there, who provides its power and water, and its local rules.
xAI Colossus video · 2 min 5 sec
Newswire for xAI Colossus (Memphis)
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 28, 2026
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
For homeowners
What this project means if you live nearby
Each fact says which way it runs: comes to the community (such as tax paid), comes from the community (such as water or a tax break), or goes both ways. The labels show direction, not whether it is good or bad. How we work
- Property tax
This site pays full property taxes, and the city voted to steer part of that revenue to the surrounding area.
Comes to the community - Tax breaks
No tax break for xAI at this site appears in any record read this pass.
Not known yet - Money for schools and services
No payment or community agreement by xAI is in the records read.
Not known yet - Electricity bill
MLGW and TVA supply this site, with 150 megawatts approved in 2024 and a further increment approved in 2026.
Comes from the community - Water
MLGW supplies this site's water, and xAI is building a recycled water plant next door.
Comes from the community - Jobs
No record read this pass states how many people work at this campus.
Not known yet - Next door: height, setbacks, noise
County commissioners urged a public hearing before the turbine permit decision, citing the South Memphis site.
Goes both ways - Your say
Residents had formal channels: a county-urged permit hearing and a city council vote on the tax ordinance.
How to take part

Timeline
- · FilingFiled with Anthropic; xAI for xAI Colossus (Memphis)
- · DecisionCity of Memphis: Ordinance providing for the allocation of lawfully available funds of the city, in an artificial intelligence property, to certain public purposes within those areas of the city affected by the development, use and operation of such property; approved on third and final reading, ...Ordinance No. 5953
- · FilingFiled with Memphis Light, Gas and Water for xAI Colossus (Memphis)
- · FilingFiled with Greater Memphis Chamber for xAI Colossus (Memphis)
- · FilingFiled with Shelby County Commission for xAI Colossus (Memphis)
- · DecisionTennessee Valley Authority: Approved 150 MW of firm power supply to the new MLGW end-use customer (CTC Property LLC, an xAI subsidiary), contingent on the customer's agreement to demand response terms for xAI Colossus (Memphis)Exhibit 11/07/24G
- · FilingFiled with Tennessee Valley Authority for xAI Colossus (Memphis)Exhibit 11/07/24G
- · FilingFiled with Greater Memphis Chamber for xAI Colossus (Memphis)
Laws and bills that may apply here
Found by each bill's own place and size rules. Each one says who has checked it so far.
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Tennessee HB 1847: Bars utilities from absorbing data center electrical infrastructure costs
On status, the bill was enacted as Public Chapter 961 and is in effect, which sets the May 7, 2026 date the act applies from; on the text, the act covers a building that primarily contains electronic equipment used to process, store, or transmit digital information and is projected to have a peak electric demand of fifty megawatts or more during the first three years of operation, and bars a municipality or electric utility from paying or absorbing its electrical infrastructure costs; this project is an operating data center in Memphis, Tennessee, with 300 MW of grid electric service requested on record, but no staged fact states its projected peak electric demand during its first three years of operation.
“Is projected to have a peak electric demand of fifty megawatts (50 MW) or more during the first three (3) years of operation.” (SECTION 1, TCA 7-70-101(2)(A)(ii))
Rule checks: Project is in Tennessee; 300 MW on record (grid connection), threshold 50 MW (SECTION 1, TCA 7-70-101(2)(A)(ii)). Still to check: dates: not checked, who it covers: not checked
Bills and laws in Tennessee
- HB 2061 · Died or failedRequires data centers to register and report power and water use
- SB 1682 · Died or failedRequires data centers to register and report power and water use
- SB 2128 · Signed into law · May 18, 2026Bars utilities from absorbing data center electrical infrastructure costs
- HB 1847 · In effect · May 7, 2026Bars utilities from absorbing data center electrical infrastructure costs
- SB 1832 · Died or failed · Mar 10, 2026Requires computing facilities to devote half their output to public benefit
- SB 1999 · Died or failed · Mar 10, 2026Makes large data centers help fund grid upgrades through tariffs
Who's involved
Power
Capacity, as announced or filed
- 150 MW · Grid supply, first TVA approvalNov 2024 · grid connection
- 300 MW · Grid supply requested from MLGW (two successive 150 MW increments)May 2025 · grid connection
- 247.2 MW · Turbine fleetJul 2025 · generator_capacity
From the filings
Numbers stated in permits, agreements, and decisions, as printed. Each links to the filing.
Greater Memphis Chamber
- Stated in the filing
- Largest capital investment by a new-to-market company in Memphis history (Chamber characterization); described as multi-billion-dollar, no figure stated
- Stated in the filing
- Project stated as pending approval by the Memphis Shelby County Economic Development Growth Engine (EDGE), Tennessee Valley Authority, and governing authorities
Memphis Light, Gas and Water
- Stated in the filing
- 13 million_gallons_per_day
- Stated in the filing
- Second 150 MW increment: studies complete and a second substation under construction at xAI expense; TVA Board decision then pending; MLGW projected delivery no later than December 2025
- Stated in the filing
- xAI pays the prevailing industrial rate and signed a curtailment agreement with TVA and MLGW for high-demand periods
- Stated in the filing
- 300 MW
- Stated in the filing
- Pre-existing 16-inch gas main serves the site; xAI paid for an 8-inch tap
- Stated in the filing
- The former Electrolux plant on the site was built with a 2010 $97 million State of Tennessee grant and a $3.1 million state training grant, and carried a 15-year local property tax abatement of 75 percent
- Stated in the filing
- Connected to a pre-existing 20-inch water main on Paul Lowry Road; water billed at the prevailing commercial rate
- Stated in the filing
- 150 MW delivered: 8 MW from the existing substation plus 142 MW from a new substation, both built or upgraded at xAI expense; TVA Board approved
City of Memphis, Ordinance No. 5953
- Stated in the filing
- Allocation of lawfully available funds of the city, in an artificial intelligence property, to certain public purposes within those areas of the city affected by the development, use and operation of such property
- Stated in the filing
- Approved on third and final reading, as amended, with 11 ayes printed (Carlisle, Cooper-Sutton, Easter-Thomas, Green, Smiley, Spinosa, Swearengen-Washington, Walker, Warren, White, Chairman Canale); Ford did not cast a vote; Logan absent; no nays printed
- Stated in the filing
- Walker amendment to item 20 approved with 12 ayes printed (Carlisle, Cooper-Sutton, Easter-Thomas, Ford, Green, Smiley, Spinosa, Swearengen-Washington, Walker, Warren, White, Chairman Canale); Logan absent
Anthropic; xAI
- Stated in the filing
- 300 MW
- Stated in the filing
- 220,000 GPUs
Greater Memphis Chamber
- Stated in the filing
- 150 MW
- Stated in the filing
- 150 MW
- Stated in the filing
- Temporary gas turbines being demobilized over the two months after May 1, 2025; about half to remain for Phase II until substation #22 (planned fall 2025), then a backup role
Tennessee Valley Authority, Exhibit 11/07/24G
- Stated in the filing
- Approval contingent on the customer's agreement to certain demand response terms offered for similar customer loads
- Stated in the filing
- 50 MW
- Stated in the filing
- 150 MW
- Stated in the filing
- 2024-12-01
Shelby County Commission
- Stated in the filing
- CTC Property LLC applied for permits to operate 15 methane gas turbines 24 hours a day, 7 days a week, to power its operations long-term; application submitted January 2025
- Stated in the filing
- Resolution urges the Health Department to delay the permit approval process until a public hearing is held under the Tennessee Open Meetings Act, with public notice and an opportunity for public comment
Public records
10 records found so far. 6 kinds of record are still being collected.
See every recordCourt cases and commission dockets
- Utility commission · In effect · Oct 1, 2026Electric Service Schedule TDC, Time of Use Data Service
Questions people ask
- Where is xAI Colossus (Memphis)?
- xAI Colossus (Memphis) is a data center project in Memphis, Shelby County, Tennessee.
- Who operates xAI Colossus (Memphis)?
- xAI is named as the operator of xAI Colossus (Memphis).
- How big is xAI Colossus (Memphis)?
- xAI Colossus (Memphis) was announced at 300 MW of capacity.
- What stage is xAI Colossus (Memphis)?
- xAI Colossus (Memphis) is operating. It was first public in 2024.
Sources
Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.
- 1Velocity Meets Potency: xAI Announces Memphis as New Home (press release, June 5, 2024)
Greater Memphis ChamberTier 2 · Captured 2026-11-09 · Open the source - 22025 xAI Update (MLGW published briefing, May 2025)
Memphis Light, Gas and WaterTier 1 · Captured 2026-11-09 · Open the source - 3Minutes, Meeting of the City Council, City of Memphis, August 19, 2025
City of MemphisTier 1 · Captured 2026-11-09 · Open the source - 4Higher limits and a new compute partnership with SpaceX (Anthropic news post, May 6, 2026)
AnthropicTier 2 · Captured 2026-11-09 · Open the source - 5New Compute Partnership with Anthropic (xAI news post, May 6, 2026)
xAITier 2 · Captured 2026-11-09 · Open the source - 6xAI Phase One Substation #63 Providing 150MW of Power to Facility (press release, May 1, 2025)
Greater Memphis ChamberTier 2 · Captured 2026-11-09 · Open the source - 7TVA Board Resolution and Memorandum, Exhibit 11/07/24G: Greater than 100 MW firm power arrangement with CTC Property LLC (xAI)
Tennessee Valley AuthorityTier 1 · Captured 2026-11-09 · Open the source - 8Shelby County Commission resolution urging a public hearing before approval or denial of the permit submitted by CTC Property LLC (as amended in committee, March 25, 2025)
Shelby County CommissionTier 1 · Captured 2026-11-09 · Open the source - 9Memphis City Council regular agenda October 20 2026
City of MemphisTier 1 · Captured 2026-11-08 · Open the source - 10Electric Service Schedule TDC, Time of Use Data Service (rate effective October 1, 2026)
Memphis Light, Gas and Water Division, City of MemphisTier 1 · Captured 2026-11-11 · Open the source · Archived copy - 11xAI - Greater Memphis Chamber (project page: Pidgeon Industrial Park, 552 acres, live 2024-08-08, about 300 MW)
Greater Memphis ChamberTier 1 · Captured 2026-11-08 · Open the source - 12xAI Colossus: the Memphis AI supercomputer explained (built from xAI, MLGW, and Chamber statements)
The Model PressTier 3 · Captured 2026-11-08 · Open the source - 13TVA Board Resolution (Power Availability), February 11, 2026, Exhibit 02/11/26E
Tennessee Valley AuthorityTier 1 · Captured 2026-11-09 · Open the source - 14Memphis City Council Regular Agenda, June 24, 2025 (council roster)
City of MemphisTier 1 · Captured 2026-11-09 · Open the source - 15Greater than 100 MW firm power arrangement with CTC Property LLC (xAI), TVA Board of Directors presentation, November 7, 2024
Tennessee Valley AuthorityTier 1 · Captured 2026-11-08 · Open the source - 16Construction Permit No. 01156-01PC, CTC Property LLC (Colossus Data Center), issued July 2, 2025
Shelby County Health DepartmentTier 1 · Captured 2026-11-08 · Open the source
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page