Skip to content

Project File

Expedient Memphis

Memphis,Shelby County,TennesseeOperatingLast checked Nov 10, 2026

ExpedientOperator

Saved in this browser; see it under My feed. Email alerts are not available yet.

Details confirmed

Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.

5 of 6 details confirmed

  • Confirmed: County
  • Confirmed: City or address
  • Confirmed: Stage
  • Confirmed: Capacity
  • Confirmed: Electric utility
  • Still to confirm: First public date
Know the record? Send it to us

What happens next: No upcoming date is on record.

Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.

Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.

Expedient Memphis is an operating data center project in Memphis, Shelby County, Tennessee. Expedient is named as operator. It was announced at 1.5 MW.

Expedient Memphis is an operating data center project in Memphis, Shelby County, Tennessee. Expedient is named as operator. It was announced at 1.5 MW. 5 of the six core facts we track for every project are confirmed on this page.

Where this project sits

This project sits in Memphis, Shelby County, Tennessee. Each place page carries the projects tracked there, who provides its power and water, and its local rules.

2 MWAnnounced capacity
3Public records we have found

For homeowners

What this project means if you live nearby

We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.

Newswire for Shelby County

  1. What the record shows · November 22, 2026

    SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days

  2. What the record shows · November 28, 2026

    Loudoun County data centers: the complete record

  3. What the record shows · November 22, 2026

    PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

Aerial view of Expedient Memphis in Memphis, Shelby County, Tennessee, captured 2021
Aerial image, USDA National Agriculture Imagery Program, via the USGS National Map, Public domain (USDA NAIP), captured 2021Aerial images can be older than the campus. This one shows what was on the ground when it was taken.Source: USDA National Agriculture Imagery Program, via the USGS National MapLicense: Public domain (USDA NAIP)
Site-level positionPin placed from the position we have on file, inside Shelby County, Tennessee.See every project on the map

Bills and laws in Tennessee

All 12 in Bill Watch

Who's involved

Power

Capacity, as announced or filed

  • 2 MW · Facility totalNov 2026 · generator_capacity
  • 1.5 MW · Facility totalNov 2026 · it_load

Public records

3 records found so far. 6 kinds of record are still being collected.

See every record

Court cases and commission dockets

Questions people ask

Where is Expedient Memphis?
Expedient Memphis is a data center project in Memphis, Shelby County, Tennessee.
Who operates Expedient Memphis?
Expedient is named as the operator of Expedient Memphis.
How big is Expedient Memphis?
Expedient Memphis was announced at 1.5 MW of capacity.
What stage is Expedient Memphis?
Expedient Memphis is operating.

Sources

Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.

  1. 1
    Memphis City Council regular agenda October 20 2026
    City of Memphis
    Tier 1 · Captured 2026-11-08 · Open the source
  2. 2
    Electric Service Schedule TDC, Time of Use Data Service (rate effective October 1, 2026)
    Memphis Light, Gas and Water Division, City of Memphis
    Tier 1 · Captured 2026-11-11 · Open the source · Archived copy
  3. 3
    Minutes, Meeting of the City Council, City of Memphis, August 19, 2025
    City of Memphis
    Tier 1 · Captured 2026-11-09 · Open the source
  4. 4
    Memphis Data Center (MEM1), 3180 Players Lane — Expedient facility page
    Expedient
    Tier 4 · Captured 2026-11-10 · Open the source
  5. 5
    Memphis (Germantown) Data Center sell sheet — Expedient
    Expedient
    Tier 4 · Captured 2026-11-10 · Open the source
  6. 6
    EIA Form 861, Service Territory file, 2025 (final)
    U.S. Energy Information Administration
    Tier 1 · Captured 2026-11-11 · Open the source · Archived copy

No corrections have been published for this page. Corrections log · Report an error or send a tip on this page