How many homes use as much electricity as a data center?

Short answer: about 62,600 average U.S. homes for every 100 MW running at a typical 75 percent. The real number depends on the site and its neighbors.

Read: Your tornado warning starts in two data centers: Manassas, Virginia and Phoenix, Arizona

Pick data centers we track, or enter your own numbers. We compare with homes served by the same utility when we have that data, and show how precise the estimate is.

The address holds your inputs, so a link shows the same calculation.

Start from

Your data centers

Pick as many as you like. The one marked main drives the big result.

  • xAI Colossus (Memphis)Shelby County, Tennessee

xAI Colossus (Memphis): Operating. Announced capacity 300 MWMemphis Light, Gas and Water sells no power to homes in federal data, so homes use the state average.

Fine-tune every input
How hard it runs, percent of capacity (low, likely, high)
Overhead multiplier, used only for computer-equipment figures

About as much electricity in a year as

105,800 to 148,400 homes

Most likely about 139,100 homes in Tennessee, for xAI Colossus (Memphis) at 300 MW.

Yearly electricity: about 1,971 GWh (range 1,498 to 2,102 GWh).

Precision: Fair2 of 4

  • Capacity: From our records, with a source.
  • Local homes: State average. Utility data would be sharper.
  • What kind of facility: Facility type and what the MW figure measures narrow the range.
  • Measured use: The operator's own reported yearly electricity for this site would replace our estimate. None in our records yet.

Estimated range. Not a forecast, and not a bill.

Your data centers, side by side

Sites with the operator's reported use show that measured figure; the others use the same settings as above. Each is compared with the most local homes we have for that site. Where we have neither, enter a capacity to include it.

Selected data centers compared
Data centerCapacityHomes (likely)Yearly GWhCompared with
xAI Colossus (Memphis)Main300 MW139,1001,971Tennessee
Together139,1001,971Each site against its own local homes.

How it works

  1. Total facility power: if the number covers computer equipment only, multiply by the overhead multiplier. 300 MW × 1 = 300 MW (likely)
  2. Yearly electricity: facility power times 8,760 hours times how hard it runs. 300 MW × 8,760 h × 75% = 1,971,000 MWh
  3. Homes: that total divided by what one home uses in a year. 1,971,000 MWh ÷ 14.165 MWh = 139,146 homes (shown rounded)

This does not capture ramp-up over years, peak demand at the hottest hour, or anything about bills.

Sources

  1. 1
    Form EIA-861 final 2025 detailed data files
    U.S. Energy Information Administration
    Tier 1 · Open the source
  2. 2
    EIA Form 861 2025, Sales to Ultimate Customers file
    U.S. Energy Information Administration
    Tier 1 · Open the source
  3. 3
    Greater than 100 MW firm power arrangement with CTC Property LLC (xAI), TVA Board of Directors presentation, November 7, 2024
    Tennessee Valley Authority
    Tier 1 · Open the source
  4. 4
    2025 xAI Update (MLGW published briefing, May 2025)
    Memphis Light, Gas and Water
    Tier 1 · Open the source
  5. 5
    Construction Permit No. 01156-01PC, CTC Property LLC (Colossus Data Center), issued July 2, 2025
    Shelby County Health Department
    Tier 1 · Open the source
  6. 6
    xAI - Greater Memphis Chamber (project page: Pidgeon Industrial Park, 552 acres, live 2024-08-08, about 300 MW)
    Greater Memphis Chamber
    Tier 1 · Open the source
  7. 7
    xAI Colossus: the Memphis AI supercomputer explained (built from xAI, MLGW, and Chamber statements)
    The Model Press
    Tier 3 · Open the source
  8. 8
    Velocity Meets Potency: xAI Announces Memphis as New Home (press release, June 5, 2024)
    Greater Memphis Chamber
    Tier 2 · Open the source
  9. 9
    xAI Phase One Substation #63 Providing 150MW of Power to Facility (press release, May 1, 2025)
    Greater Memphis Chamber
    Tier 2 · Open the source
  10. 10
    TVA Board Resolution and Memorandum, Exhibit 11/07/24G: Greater than 100 MW firm power arrangement with CTC Property LLC (xAI)
    Tennessee Valley Authority
    Tier 1 · Open the source
  11. 11
    TVA Board Resolution (Power Availability), February 11, 2026, Exhibit 02/11/26E
    Tennessee Valley Authority
    Tier 1 · Open the source
  12. 12
    Minutes, Meeting of the City Council, City of Memphis, August 19, 2025
    City of Memphis
    Tier 1 · Open the source
  13. 13
    Memphis City Council Regular Agenda, June 24, 2025 (council roster)
    City of Memphis
    Tier 1 · Open the source
  14. 14
    Shelby County Commission resolution urging a public hearing before approval or denial of the permit submitted by CTC Property LLC (as amended in committee, March 25, 2025)
    Shelby County Commission
    Tier 1 · Open the source
  15. 15
    Higher limits and a new compute partnership with SpaceX (Anthropic news post, May 6, 2026)
    Anthropic
    Tier 2 · Open the source
  16. 16
    New Compute Partnership with Anthropic (xAI news post, May 6, 2026)
    xAI
    Tier 2 · Open the source
  17. 17
    Annual and Peak Electricity Use: History and Future Projections (Powering Intelligence 2026)
    EPRI
    Tier 2 · Open the source
  18. 18
    Uptime Institute Global Data Center Survey 2024: regional view (UII Data Report 154)
    Uptime Institute
    Tier 2 · Open the source

Questions people ask

How many homes use as much electricity as a data center?
About 62,600 average U.S. homes for every 100 MW running at a typical 75 percent. The real number depends on the site and its neighbors.
How many homes does 1 MW of data center power equal?
About 630 average U.S. homes for each megawatt, if the site runs at 75 percent of its capacity all year and a home uses 10,491 kWh a year (2025). Pick a site to compare with homes on its own utility.
Is a data center's MW figure what it actually uses?
No. Announced capacity is the most a site can draw, and many sites ramp up over years. Where an operator reports its yearly electricity use, this calculator uses that measured figure instead.
Why does the answer change by utility?
Homes use different amounts of electricity in different places, mostly because of climate and heating. Comparing with homes on the same utility, then the same state, gives the most local answer we have data for.