Skip to content

Project File

Metrobloks IND A1

Indianapolis city (balance),Marion County,IndianaApprovedFirst public 2026Last checked Nov 8, 2026

MetrobloksDeveloper and operatorAES IndianaElectric utility

Saved in this browser; see it under My feed. Email alerts are not available yet.

Details confirmed

Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.

5 of 6 details confirmed

  • Confirmed: County
  • Confirmed: City or address
  • Confirmed: Stage
  • Confirmed: Capacity
  • Confirmed: First public date
  • Still to confirm: Electric utility
Know the record? Send it to us

What happens next: No upcoming date is on record.

Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.

Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.

Metrobloks IND A1 is an approved data center project in Indianapolis city (balance), Marion County, Indiana. Metrobloks is named as operator. It was first public in 2026. It was announced at 71.4 MW.

Metrobloks IND A1 is an approved data center project in Indianapolis city (balance), Marion County, Indiana. Metrobloks is named as operator. It was announced at 71.4 MW. 5 of the six core facts we track for every project are confirmed on this page.

Where this project sits

This project sits in Indianapolis city (balance), Marion County, Indiana. Each place page carries the projects tracked there, who provides its power and water, and its local rules.

71 MWAnnounced capacity
0Public records we have found

For homeowners

What this project means if you live nearby

We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.

Latest from the newswire

  1. What the record shows · November 28, 2026

    Loudoun County data centers: the complete record

  2. What the record shows · November 22, 2026

    SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days

  3. What the record shows · November 22, 2026

    PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

Aerial view of Metrobloks IND A1 in Indianapolis city (balance), Marion County, Indiana, captured 2022
Aerial image, USDA National Agriculture Imagery Program, via the USGS National Map, Public domain (USDA NAIP), captured 2022Aerial images can be older than the campus. This one shows what was on the ground when it was taken.Source: USDA National Agriculture Imagery Program, via the USGS National MapLicense: Public domain (USDA NAIP)
Site-level positionPin placed from the position we have on file, inside Marion County, Indiana.See every project on the map

The land, to scale

One football field
15.5 acres, about 12 football fields. Drawn as a square for scale; the real shape is not known.

Timeline

  1. · New projectFirst public record of Metrobloks IND A1Approved

Bills and laws in Indiana

All 8 in Bill Watch

Who's involved

Power

Capacity, as announced or filed

  • 71.4 MW · At buildoutit_load

Public records

0 records found so far. 9 kinds of record are still being collected.

    See every record

    Questions people ask

    Where is Metrobloks IND A1?
    Metrobloks IND A1 is a data center project in Indianapolis city (balance), Marion County, Indiana.
    Who operates Metrobloks IND A1?
    Metrobloks is named as the operator of Metrobloks IND A1.
    How big is Metrobloks IND A1?
    Metrobloks IND A1 was announced at 71.4 MW of capacity. The site covers 15.5 acres.
    What stage is Metrobloks IND A1?
    Metrobloks IND A1 is approved. It was first public in 2026.

    Sources

    Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.

    1. 1
      IND A1 - Indianapolis
      Metrobloks
      Tier 4 · Captured 2026-11-08 · Open the source
    2. 2
      $500m data center approved for construction outside Indianapolis
      Data Center Dynamics
      Tier 3 · Captured 2026-11-08 · Open the source
    3. 3
      How data centers in Indianapolis could affect your electric bill
      Mirror Indy
      Tier 3 · Captured 2026-11-08 · Open the source
    4. 4
      U.S. Census Geocoder (batch geographies endpoint)
      U.S. Census Bureau
      Tier 1 · Captured 2026-11-11 · Open the source

    No corrections have been published for this page. Corrections log · Report an error or send a tip on this page