Data centers in South Dakota
Draft research: figures were traced to their sources by an AI research agent and have not passed verification yet.
Data Center Fact Check tracks 2 data center projects in South Dakota as of November 2026: 1 proposed and 1 cancelled, totaling about 930 MW announced where a figure is published.
South Dakota has 2 tracked data centers. Their announced capacity totals about 930 MW where a figure is published. Of those, 1 proposed and 1 cancelled. The projects here are Applied Digital Toronto (proposed) and Gemini Capital Sioux Falls Data Center (proposed). Every figure comes from the public record linked on this page.
Data center projects in South Dakota
- Applied Digital Toronto (proposed)
CancelledToronto430 MW announced
- Gemini Capital Sioux Falls Data Center (proposed)
ProposedSioux Falls500 MW announced
Who serves this place
- Not collected yet.
Counties and cities in South Dakota
Counties
- Deuel County1 data center project tracked
- Minnehaha County1 data center project tracked
Cities and towns
- Sioux Falls1 data center project tracked
- Toronto1 data center project tracked
Recent cases and dockets in South Dakota
- Utility commission · Pending before the commissionIn the Matter of Black Hills Power, Inc. d/b/a Black Hills Energy for Approval of a Blockchain Interruptible Electric Service Agreement (CSRE Properties South Dakota, LLC)
- Utility commission · In effectIn the Matter of Black Hills Power, Inc. d/b/a Black Hills Energy for approval to implement an economic flexible load service tariff and amend its energy cost adjustment tariff (Blockchain Interruptible Service Tariff)
Bills and laws in South Dakota
- HB 1005 · Died or failedFifty year sales tax exemption for data center equipment
- HB 1038 · Signed into law · Mar 24, 2026PUC may bill data centers for contract review costs
- SB 135 · Signed into law · Mar 24, 2026Data center bill of rights: power costs, water, local control
- SB 239 · Died or failed · Feb 24, 2026Sales tax relief for large projects including data centers
- SB 232 · Died or failed · Feb 18, 2026One year moratorium on hyperscale data centers
- HB 1301 · Died or failed · Feb 18, 2026Moratorium and cost limits for large data centers
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
Questions people ask
- How many data centers are in South Dakota?
- Data Center Fact Check tracks 2 data center projects in South Dakota as of November 2026. Of those, 1 proposed and 1 cancelled.
- What is the biggest data center in South Dakota?
- By announced capacity, the biggest data center in South Dakota is Gemini Capital Sioux Falls Data Center (proposed), announced at 500 MW. It is proposed.
- How much power do data centers in South Dakota use?
- The 2 projects tracked in South Dakota have announced about 930 MW of capacity in total, where a figure is published. That is announced capacity, not measured electricity use.
Sources
Cite this page
Copy this citation when you reuse a figure or a finding from this page.