Project File

xAI Colossus 2 (Memphis, Whitehaven)

Memphis,Shelby County,TennesseeOperatingFirst public 2025Filing entity: MZX Tech LLCLast checked Nov 10, 2026

xAIDeveloper and operatorMLGWElectric utility

Saved in this browser; see it under My feed. Email alerts are not available yet.

Details confirmed

Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.

6 of 6 details confirmed

  • Confirmed: County
  • Confirmed: City or address
  • Confirmed: Stage
  • Confirmed: Capacity
  • Confirmed: Electric utility
  • Confirmed: First public date
Know the record? Send it to us

What happens next: No upcoming date is on record.

Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.

Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.

xAI Colossus 2 (Memphis, Whitehaven) is an operating data center project in Memphis, Shelby County, Tennessee. xAI is named as operator. It was first public in 2025. It was announced at 430 MW.

xAI Colossus 2 (Memphis, Whitehaven) is an operating data center project in Memphis, Shelby County, Tennessee. xAI is named as operator. It was announced at 430 MW. All six of the core facts we track for every project are confirmed on this page.

Where this project sits

This project sits in Memphis, Shelby County, Tennessee. Each place page carries the projects tracked there, who provides its power and water, and its local rules.

xAI Colossus 2 video · 2 min 19 sec

Newswire for xAI Colossus 2 (Memphis, Whitehaven)

  1. What the record shows · November 22, 2026

    SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days

  2. What the record shows · November 28, 2026

    Loudoun County data centers: the complete record

  3. What the record shows · November 22, 2026

    PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

430 MWAnnounced capacity
7Public records we have found
8Backup generators, ProEnergy 6000PE turbines at 50 MW each
1,240.16Generator capacity, MW

For homeowners

What this project means if you live nearby

Each fact says which way it runs: comes to the community (such as tax paid), comes from the community (such as water or a tax break), or goes both ways. The labels show direction, not whether it is good or bad. How we work

  1. Property tax

    This campus is privately owned, and no tax break for it was found; its tax bills are not published.

    Not known yet
  2. Tax breaks

    No tax break or incentive agreement for this campus appears in any record read this pass.

    Not known yet
  3. Money for schools and services

    No community payment or benefit agreement by xAI for this campus is in the records read.

    Not known yet
  4. Electricity bill

    MLGW gives this campus only a small general-services supply; its main power is generated at a linked plant across the state line.

    Comes from the community
  5. Water

    MLGW supplies this campus through a pre-existing 8-inch water main, and the utility records no request for more.

    Comes from the community
  6. Jobs

    No record read this pass states a jobs or investment figure for this campus alone.

    Not known yet
  7. Next door: height, setbacks, noise

    The contested record for this campus sits across the state line, where its power plant drew a public hearing and a federal lawsuit.

    Goes both ways
  8. Your say

    Residents had formal channels on the linked plant's permit: a public comment period and a noticed public hearing in Mississippi.

    How to take part
Aerial view of xAI Colossus 2 (Memphis, Whitehaven) in Memphis, Shelby County, Tennessee, captured 2021
Aerial image, USDA National Agriculture Imagery Program, via the USGS National Map, Public domain (USDA NAIP), captured 2021Aerial images can be older than the campus. This one shows what was on the ground when it was taken.Source: USDA National Agriculture Imagery Program, via the USGS National MapLicense: Public domain (USDA NAIP)
Site-level positionPin placed from the position we have on file, inside Shelby County, Tennessee.See every project on the map

The land, to scale

One football field
186.13 acres, about 141 football fields. Drawn as a square for scale; the real shape is not known.

Timeline

  1. · DecisionMississippi Department of Environmental Quality (Mississippi Environmental Quality Permit Board): Issued (air permit) for xAI Colossus 2 (Memphis, Whitehaven)PSD Permit to Construct No. 0680-00119 (Agency Interest No. 12592, PER20250001)
  2. · FilingFiled with Mississippi Department of Environmental Quality (Mississippi Environmental Quality Permit Board): air permit for xAI Colossus 2 (Memphis, Whitehaven)PSD Permit to Construct No. 0680-00119 (Agency Interest No. 12592, PER20250001)
  3. · FilingFiled with Memphis Light, Gas and Water for xAI Colossus 2 (Memphis, Whitehaven)
  4. · FilingFiled with Memphis Light, Gas and Water for xAI Colossus 2 (Memphis, Whitehaven)
  5. · New projectFirst public record of xAI Colossus 2 (Memphis, Whitehaven)Operating
  6. · FilingFiled with Greater Memphis Chamber for xAI Colossus 2 (Memphis, Whitehaven)

Laws and bills that may apply here

Found by each bill's own place and size rules. Each one says who has checked it so far.

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Tennessee HB 1847: Bars utilities from absorbing data center electrical infrastructure costs

    On status, the bill was enacted as Public Chapter 961 and is in effect, which sets the May 7, 2026 date the act applies from; on the text, the act covers a building that primarily contains electronic equipment used to process, store, or transmit digital information and is projected to have a peak electric demand of fifty megawatts or more during the first three years of operation, and bars a municipality or electric utility from paying or absorbing its electrical infrastructure costs; this project is an operating data center in Memphis, Tennessee, with 430 MW of it load on record in two clusters brought online, but no staged fact states its projected peak electric demand during its first three years of operation.

    “Is projected to have a peak electric demand of fifty megawatts (50 MW) or more during the first three (3) years of operation.” (SECTION 1, TCA 7-70-101(2)(A)(ii))

    Rule checks: Project is in Tennessee; 430 MW on record (announced), threshold 50 MW (SECTION 1, TCA 7-70-101(2)(A)(ii)). Still to check: dates: not checked, who it covers: not checked

Bills and laws in Tennessee

All 12 in Bill Watch

Who's involved

  • Developer and operatorxAI
  • Electric utilityMLGW

Power

Capacity, as announced or filed

  • 1,240.16 MW · Permanent power plant, Southaven MS (41 turbines)Mar 2026 · generator_capacity
  • 220 MW · Second cluster (110,000 GB300 processors)Jun 2026 · it_load
  • 210 MW · First cluster (about 110,000 GB200 processors)Jun 2026 · it_load

From the filings

Numbers stated in permits, agreements, and decisions, as printed. Each links to the filing.

  • Memphis Light, Gas and Water

    Stated in the filing
    5420 Tulane Road, Memphis, TN
    Stated in the filing
    0.5 MW
  • Memphis Light, Gas and Water

    Stated in the filing
    8 inches
    Stated in the filing
    Small gas line in place for domestic use only, as of the May 2025 update; MLGW studying what is needed to provide additional gas capacity
    Stated in the filing
    No final request for electric service submitted, and MLGW not conducting a system impact study, as of the May 2025 update
  • Mississippi Department of Environmental Quality (Mississippi Environmental Quality Permit Board), PSD Permit to Construct No. 0680-00119 (Agency Interest No. 12592, PER20250001)

    Backup generators
    8 ProEnergy 6000PE turbines at 50 MW each
    Stated in the filing
    Tesla battery packs provide backup power
    Backup generators
    41 simple-cycle natural gas turbines
    Generator capacity
    1,240.16 MW
    Stated in the filing
    Behind-the-meter generation: electricity for the source's own use, no grid export
    Backup generators
    17 Solar Titan PGM-130 turbines at 16.48 MW each
    Backup generators
    16 Solar Titan 350 turbines at 35 MW each

Public records

7 records found so far. 5 kinds of record are still being collected.

See every record

Court cases and commission dockets

Questions people ask

Where is xAI Colossus 2 (Memphis, Whitehaven)?
xAI Colossus 2 (Memphis, Whitehaven) is a data center project in Memphis, Shelby County, Tennessee.
Who operates xAI Colossus 2 (Memphis, Whitehaven)?
xAI is named as the operator of xAI Colossus 2 (Memphis, Whitehaven).
How big is xAI Colossus 2 (Memphis, Whitehaven)?
xAI Colossus 2 (Memphis, Whitehaven) was announced at 430 MW of capacity. The site covers 186.13 acres.
What stage is xAI Colossus 2 (Memphis, Whitehaven)?
xAI Colossus 2 (Memphis, Whitehaven) is operating. It was first public in 2025.

Sources

Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.

  1. 1
    MLGW Statement on xAI (July 22, 2025)
    Memphis Light, Gas and Water
    Tier 1 · Captured 2026-11-09 · Open the source
  2. 2
    xAI Memphis Announces Expansion Of Supercomputer with Addition Of Tech Companies In Digital Delta
    Greater Memphis Chamber
    Tier 1 · Captured 2026-11-09 · Open the source
  3. 3
    2025 xAI Update (MLGW published briefing, May 2025)
    Memphis Light, Gas and Water
    Tier 1 · Captured 2026-11-09 · Open the source
  4. 4
    Air Pollution Control Permit and Prevention of Significant Deterioration (PSD) Authority to Construct Air Emissions Equipment, Permit No. 0680-00119, MZX Tech LLC, issued March 11, 2026
    Mississippi Department of Environmental Quality
    Tier 1 · Captured 2026-11-08 · Open the source
  5. 5
    Response to Comments and Preliminary Determination, MZX Tech LLC, PSD Permit to Construct No. 0680-00119 (complete packet)
    Mississippi Department of Environmental Quality
    Tier 1 · Captured 2026-11-09 · Open the source
  6. 6
    enSearch Online facility record, Agency Interest No. 12592 (MZX Tech LLC)
    Mississippi Department of Environmental Quality
    Tier 1 · Captured 2026-11-09 · Open the source
  7. 7
    Memphis City Council regular agenda October 20 2026
    City of Memphis
    Tier 1 · Captured 2026-11-08 · Open the source
  8. 8
    Electric Service Schedule TDC, Time of Use Data Service (rate effective October 1, 2026)
    Memphis Light, Gas and Water Division, City of Memphis
    Tier 1 · Captured 2026-11-11 · Open the source · Archived copy
  9. 9
    Minutes, Meeting of the City Council, City of Memphis, August 19, 2025
    City of Memphis
    Tier 1 · Captured 2026-11-09 · Open the source
  10. 10
    What to know: Ted Townsend resigns as CEO from Greater Memphis Chamber (recaps the June 2024 xAI announcement and Colossus 2 operating in Whitehaven)
    Memphis Commercial Appeal
    Tier 3 · Captured 2026-11-08 · Open the source
  11. 11
    How big is xAI's presence in Memphis area? A guide to its 3 campuses
    Memphis Commercial Appeal
    Tier 3 · Captured 2026-11-09 · Open the source
  12. 12
    Form 424B4 final prospectus (SpaceX, filed June 12, 2026)
    Space Exploration Technologies Corp, filed with the U.S. Securities and Exchange Commission
    Tier 1 · Captured 2026-11-19 · Open the source