Data Center Fact Check tracks 6 data center projects in Kentucky as of November 2026: 2 proposed, 2 approved and 1 announced, totaling about 2,200 MW announced where a figure is published.
Kentucky has 6 tracked data centers. Their announced capacity totals about 2,200 MW where a figure is published. Of those, 2 proposed, 2 approved and 1 announced. Every project we track here is listed below, with the public records behind it. Every figure comes from the public record linked on this page.
Data center projects in Kentucky
- Carrollton Industrial Campus
Announced
- CyrusOne Florence
OperatingFlorence
- DECA Companies data center (Ghent, Carroll County)
ProposedGhent
- Meta data center campus (Mason County)
Approved
- Paducah data center campus (DOE Paducah Site)
Proposed1,800 MW announced
- PowerHouse and Poe Companies data center campus (Louisville)
ApprovedLouisville400 MW announced
Who serves this place
- Not collected yet.
Counties and cities in Kentucky
Counties
- Boone County1 data center project tracked
- Carroll County2 data center projects tracked
- Jefferson County1 data center project tracked
- Mason County1 data center project tracked
- McCracken County1 data center project tracked
Cities and towns
- Florence1 data center project tracked
- Ghent1 data center project tracked
- Louisville1 data center project tracked
Tax breaks and payments
Sales and use tax exemption for approved projects (KRS 154.20-220 to 154.20-229; exemption at KRS 139.499)
Data center equipment purchased or leased by an approved qualified data center project is exempt from sales and use tax, covering purchase, installation, repair, and replacement. The Kentucky Economic Development Finance Authority (KEDFA) gives preliminary approval and signs a memorandum of agreement; the Department of Revenue then issues an exemption certificate, and exempt purchases may begin on preliminary approval. Final approval follows proof that the memorandum of agreement requirements were met.
Recent cases and dockets in Kentucky
- Utility commission · DecidedElectronic Tariff Filing of Big Rivers Electric Corporation of a Retail Electric Service Agreement with Justified DataPower LLC, a subsidiary of TeraWulf Inc.
- Utility commission · In effectElectronic Application of Kentucky Utilities Company for an Adjustment of its Electric Rates and Approval of Certain Regulatory and Accounting Treatments (creating Standard Rate EHLF)
- Utility commission · In effectElectronic Application of Louisville Gas and Electric Company for an Adjustment of its Electric Rates (creating Standard Rate EHLF)
- Utility commission · In effectElectronic Tariff Filing of East Kentucky Power Cooperative, Inc. to Establish a New Tariff for Data Center Power (Rate DCP)
- Utility commission · DecidedElectronic Application of Kentucky Utilities Company and Louisville Gas and Electric Company for Certificates of Public Convenience and Necessity and Site Compatibility Certificates
- Utility commission · In effectElectronic Tariff Filing of Kentucky Power Company to Revise Its Industrial General Service Tariff
Bills and laws in Kentucky
- HB 593 · Died or failed · Mar 31, 2026Requires data center power contracts that protect other customers
- HB 856 · Died or failed · Mar 10, 2026Requires water feasibility studies and annual water reports
- SB 319 · Died or failed · Mar 2, 2026Requires decommissioning plans for data centers on farmland
- HB 544 · Died or failed · Feb 10, 2026Requires commission approval for power service over 100 megawatts
- HB 775 · In effect · Mar 27, 2025Extends data center tax incentives to counties statewide by population
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
Questions people ask
- How many data centers are in Kentucky?
- Data Center Fact Check tracks 6 data center projects in Kentucky as of November 2026. Of those, 2 proposed, 2 approved and 1 announced.
- What is the biggest data center in Kentucky?
- By announced capacity, the biggest data center in Kentucky is Paducah data center campus (DOE Paducah Site), announced at 1,800 MW. It is proposed.
- How much power do data centers in Kentucky use?
- The 6 projects tracked in Kentucky have announced about 2,200 MW of capacity in total, where a figure is published. That is announced capacity, not measured electricity use.
Sources
- 1KRS 154.20-226, Application, approval, and review process (Qualified Data Center Project program, KRS 154.20-220 to 154.20-229)
Kentucky Legislative Research CommissionTier 1 · Open the source
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "Kentucky." Accessed 2026-11-29. https://datacenterfactcheck.org/places/us-ky
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page