Data centers in North Dakota

Draft research: figures were traced to their sources by an AI research agent and have not passed verification yet.

Data Center Fact Check tracks 4 data center projects in North Dakota as of November 2026: 1 announced, 1 proposed and 1 under construction, totaling about 1,180 MW announced where a figure is published.

North Dakota has 4 tracked data centers. Their announced capacity totals about 1,180 MW where a figure is published. Of those, 1 announced, 1 proposed and 1 under construction. Every figure comes from the public record linked on this page.

4Data center projects we track

Data center projects in North Dakota

Who serves this place

  • Not collected yet.

Counties and cities in North Dakota

Counties

Cities and towns

  • Center1 data center project tracked
  • Ellendale1 data center project tracked
  • Harwood1 data center project tracked
  • Nekoma1 data center project tracked

Tax breaks and payments

  • Sales and use tax exemption, enterprise information technology equipment and computer software in a qualified data center (N.D.C.C. Section 57-39.2-04.17)

    Gross receipts from sales of enterprise information technology equipment and computer software purchased for use by a qualifying business in a qualified data center are exempt from North Dakota sales and use tax. Covered equipment includes computer hardware, servers, routers, cooling systems and cooling towers, temperature control and power infrastructure for transforming, distributing, or managing electricity used in the center, exterior dedicated business-owned substations, backup power generation and battery systems, and racking systems, raised flooring, cabling, and trays; computer software includes software used or loaded at the center and its maintenance, licensing, and customization. Purchases of upgraded or replacement equipment and software are also exempt. The exemption has no statutory end date and no investment or jobs minimum.

Recent cases and dockets in North Dakota

All 1 court cases and commission dockets in North Dakota

Bills and laws in North Dakota

Open Bill Watch

Latest from the newswire

  1. What the record shows · November 28, 2026

    Loudoun County data centers: the complete record

  2. What the record shows · November 22, 2026

    SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days

  3. What the record shows · November 22, 2026

    PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

Questions people ask

How many data centers are in North Dakota?
Data Center Fact Check tracks 4 data center projects in North Dakota as of November 2026. Of those, 1 announced, 1 proposed and 1 under construction.
What is the biggest data center in North Dakota?
By announced capacity, the biggest data center in North Dakota is Applied Digital Polaris Forge 1, announced at 400 MW. It is expanding.
How much power do data centers in North Dakota use?
The 4 projects tracked in North Dakota have announced about 1,180 MW of capacity in total, where a figure is published. That is announced capacity, not measured electricity use.

Sources

  1. 1
    Data Centers Study, Background Memorandum (LC# 27.9237.01000)
    North Dakota Legislative Council
    Tier 1 · Open the source
  2. 2
    Economic Development Tax Incentive Study, Qualified Data Center Sales Tax Exemption (presentation to the Tax Reform and Relief Advisory Committee)
    North Dakota Office of State Tax Commissioner
    Tier 1 · Open the source

Cite this page

Copy this citation when you reuse a figure or a finding from this page.

Data Center Fact Check. "North Dakota." Accessed 2026-11-29. https://datacenterfactcheck.org/places/us-nd

No corrections have been published for this page. Corrections log · Report an error or send a tip on this page