city Card
Data centers in Chattanooga, Tennessee
Draft research: figures were traced to their sources by an AI research agent and have not passed verification yet.
Data Center Fact Check tracks 1 data center project in Chattanooga, Tennessee as of November 2026, totaling about 1 MW announced where a figure is published.
Chattanooga has 1 tracked data center project. Their announced capacity totals about 1 MW where a figure is published. The project here is DC BLOX Chattanooga (CHA1), operating. Every project we track here is listed below, with the public records behind it. Every figure comes from the public record linked on this page.
Data center projects in Chattanooga
- DC BLOX Chattanooga (CHA1)
OperatingChattanooga1 MW announced
Who serves this place
- Not collected yet.
Court cases and commission dockets in Tennessee (3)
Bills and laws in Tennessee
- HB 2061 · Died or failedRequires data centers to register and report power and water use
- SB 1682 · Died or failedRequires data centers to register and report power and water use
- SB 2128 · Signed into law · May 18, 2026Bars utilities from absorbing data center electrical infrastructure costs
- HB 1847 · In effect · May 7, 2026Bars utilities from absorbing data center electrical infrastructure costs
- SB 1832 · Died or failed · Mar 10, 2026Requires computing facilities to devote half their output to public benefit
- SB 1999 · Died or failed · Mar 10, 2026Makes large data centers help fund grid upgrades through tariffs
- SB 2584 · Died or failed · Mar 10, 2026Lets qualified data centers certify compliance for job tax credits
- HB 1461 · Died or failed · Mar 4, 2026Requires computing facilities to devote half their output to public benefit
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
Questions people ask
- How many data centers are in Chattanooga?
- Data Center Fact Check tracks 1 data center project in Chattanooga as of November 2026.
- What is the biggest data center in Chattanooga?
- By announced capacity, the biggest data center in Chattanooga is DC BLOX Chattanooga (CHA1), announced at 1 MW. It is operating.
- How much power do data centers in Chattanooga use?
- The 1 projects tracked in Chattanooga have announced about 1 MW of capacity in total, where a figure is published. That is announced capacity, not measured electricity use.
Sources
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "Chattanooga." Accessed 2026-11-29. https://datacenterfactcheck.org/places/us-tn-chattanooga
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page