Project File
Microsoft Medina County data center (SAT89/SAT90)
Medina County,TexasUnder constructionFirst public 2026Last checked Nov 8, 2026
MicrosoftDeveloper and operator
Details confirmed
Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.
3 of 6 details confirmed
- Confirmed: County
- Confirmed: Stage
- Confirmed: First public date
- Still to confirm: City or address
- Still to confirm: Capacity
- Still to confirm: Electric utility
What happens next: No upcoming date is on record.
Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.
Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.
Microsoft Medina County data center (SAT89/SAT90) is a under-construction data center project in Medina County, Texas. Microsoft is named as operator. It was first public in 2026. No site capacity figure is published for this project.
Microsoft Medina County data center (SAT89/SAT90) is an under-construction data center project in Medina County, Texas. Microsoft is named as operator. No site capacity figure is published for this project. 3 of the six core facts we track for every project are confirmed on this page.
Where this project sits
This project sits in Medina County, Texas. Each place page carries the projects tracked there, who provides its power and water, and its local rules.
For homeowners
What this project means if you live nearby
We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
Timeline
- · New projectFirst public record of Microsoft Medina County data center (SAT89/SAT90)Under construction
Laws and bills that may apply here
Found by each bill's own place and size rules. Each one says who has checked it so far.
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Texas SB 6: Sets grid connection and cost rules for large loads in Texas
The reliability service covers large load customers in the ERCOT power region with a demand of at least 75 megawatts, and bars customers that curtail in response to wholesale prices or take part in another reliability or ancillary service; this project has no capacity figure on record, and its demand and its participation in another reliability or ancillary service are not on record.
“The commission shall require the independent organization certified under Section 39.151 for the ERCOT power region to develop a reliability service to competitively procure demand reductions from large load customers with a demand of at least 75 megawatts to be deployed in the event of an anticipated emergency condition.” (SECTION 4, Utilities Code Sec. 39.170(b))
Rule checks: Project is in Texas. Still to check: size: unknown, who it covers: not checked
Bills and laws in Texas
- SB 6 · Signed into law · Jun 20, 2025Sets grid connection and cost rules for large loads in Texas
- SB 2222 · Died or failed · Mar 25, 2025Would exempt data center property and energy equipment from property tax
Who's involved
- Developer and operatorMicrosoft
Public records
1 records found so far. 8 kinds of record are still being collected.
See every recordQuestions people ask
- Where is Microsoft Medina County data center (SAT89/SAT90)?
- Microsoft Medina County data center (SAT89/SAT90) is a data center project in Medina County, Texas.
- Who operates Microsoft Medina County data center (SAT89/SAT90)?
- Microsoft is named as the operator of Microsoft Medina County data center (SAT89/SAT90).
- What stage is Microsoft Medina County data center (SAT89/SAT90)?
- Microsoft Medina County data center (SAT89/SAT90) is under construction. It was first public in 2026.
Sources
Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.
- 1Local Development Agreement Database (SB 1340), Chapter 380/381 agreements dataset
Texas Comptroller of Public AccountsTier 1 · Captured 2026-11-17 · Open the source - 2TCEQ Permit by Rule Registration No. 182686, Project No. 403435 (Microsoft, Medina County)
Texas Commission on Environmental QualityTier 1 · Captured 2026-11-08 · Open the source
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page