Project File
Paducah data center campus (DOE Paducah Site)
McCracken County,KentuckyProposedFirst public 2026Filing entity: BrookfieldLast checked Nov 13, 2026
BrookfieldDeveloper and operatorNextEra EnergyDeveloperJackson Purchase EnergyElectric utilityBig Rivers ElectricElectric utility
Details confirmed
Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.
4 of 6 details confirmed
- Confirmed: County
- Confirmed: Stage
- Confirmed: Capacity
- Confirmed: First public date
- Still to confirm: City or address
- Still to confirm: Electric utility
What happens next: No upcoming date is on record.
Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.
Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.
Paducah data center campus (DOE Paducah Site) is a proposed data center project in McCracken County, Kentucky. Brookfield is named as operator. It was first public in 2026. It was announced at 1,800 MW.
Paducah data center campus (DOE Paducah Site) is a proposed data center project in McCracken County, Kentucky. Brookfield is named as operator. It was announced at 1,800 MW. 4 of the six core facts we track for every project are confirmed on this page.
Where this project sits
This project sits in McCracken County, Kentucky. Each place page carries the projects tracked there, who provides its power and water, and its local rules.
For homeowners
What this project means if you live nearby
We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
Timeline
- · New projectFirst public record of Paducah data center campus (DOE Paducah Site)Proposed
Laws and bills that may apply here
Found by each bill's own place and size rules. Each one says who has checked it so far.
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Kentucky HB 775: Extends data center tax incentives to counties statewide by population
The act covers owners, operators, or colocation tenants of a qualified data center project that meet the capital investment tier for their county's population, from $25 million in counties of 50,000 or fewer people to $450 million in counties of 100,000 or more; this project has 4,600 MW on record (generator capacity), but the project's capital investment and the population tier of its county is not on record.
“For an owner, operator, or colocation tenant, at least: Four hundred fifty million dollars ($450,000,000) if located in a county having a population equal to or greater than one hundred thousand (100,000); One hundred million dollars ($100,000,000) if located in a county having a population greater than fifty thousand (50,000) but less than one hundred thousand (100,000); or Twenty-five million dollar ($25,000,000) if located in a county having a population of not more than fifty thousand (50,000).” (Section 34, KRS 154.20-220(17)(b)1)
Rule checks: Project is in Kentucky. Still to check: who it covers: not checked
Bills and laws in Kentucky
- HB 593 · Died or failed · Mar 31, 2026Requires data center power contracts that protect other customers
- HB 856 · Died or failed · Mar 10, 2026Requires water feasibility studies and annual water reports
- SB 319 · Died or failed · Mar 2, 2026Requires decommissioning plans for data centers on farmland
- HB 544 · Died or failed · Feb 10, 2026Requires commission approval for power service over 100 megawatts
- HB 775 · In effect · Mar 27, 2025Extends data center tax incentives to counties statewide by population
Who's involved
- Developer and operatorBrookfield
- DeveloperNextEra Energy
- Electric utilityJackson Purchase Energy
- Electric utilityBig Rivers Electric
- Electric utilityPaducah Power System
- Public partnerDepartment of Energy
Power
Capacity, as announced or filed
- 1,800 MW · Full build-outJul 2026 · grid connection
- 1,200 MW · Full build-outJul 2026 · it_load
- 4,600 MW · Full build-outJul 2026 · generator_capacity
Public records
0 records found so far. 9 kinds of record are still being collected.
Questions people ask
- Where is Paducah data center campus (DOE Paducah Site)?
- Paducah data center campus (DOE Paducah Site) is a data center project in McCracken County, Kentucky.
- Who operates Paducah data center campus (DOE Paducah Site)?
- Brookfield is named as the operator of Paducah data center campus (DOE Paducah Site).
- How big is Paducah data center campus (DOE Paducah Site)?
- Paducah data center campus (DOE Paducah Site) was announced at 1,800 MW of capacity.
- What stage is Paducah data center campus (DOE Paducah Site)?
- Paducah data center campus (DOE Paducah Site) is proposed. It was first public in 2026.
Sources
Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.
- 1DOE Site in Western Kentucky Revitalized with Data Center Campus and Dedicated Energy Project
NextEra Energy, Inc. and coalition partners via PR NewswireTier 4 · Captured 2026-11-08 · Open the source
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page