Skip to content

Project File

GRIID Maynardville (CleanSpark)

Maynardville,Union County,TennesseeOperatingFirst public 2024Filing entity: GRIID Infrastructure Inc.Last checked Nov 8, 2026

GRIIDDeveloper and operatorCleanSparkOperator

Saved in this browser; see it under My feed. Email alerts are not available yet.

Details confirmed

Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.

4 of 6 details confirmed

  • Confirmed: County
  • Confirmed: City or address
  • Confirmed: Stage
  • Confirmed: First public date
  • Still to confirm: Capacity
  • Still to confirm: Electric utility
Know the record? Send it to us

What happens next: No upcoming date is on record.

Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.

Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.

GRIID Maynardville (CleanSpark) is an operating data center project in Maynardville, Union County, Tennessee. GRIID is named as operator. It was first public in 2024. No site capacity figure is published for this project.

GRIID Maynardville (CleanSpark) is an operating data center project in Maynardville, Union County, Tennessee. GRIID is named as operator. No site capacity figure is published for this project. 4 of the six core facts we track for every project are confirmed on this page.

Where this project sits

This project sits in Maynardville, Union County, Tennessee. Each place page carries the projects tracked there, who provides its power and water, and its local rules.

0Public records we have found

For homeowners

What this project means if you live nearby

We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.

Latest from the newswire

  1. What the record shows · November 28, 2026

    Loudoun County data centers: the complete record

  2. What the record shows · November 22, 2026

    SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days

  3. What the record shows · November 22, 2026

    PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

County outline onlyExact site not confirmed yet. The outline shows Union County, Tennessee.See every project on the map

Timeline

  1. · New projectFirst public record of GRIID Maynardville (CleanSpark)Operating

Laws and bills that may apply here

Found by each bill's own place and size rules. Each one says who has checked it so far.

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Tennessee HB 1847: Bars utilities from absorbing data center electrical infrastructure costs

    The act covers data centers projected to have a peak electric demand of fifty megawatts or more during the first three years of operation, whose electrical infrastructure costs a municipality or electric utility may not pay or absorb, for conduct and contracts on or after May 7, 2026; this project has no capacity figure on record, but the project's projected peak electric demand during its first three years of operation is not on record.

    “Is projected to have a peak electric demand of fifty megawatts (50 MW) or more during the first three (3) years of operation.” (SECTION 1, TCA 7-70-101(2)(A)(ii))

    Rule checks: Project is in Tennessee. Still to check: size: unknown, dates: not checked, who it covers: not checked

Bills and laws in Tennessee

All 12 in Bill Watch

Who's involved

Public records

0 records found so far. 9 kinds of record are still being collected.

    See every record

    Questions people ask

    Where is GRIID Maynardville (CleanSpark)?
    GRIID Maynardville (CleanSpark) is a data center project in Maynardville, Union County, Tennessee.
    Who operates GRIID Maynardville (CleanSpark)?
    GRIID is named as the operator of GRIID Maynardville (CleanSpark).
    What stage is GRIID Maynardville (CleanSpark)?
    GRIID Maynardville (CleanSpark) is operating. It was first public in 2024.

    Sources

    Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.

    1. 1
      CleanSpark Announces Agreement to Acquire GRIID Infrastructure and Expansion Plans of over 400 MW in Tennessee
      CleanSpark, Inc. and GRIID Infrastructure Inc.
      Tier 4 · Captured 2026-11-08 · Open the source

    No corrections have been published for this page. Corrections log · Report an error or send a tip on this page