city Card
Data centers in Lebanon, Indiana
Draft research: figures were traced to their sources by an AI research agent and have not passed verification yet.
Data Center Fact Check tracks 1 data center project in Lebanon, Indiana as of November 2026, totaling about 1,000 MW announced where a figure is published.
Lebanon has 1 tracked data center project. Their announced capacity totals about 1,000 MW where a figure is published. The project here is Meta Lebanon Data Center Campus, under construction. Every figure comes from the public record linked on this page.
Data center projects in Lebanon
- Meta Lebanon Data Center Campus
Under constructionLebanon1,000 MW announced
Who serves this place
- Not collected yet.
Court cases and commission dockets in Indiana (7)
Bills and laws in Indiana
- HB 1333 · Passed one chamber · Feb 5, 2026Requires local agreement before data centers use a state tax exemption
- SB 257 · In committee · Jan 8, 2026Would bar the state commission from approving an electric rate increase to the extent it is related solely to the cost of serving a data center or a large facility with fewer than 50 full-time employees
- SB 79 · In committee · Jan 6, 2026Would require a state working group estimate of data center electricity demand, quarterly electricity-use reports from operators, and local permit disclosure of projected power and water use
- HB 1189 · In committee · Jan 5, 2026Would require a state incentive agreement with a qualified data center user to limit project bids and requests for proposals to labor unions or employers that have project labor agreements
- HB 1245 · In committee · Jan 5, 2026Requires a state study of data center demand effects on rates
- SB 83 · In committee · Dec 8, 2025Broad utility bill whose one data center provision repeals the sales and use tax exemption for certain data centers enacted in the 2025 session in HEA 1601
- SB 431 · Signed into law · Apr 10, 2025Bars foreign adversaries from building, buying or investing in Indiana data centers
- SB 135 · Died or failed · Jan 8, 2025Would require data center electricity reporting, permit disclosure and a demand study
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
Questions people ask
- How many data centers are in Lebanon?
- Data Center Fact Check tracks 1 data center project in Lebanon as of November 2026.
- What is the biggest data center in Lebanon?
- By announced capacity, the biggest data center in Lebanon is Meta Lebanon Data Center Campus, announced at 1,000 MW. It is under construction.
- How much power do data centers in Lebanon use?
- The 1 projects tracked in Lebanon have announced about 1,000 MW of capacity in total, where a figure is published. That is announced capacity, not measured electricity use.
Sources
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "Lebanon." Accessed 2026-11-29. https://datacenterfactcheck.org/places/us-in-lebanon
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page