Skip to content

Project File

Applied Digital Polaris Forge 1

Ellendale,Dickey County,North DakotaExpandingFirst public 2025Last checked Nov 13, 2026

Applied DigitalDeveloper and operatorCoreWeaveEnd user

Saved in this browser; see it under My feed. Email alerts are not available yet.

Details confirmed

Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.

5 of 6 details confirmed

  • Confirmed: County
  • Confirmed: City or address
  • Confirmed: Stage
  • Confirmed: Capacity
  • Confirmed: First public date
  • Still to confirm: Electric utility
Know the record? Send it to us

What happens next: No upcoming date is on record.

Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.

Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.

Applied Digital Polaris Forge 1 is an expanding data center project in Ellendale, Dickey County, North Dakota. Applied Digital is named as operator. It was first public in 2025. It was announced at 400 MW.

Applied Digital Polaris Forge 1 is an expanding data center project in Ellendale, Dickey County, North Dakota. Applied Digital is named as operator. It was announced at 400 MW. 5 of the six core facts we track for every project are confirmed on this page.

Where this project sits

This project sits in Ellendale, Dickey County, North Dakota. Each place page carries the projects tracked there, who provides its power and water, and its local rules.

400 MWAnnounced capacity
0Public records we have found

For homeowners

What this project means if you live nearby

We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.

Latest from the newswire

  1. What the record shows · November 28, 2026

    Loudoun County data centers: the complete record

  2. What the record shows · November 22, 2026

    SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days

  3. What the record shows · November 22, 2026

    PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

County outline onlyExact site not confirmed yet. The outline shows Dickey County, North Dakota.See every project on the map

Timeline

  1. · New projectFirst public record of Applied Digital Polaris Forge 1Expanding

Bills and laws in North Dakota

Open Bill Watch

Who's involved

Power

Capacity, as announced or filed

  • 400 MW · Full buildout, contractedOct 2026 · it_load
  • 250 MW · Operational at Oct. 2, 2026Oct 2026 · it_load

Public records

0 records found so far. 9 kinds of record are still being collected.

    See every record

    Questions people ask

    Where is Applied Digital Polaris Forge 1?
    Applied Digital Polaris Forge 1 is a data center project in Ellendale, Dickey County, North Dakota.
    Who operates Applied Digital Polaris Forge 1?
    Applied Digital is named as the operator of Applied Digital Polaris Forge 1.
    How big is Applied Digital Polaris Forge 1?
    Applied Digital Polaris Forge 1 was announced at 400 MW of capacity.
    What stage is Applied Digital Polaris Forge 1?
    Applied Digital Polaris Forge 1 is expanding. It was first public in 2025.

    Sources

    Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.

    1. 1
      Applied Digital Brings an Additional 75 MW of AI Infrastructure Online at Polaris Forge 1
      Applied Digital Corporation via GlobeNewswire
      Tier 4 · Captured 2026-11-08 · Open the source

    No corrections have been published for this page. Corrections log · Report an error or send a tip on this page