Skip to content

State Card

Data centers in Indiana

Draft research: figures were traced to their sources by an AI research agent and have not passed verification yet.

Data Center Fact Check tracks 20 data center projects in Indiana as of November 2026: 6 operating, 5 approved and 4 under construction, totaling about 1,335 MW announced where a figure is published.

Indiana has 20 tracked data centers. Their announced capacity totals about 1,335 MW where a figure is published. Of those, 6 operating, 5 approved and 4 under construction. Every project we track here is listed below, with the public records behind it. Every figure comes from the public record linked on this page.

20Data center projects we track

Data center projects in Indiana

Who serves this place

  • Not collected yet.

Counties and cities in Indiana

Counties

Cities and towns

For homeowners

What the projects here mean if you live nearby

Each fact says which way it runs: comes to the community (such as tax paid), comes from the community (such as water or a tax break), or goes both ways. The labels show direction, not whether it is good or bad. How we work

  1. Property tax

    • Meta Jeffersonville Data Center:The City Council approved a property tax exemption agreement in 2022; the minutes state neither its length nor its size.

      Goes both ways
  2. Tax breaks

  3. Money for schools and services

  4. Electricity bill

    • Meta Jeffersonville Data Center:The average Duke Energy Indiana home paid $148.57 a month in 2025, up from $117.55 in 2016, not adjusted for inflation.

      Not known yet
  5. Water

  6. Jobs

  7. Next door: height, setbacks, noise

  8. Your say

Tax breaks and payments

  • 2022 · Meta Jeffersonville Data Center

    Development agreement, titled a Property Tax Exemption Agreement (Resolution 2022-R-10)

    All tax records for Meta Jeffersonville Data Center
  • 2026 · Amazon Hobart Data Center Campus

    Real property tax abatement approved by City of Hobart Resolution 2026-02

    100 percent real property tax abatement for each building, per the developer summary in the January 7, 2026 council minutes.

    All tax records for Amazon Hobart Data Center Campus
  • 2026 · Amazon Hobart Data Center Campus

    Real property tax abatement approved by City of Hobart Resolution 2026-03

    100 percent real property tax abatement for each building, on the same terms summarized for the project in the January 7, 2026 council minutes.

    All tax records for Amazon Hobart Data Center Campus
  • 2026 · Amazon Hobart Data Center Campus

    Enterprise information technology equipment tax exemption approved by City of Hobart Resolution 2026-04

    100 percent exemption for enterprise information technology equipment for 35 years, per the developer summary in the January 7, 2026 council minutes.

    All tax records for Amazon Hobart Data Center Campus

Local rules for data centers

  • In effect · Zoning · Adopted Dec 18, 2007

    Data processing or analysis is a permitted use in the M1 Light Industrial district, and in M2 through the M1 list

    The M1 Light Industrial district permits, by right, engineering or research laboratories, vocational or industrial training facilities, and data processing or analysis, along with a catch all for other comparable and compatible uses. The M2 Heavy Industrial district permits any use permitted in the M1 district, except day care centers and churches, so the same data processing use carries into M2. The county code has no definition of data center or data processing center, so a modern data center would rest on this data processing wording or the comparable use clause.

  • In effect · Setback · Adopted Dec 18, 2007

    A 250 foot setback where an M1 lot faces or abuts residential zoning, plus road based front setbacks and a height rule

    Where a front, side, or rear industrial lot line faces land zoned A1, RP, R1, or R2 across a street, or abuts any of those districts, the minimum setback is 250 feet, and that area may be used only for driveways and parking and must be landscaped with opaque fencing and natural buffer material. Front setbacks otherwise run from the road by road class, and building height is capped at 40 feet unless extra setback is traded for height up to 100 feet.

In the news

More stories about this place

Recent cases and dockets in Indiana

All 7 court cases and commission dockets in Indiana

Bills and laws in Indiana

Open Bill Watch

Latest from the newswire

  1. What the record shows · November 28, 2026

    Loudoun County data centers: the complete record

  2. What the record shows · November 22, 2026

    SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days

  3. What the record shows · November 22, 2026

    PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

Questions people ask

How many data centers are in Indiana?
Data Center Fact Check tracks 20 data center projects in Indiana as of November 2026. Of those, 6 operating, 5 approved and 4 under construction.
What is the biggest data center in Indiana?
By announced capacity, the biggest data center in Indiana is Meta Lebanon Data Center Campus, announced at 1,000 MW. It is under construction.
How much power do data centers in Indiana use?
The 20 projects tracked in Indiana have announced about 1,335 MW of capacity in total, where a figure is published. That is announced capacity, not measured electricity use.

Sources

  1. 1
    Common Council Regular Meeting Minutes, September 19, 2022
    City of Jeffersonville
    Tier 1 · Open the source
  2. 2
    Gov. Holcomb announces Meta to build an $800M Data Center Campus in Indiana (IEDC release, January 25, 2024)
    Indiana Economic Development Corporation (via GlobeNewswire)
    Tier 4 · Open the source
  3. 3
    EIA Form 861 2025, Sales to Ultimate Customers file
    U.S. Energy Information Administration
    Tier 1 · Open the source
  4. 4
    EIA Form 861 2016, Sales to Ultimate Customers file
    U.S. Energy Information Administration
    Tier 1 · Open the source
  5. 5
    Electricity Rate Designs for Large Loads: Evolving Practices and Opportunities
    Lawrence Berkeley National Laboratory
    Tier 2 · Open the source
  6. 6
    2024 Annual Water Quality Report, Southern Indiana Operations (PWS ID IN5210005)
    Indiana American Water
    Tier 4 · Open the source
  7. 7
    Jeffersonville passes year-long data center moratorium
    WDRB / WAVE (Louisville)
    Tier 3 · Open the source
  8. 8
    Jeffersonville data center zoning explained: How Meta got approved
    Rural News Network
    Tier 3 · Open the source
  9. 9
    Clark County, Indiana Code of Ordinances, Section 156.28 (M1 Light Industrial)
    Clark County, Indiana (American Legal Publishing)
    Tier 1 · Open the source
  10. 10
    City of Hobart Common Council Minutes, January 7, 2026
    City of Hobart
    Tier 1 · Open the source

Cite this page

Copy this citation when you reuse a figure or a finding from this page.

Data Center Fact Check. "Indiana." Accessed 2026-11-29. https://datacenterfactcheck.org/places/us-in

No corrections have been published for this page. Corrections log · Report an error or send a tip on this page