Skip to content

Project File · Public records

Every public record we have for xAI Colossus 2 (Memphis, Whitehaven)

Memphis, Shelby County, TennesseeOperatingFirst public 2025Filing entity: MZX Tech LLCLast checked Nov 10, 2026

Download CSV

Records marked draft were traced to their source by an AI research agent and have not passed verification yet.

What the public record holds

1 of 7 records · showing power and utility only ·

No date in the record(rules in force and undated records)

  • Utility proceedingIn effectNo date in the recordMemphis Light, Gas and Water Division, City of Memphis

    Electric Service Schedule TDC, Time of Use Data Service

    Retail data service schedule carrying TVA’s wholesale structure, effective October 1, 2026. It applies to firm power where the major use is NAICS subsector 518 or 519 (excluding 519210), NAICS 522320 or 541214, or, in TVA’s sole judgment, the operation of computational equipment; the customer must certify eligibility to both MLGW and TVA, and TVA has unrestricted remote and physical access to metering. Classes are set by the higher of on-peak or off-peak contract demand: TDCA over 1,000 to 5,000 kW, TDCB over 5,000 to 15,000 kW, TDCC over 15,000 to 25,000 kW, TDCD over 25,000 kW. Monthly charges include a $2,000 service charge per delivery point and a $350 TVA administrative charge; summer on-peak demand at transmission voltage is $14.13 to $14.16 per kW by class. Billing demand floors run from 30 percent of the first 5,000 kW to 85 percent of demand above 350,000 kW, on the higher of contract demand or the prior 12 months’ maximum. No facilities rental charge at 161 kV or above; $0.38 per kW-month below 161 kV and $0.97 (first 10,000 kW) and $0.76 (excess) below 46 kV. Reactive charges are $1.81 per kVAR lagging excess and $1.42 per kVAR leading. Contracts: TDCA at least 1 year, TDCB to TDCD at least 5 years for the initial term and each renewal. Rates are subject to TVA’s monthly Fuel Cost and Purchased Power Adjustment Rider.

    Draft research, not yet verifiedLast checked Nov 11, 2026
    Where it says this

    Schedule TDC (4 pages): Availability and Customers Class Description (page 1: NAICS classes, certification, TDCA to TDCD bands); Determination of On-Peak and Off-Peak Demands (page 2: the 30 to 85 percent billing demand floors); Facilities Rental and Reactive Demand Charges (page 2); Contract Requirement (page 3: 1-year and 5-year terms); rate tables (pages 3-4: service and administrative charges, demand and energy charges)

Records we are still collecting

These records are normally public. We have not collected them for this project yet; each will appear above with its source when found.

  • Building and site permits

    Building permits, site plans, grading, certificates of occupancy. Usually held by: City or county building department.

  • Water supply and use

    Water service agreements, water rights, use reports. Usually held by: Water utility and state water agency.

  • Tax breaks and payments

    Abatements, enterprise zones, payments in lieu of taxes, fees. Usually held by: County, city, or development authority.

  • Courts and disputes

    Lawsuits, appeals, settlements. Usually held by: State and federal courts.

  • Company filings

    Business registrations of filing entities, securities filings. Usually held by: Secretary of state business registry; SEC.

Sources

  1. 1
    MLGW Statement on xAI (July 22, 2025)
    Memphis Light, Gas and Water
    Tier 1 · Captured 2026-11-09 · Open the source
  2. 2
    xAI Memphis Announces Expansion Of Supercomputer with Addition Of Tech Companies In Digital Delta
    Greater Memphis Chamber
    Tier 1 · Captured 2026-11-09 · Open the source
  3. 3
    2025 xAI Update (MLGW published briefing, May 2025)
    Memphis Light, Gas and Water
    Tier 1 · Captured 2026-11-09 · Open the source
  4. 4
    Air Pollution Control Permit and Prevention of Significant Deterioration (PSD) Authority to Construct Air Emissions Equipment, Permit No. 0680-00119, MZX Tech LLC, issued March 11, 2026
    Mississippi Department of Environmental Quality
    Tier 1 · Captured 2026-11-08 · Open the source
  5. 5
    Response to Comments and Preliminary Determination, MZX Tech LLC, PSD Permit to Construct No. 0680-00119 (complete packet)
    Mississippi Department of Environmental Quality
    Tier 1 · Captured 2026-11-09 · Open the source
  6. 6
    enSearch Online facility record, Agency Interest No. 12592 (MZX Tech LLC)
    Mississippi Department of Environmental Quality
    Tier 1 · Captured 2026-11-09 · Open the source
  7. 7
    Memphis City Council regular agenda October 20 2026
    City of Memphis
    Tier 1 · Captured 2026-11-08 · Open the source
  8. 8
    Electric Service Schedule TDC, Time of Use Data Service (rate effective October 1, 2026)
    Memphis Light, Gas and Water Division, City of Memphis
    Tier 1 · Captured 2026-11-11 · Open the source · Archived copy
  9. 9
    Minutes, Meeting of the City Council, City of Memphis, August 19, 2025
    City of Memphis
    Tier 1 · Captured 2026-11-09 · Open the source
  10. 10
    What to know: Ted Townsend resigns as CEO from Greater Memphis Chamber (recaps the June 2024 xAI announcement and Colossus 2 operating in Whitehaven)
    Memphis Commercial Appeal
    Tier 3 · Captured 2026-11-08 · Open the source
  11. 11
    How big is xAI's presence in Memphis area? A guide to its 3 campuses
    Memphis Commercial Appeal
    Tier 3 · Captured 2026-11-09 · Open the source
  12. 12
    Form 424B4 final prospectus (SpaceX, filed June 12, 2026)
    Space Exploration Technologies Corp, filed with the U.S. Securities and Exchange Commission
    Tier 1 · Captured 2026-11-19 · Open the source

No corrections have been published for this page. Corrections log · Report an error or send a tip on this page