State Card
Data centers in Georgia
Draft research: figures were traced to their sources by an AI research agent and have not passed verification yet.
Data Center Fact Check tracks 82 data center projects in Georgia as of November 2026: 36 proposed, 24 operating and 14 under construction, totaling about 16,183 MW announced where a figure is published.
Georgia has 82 tracked data centers. Their announced capacity totals about 16,183 MW where a figure is published. Of those, 36 proposed, 24 operating and 14 under construction. Every project we track here is listed below, with the public records behind it. Every figure comes from the public record linked on this page.
OpenAI Project Camellia video · 1 min 56 sec
Data center projects in Georgia
- 75 South Data Center Campus
Proposed450 MW announced
- Aligned ATL-01
OperatingDouglasville
- Aligned Data Centers ATL-01 (Lithia Springs)
OperatingDouglasville
- ATL03 (Red Oak Road)
ProposedUnion City
- ATL11 (Stonewall Tell Road)
ProposedUnion City
- Bridgeport (Revised) Technological Facility
Proposed
- CoreSite AT1 Atlanta
OperatingAtlanta
- DataBank ATL1 Midtown Atlanta
OperatingAtlanta7 MW announced
- DataBank ATL4 South Fulton
OperatingAtlanta40 MW announced
- DataBank ATL5 (Atlanta)
OperatingSouth Fulton48 MW announced
- DataBank ATL6 (Atlanta)
OperatingSouth Fulton72 MW announced
- DataBank Atlanta West End Campus (ATL2 and ATL3)
OperatingAtlanta10 MW announced
- DataBank Lithia Springs Campus (ATL5 and ATL6)
Under constructionAtlanta120 MW announced
- DataBank Project Indo
In permittingCartersville200 MW announced
- Data Center at 0 Social Circle Parkway
ProposedSocial Circle
- DC BLOX Atlanta East (Conyers)
Under constructionConyers216 MW announced
- DC BLOX Atlanta West (Douglasville)
Under constructionDouglasville200 MW announced
- Digital Realty ATL15 and ATL16 (Fort Gillem)
ProposedForest Park
- Digital Realty Atlanta Connected Campus (ATL13 and ATL14)
OperatingAtlanta
- EdgeConneX Atlanta Campus (ATL01 and ATL02)
OperatingAtlanta
- Edged Atlanta Campus (Tilford Yard)
ExpandingAtlanta168 MW announced
- Equinix AT1 Atlanta
OperatingAtlanta
- Equinix AT4 Atlanta
OperatingAtlanta
- Fairburn Technology Center
ProposedFairburn
- Flexential Atlanta - Alpharetta
OperatingAlpharetta6 MW announced
- Flexential Atlanta-Douglasville Campus
OperatingDouglasville23 MW announced
- Flexential Atlanta - Norcross
OperatingNorcross2 MW announced
- Google Columbia County Data Center (White Oak Technology Park)
Approved1,400 MW announced
- Google Douglas County data center
OperatingLithia Springs
- Google LaGrange Data Center
Under constructionLaGrange350 MW announced
- Gregory Road Data Center
ProposedCovington
- H5 Data Centers Atlanta
OperatingAtlanta
- Hampton Technology Park
ProposedHampton1,500 MW announced
- Highway 16 Interstate Health Development
Proposed
- Kingston Technology Hub
ProposedKingston150 MW announced
- Meta Newton Data Center (Stanton Springs)
OperatingSocial Circle1,184,380 MWh used in 2024, reported
- Microsoft ATL06 (East Point)
Under constructionEast Point
- Microsoft ATL50
ProposedUnion City
- Microsoft ATL80
Proposed422 MW announced
- Microsoft CCO06 (Palmetto)
Under constructionPalmetto
- Microsoft FTY01 (Douglasville)
Under constructionDouglasville
- Nixon Technology Center
Proposed600 MW announced
- OpenAI Project Camellia
In permittingRincon3,200 MW announced
- Project Arrowhead
Proposed1,250 MW announced
- Project Avemore
ProposedVilla Rica
- Project Azelea
Proposed400 MW announced
- Project Bunkhouse (Digital Realty Stilesboro Campus)
Under construction1,300 MW announced
- Project Bus
CancelledTemple
- Project Gracie
In permitting
- Project Ruby
ProposedColumbus600 MW announced
Who serves this place
- Not collected yet.
Counties and cities in Georgia
Counties
- Bartow County4 data center projects tracked
- Butts County1 data center project tracked
- Carroll County2 data center projects tracked
- Clayton County2 data center projects tracked
- Cobb County1 data center project tracked
- Columbia County2 data center projects tracked
- Coweta County3 data center projects tracked
- Douglas County14 data center projects tracked
- Early County2 data center projects tracked
- Effingham County1 data center project tracked
- Fayette County4 data center projects tracked
- Floyd County2 data center projects tracked
- Fulton County26 data center projects tracked
- Gwinnett County3 data center projects tracked
- Henry County2 data center projects tracked
- Irwin County1 data center project tracked
- McDuffie County1 data center project tracked
- Muscogee County1 data center project tracked
- Newton County2 data center projects tracked
- Richmond County3 data center projects tracked
- Rockdale County1 data center project tracked
- Spalding County2 data center projects tracked
- Troup County1 data center project tracked
- Walton County1 data center project tracked
Cities and towns
- Atlanta13 data center projects tracked
- Douglasville6 data center projects tracked
- Lithia Springs5 data center projects tracked
- South Fulton5 data center projects tracked
- Fayetteville4 data center projects tracked
- Union City4 data center projects tracked
- Blakely2 data center projects tracked
- Cartersville2 data center projects tracked
- Fairburn2 data center projects tracked
- Social Circle2 data center projects tracked
- Suwanee2 data center projects tracked
- Alpharetta1 data center project tracked
- Augusta-Richmond County consolidated government (balance)1 data center project tracked
- Columbus1 data center project tracked
- Conyers1 data center project tracked
- Covington1 data center project tracked
- East Point1 data center project tracked
- Forest Park1 data center project tracked
- Hampton1 data center project tracked
- Harlem1 data center project tracked
- Kingston1 data center project tracked
- LaGrange1 data center project tracked
- Lovejoy1 data center project tracked
- Norcross1 data center project tracked
- Palmetto1 data center project tracked
- Rincon1 data center project tracked
- Temple1 data center project tracked
- Villa Rica1 data center project tracked
For homeowners
What the projects here mean if you live nearby
Each fact says which way it runs: comes to the community (such as tax paid), comes from the community (such as water or a tax break), or goes both ways. The labels show direction, not whether it is good or bad. How we work
Property tax
Meta Newton Data Center (Stanton Springs):The authority holds title to the campus, so it pays no property tax; Meta pays per building instead.
Goes both waysMicrosoft FTY01 (Douglasville):The campus's actual property tax bill is unpublished; for five years its deal substituted fixed payments for normal taxation.
Not known yetGoogle Douglas County data center:Google was Douglas County's third-largest property taxpayer by assessed value in 2023, at $66.6 million.
Not known yetOpenAI Project Camellia:The county’s DRI filing estimates $20 million a year in local tax revenue from the project, and OpenAI expects to be the county’s largest taxpayer.
Comes to the community
Tax breaks
Meta Newton Data Center (Stanton Springs):Two bond deals, each $42 billion authorized in 2018 and 2021, hold the campus tax-exempt through the authority.
Goes both waysGoogle Douglas County data center:No incentive agreement naming this campus has been found in Georgia or Douglas County records.
Not known yetMicrosoft FTY01 (Douglasville):From 2020 to 2026 the campus paid fixed payments in lieu of taxes under a city bond deal, below normal property tax.
Comes to the community
Money for schools and services
Meta Newton Data Center (Stanton Springs):Newton County share of the campus payments is 37.5 percent, split with three neighboring counties.
Comes to the communityMicrosoft FTY01 (Douglasville):No community payment by Microsoft for this campus is in the records read; its incentive deal required investment, jobs, and wages.
Not known yetGoogle Douglas County data center:No community payment, fee, or benefit agreement for this campus is in the records read.
Not known yetOpenAI Project Camellia:OpenAI has committed $80 million in community benefits over the life of the project, separate from its tax payments.
Comes from the community
Electricity bill
Meta Newton Data Center (Stanton Springs):The average Walton EMC home paid $174.78 a month in 2025, up from $141.12 in 2016, not adjusted for inflation.
Not known yetMicrosoft FTY01 (Douglasville):No record read in this pass names the electric utility serving this campus, so no local rate history can be shown yet.
Not known yetGoogle Douglas County data center:Georgia Power is this campus's utility counterparty, and Google contracted 78.8 megawatts of solar energy for it in 2018.
Comes to the communityOpenAI Project Camellia:OpenAI states it will pay the full cost of the infrastructure and electric service this project needs, and Georgia PSC rules bar passing those costs to existing ratepayers.
Comes from the community
Water
Meta Newton Data Center (Stanton Springs):Meta says it pays the full cost of water and sewer service from the county water authority.
Comes from the communityMicrosoft FTY01 (Douglasville):The county water and sewer authority supplies this campus; its 2021 filing estimated demand at 1.05 million gallons a day.
Comes to the communityGoogle Douglas County data center:The campus cools with recycled water from the Douglasville-Douglas County Water and Sewer Authority; Google reported 440.6 million gallons withdrawn in 2025.
Comes to the communityOpenAI Project Camellia:The project will cool with a closed-loop system, and the county filing puts its water demand at 30,000 gallons a day.
Comes from the community
Jobs
Meta Newton Data Center (Stanton Springs):Job counts for this campus are not in our records yet.
Not known yetMicrosoft FTY01 (Douglasville):The campus's incentive deal promised twenty net new full-time jobs at a $33.65 average hourly wage by the end of 2025.
Comes from the communityGoogle Douglas County data center:Douglas County's own financial report lists Google with 350 employees in 2023, up from 300 in 2014.
Comes from the communityOpenAI Project Camellia:The county’s DRI filing estimates 400 full-time employees at build-out, and OpenAI says the project will create thousands of construction and permanent on-site jobs.
Comes from the community
Next door: height, setbacks, noise
Meta Newton Data Center (Stanton Springs):Newton County paused new data center approvals for 30 days in February 2026; the pause has expired.
Local ruleMicrosoft FTY01 (Douglasville):The site plan keeps 56 of about 160 acres open, behind city stream buffers of 50 feet plus a 25-foot setback.
Not known yetGoogle Douglas County data center:The campus's 2015 expansion went through Georgia's Developments of Regional Impact review as DRI #2508.
Not known yet
Your say
Meta Newton Data Center (Stanton Springs):County commissioners voted the 2026 pause in public; the authority board holding the campus title also meets publicly.
How to take partGoogle Douglas County data center:No vote or hearing record naming this campus has been found in published Douglas County records.
Not known yetMicrosoft FTY01 (Douglasville):The one member-level vote on record, in September 2026, ended the campus's tax deal; the 2020 approval tallies were not printed in records read.
Not known yet
Tax breaks and payments
2018 · Meta Newton Data Center (Stanton Springs)
Bond lease and payment in lieu of taxes agreement (Joint Development Authority)
The JDA issued $42 billion in bonds in 2018, holds title to the property (which makes it tax-exempt), and the company pays rent equal to the bond draws plus payments in lieu of taxes of $1 million per building per year, triggered by certificates of occupancy by December 31. Payments received: $2 million (2022), $2 million (2023), $3 million (2024), $5 million (2025), $8 million (2026); $10 million per year at buildout. Stanton Springs South shares: Newton 37.5 percent, Walton 37.5 percent, Morgan 15 percent, Jasper 10 percent.
All tax records for Meta Newton Data Center (Stanton Springs)2021 · Meta Newton Data Center (Stanton Springs)
Bond resolution, inducement, and payment in lieu of taxes agreement (Joint Development Authority)
The JDA issued $42 billion in bonds in 2021, holds fee simple title, and Baymare held the lease; payments in lieu of taxes run under the same per-building schedule as the 2018 project. The JDA's FY2023-24 budget amendment shows Baymare Project PILOT payments of $0.
All tax records for Meta Newton Data Center (Stanton Springs)Sales and use tax exemption (O.C.G.A. Section 48-8-3(68.1), administered under Ga. Comp. R. and Regs. r. 560-12-2-.117)
The purchase and use of high-technology data center equipment (computer equipment, generators, cooling, power distribution, cabling, and related materials and equipment) by a certificate holding data center owner or its contract customers is exempt from state and local sales and use tax. A data center owner holding a certificate may make exempt purchases from its exemption start date through December 31, 2031; the paragraph is repealed January 1, 2032.
2020 · Microsoft FTY01 (Douglasville)
Bond lease and payment in lieu of taxes agreement (Development Authority of the City of Douglasville; City of Douglasville Revised 2020 Tax Plan)
The Authority held title under a lease structure financed by its Series 2020 taxable industrial development revenue bond (not to exceed $400,000,000), and Microsoft paid fixed payments in lieu of taxes under Schedule 1 of the Tax Incentives Agreement instead of normal ad valorem tax: $500,000 per year in Years 1 through 5, then rising 15 percent per year to $2,022,778.87 in Year 15. Year 1 commences on the earlier of January 1 of the first calendar year after a certificate of occupancy for any portion of the project, or January 1, 2024; during the construction period the project is valued at 75 percent of fair market value for PILOT purposes. Property transferred to the Authority is capped at $400 million at original cost; anything above that pays normal ad valorem tax.
All tax records for Microsoft FTY01 (Douglasville)
Local rules for data centers
In effect · Moratorium · Adopted Oct 6, 2026
Extension of the data center application moratorium to December 16 2026
Newton County extended its moratorium on accepting any application request or submission that proposes developing a data center in the county including rezoning special use and conditional use permits development and building permits and site plans while the county finishes studying a data center ordinance.
Expired · Moratorium · Adopted Apr 7, 2026
Limited moratorium on acceptance of data center applications
The resolution continues the county's moratorium chain (the February 17, 2026 emergency moratorium ran to March 18, and a March 3 revision extended it to April 8) by barring acceptance of data center applications until October 7, 2026, while the county drafts data center standards. Resolution R-100626A later extended the moratorium to December 16, 2026.
Expired · Moratorium · Adopted Feb 17, 2026
Emergency moratorium on acceptance of data center applications
The resolution bars the county, until March 18, 2026, from accepting applications, requests, or submissions that propose data center development in whole or in part, including rezoning, special use and conditional use permits, development permits, site plans, and building permits. Its stated purpose is to give the county time to study and draft an ordinance on data center development. By its own terms it ended on the earliest of March 18, 2026, Board approval of an additional moratorium after a public hearing, or Board action ending it; no extension was found in the sources read.
In effect · Zoning · Adopted Sep 1, 2025
Data center zoning amendments adopted after the 2025 moratorium
After its 2025 moratorium Douglas County adopted zoning text amendments for data centers; under the amended code a data center over 50000 square feet requires a special use permit.
Expired · Moratorium · Adopted Mar 20, 2025
Moratorium on data center applications over 50000 square feet
Douglas County paused land use map amendments rezonings special use permits variances and public hearings for data center campuses over 50000 square feet while it studied the use; the Board extended the pause once and then replaced it with adopted zoning text amendments in September 2025.
In the news
Growth of data centers becomes a defining issue of the midterms, entangling some Georgia candidates
Georgia Recorder
Recent cases and dockets in Georgia
- Court case · PendingMorris et al. v. Meta Platforms, Inc. et al. (Stanton Springs wells)
- Utility commission · DecidedLarge Load Contract deemed filed for review under the Docket No. 44280 Large Load Contract Review Process (Joint Statement of Commission Staff and Georgia Power Company, July 27, 2026)
- Utility commission · In effectTime of Use, Revenue Neutral, Schedule TOU-RN-14
- Utility commission · DecidedGeorgia Power Company’s Applications for the Certification of Capacity from the 2029-2031 All-Source RFP (Docket 56298) and of Supplemental Resources for 2028-2031 Capacity (Docket 56310)
- Utility commission · DecidedGeorgia Power Company’s 2025 Integrated Resource Plan
- Utility commission · In effectSchedule PLL-18, Power and Light Large
- Utility commission · DecidedOrder Approving Revisions to Georgia Power Company's Rules and Regulations (large load rules)
- Utility commission · Pending before the commissionRTP Revenue Credit and Allocation Methodology
Bills and laws in Georgia
- SB 410 · Passed one chamber · Mar 6, 2026Ends new data center tax breaks, sets large load contract terms
- SB 34 · Died or failed · Feb 26, 2026Bars shifting data center power costs onto other utility customers
- HB 1387 · Died or failed · Feb 20, 2026Funds homestead exemption from property taxes collected on data centers
- SB 530 · Died or failed · Feb 19, 2026Deposits data center tax collections into a property tax relief fund
- HB 1323 · Died or failed · Feb 18, 2026Requires new data centers to operate as hybrid power facilities
- HB 1063 · Passed one chamber · Feb 17, 2026Requires utility contracts shielding other customers from data center costs
- SB 476 · Died or failed · Feb 12, 2026Ends new data center sales tax exemption certificates statewide
- HB 1059 · Died or failed · Jan 29, 2026Bans new data center permits through 2028, creates impact commission
- SB 436 · Died or failed · Jan 29, 2026Bans usage nondisclosure deals, pauses new data center tax certificates
- HB 1012 · Died or failed · Jan 28, 2026Bans new data center construction permits until March 2027
- SB 421 · Died or failed · Jan 27, 2026Bans local nondisclosure deals hiding data center power and water use
- SB 408 · Died or failed · Jan 16, 2026Moves data center tax exemption sunset from 2032 to 2027
- HB 528 · Died or failed · Feb 21, 2025Requires large facilities to disclose energy, water, and community impacts
- HB 559 · Died or failed · Feb 21, 2025Moves data center equipment tax exemption sunset to end of 2026
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
Questions people ask
- How many data centers are in Georgia?
- Data Center Fact Check tracks 82 data center projects in Georgia as of November 2026. Of those, 36 proposed, 24 operating and 14 under construction.
- What is the biggest data center in Georgia?
- By announced capacity, the biggest data center in Georgia is OpenAI Project Camellia, announced at 3,200 MW. It is in permitting.
- How much power do data centers in Georgia use?
- The 82 projects tracked in Georgia have announced about 16,183 MW of capacity in total, where a figure is published. That is announced capacity, not measured electricity use.
Sources
- 1JDA Meeting Packet, December 19, 2023
Joint Development Authority of Jasper, Morgan, Newton, and Walton CountiesTier 1 · Open the source - 2JDA Quarterly Report, Q1 2024
Joint Development Authority of Jasper, Morgan, Newton, and Walton CountiesTier 1 · Open the source - 3JDA Meeting Packet, May 27, 2025
Joint Development Authority of Jasper, Morgan, Newton, and Walton CountiesTier 1 · Open the source - 4City Council Regular Meeting agenda packet, September 8, 2026, Item 26-301 (RES-2026-37) with the Tax Incentives Agreement, RES-2020-52, and RES-2021-82 attached
City of Douglasville (CivicWeb)Tier 1 · Open the source - 5Annual Comprehensive Financial Report for the fiscal year ended December 31, 2023
Douglas County, GeorgiaTier 1 · Open the source - 6DRI #4801 Information Form Part 2: Project Camellia
Georgia Department of Community AffairsTier 1 · Open the source - 7
- 8JDA Meeting Packet, February 27, 2024
Joint Development Authority of Jasper, Morgan, Newton, and Walton CountiesTier 1 · Open the source - 9Ga. Comp. R. 560-12-2-.117, High-Technology Data Center Equipment exemption administration
Georgia Secretary of State (Rules and Regulations of the State of Georgia)Tier 1 · Open the source - 10City Council Regular Meeting minutes, September 8, 2026 (published in the September 21, 2026 agenda packet)
City of Douglasville (CivicWeb)Tier 1 · Open the source - 11EIA Form 861 2025, Sales to Ultimate Customers file
U.S. Energy Information AdministrationTier 1 · Open the source - 12EIA Form 861 2016, Sales to Ultimate Customers file
U.S. Energy Information AdministrationTier 1 · Open the source - 13
- 14Air Quality Permit No. 7376-097-0097-S-01-0: Microsoft Corporation - FTY01 Facility, Douglasville, Douglas County
Georgia Environmental Protection Division, Air Protection BranchTier 1 · Open the source - 15ARC Preliminary Report: FTY01 1601 North River Road, DRI #3426 (ARC review code R2110181)
Atlanta Regional CommissionTier 1 · Open the source - 16A new partnership to drive renewable energy growth in the U.S.
Google (The Keyword)Tier 4 · Open the source - 17Georgia Power to add 177 MW of solar resources for C&I REDI program
Georgia Power (Southern Company newsroom)Tier 4 · Open the source - 18
- 19FYE 2025 Budget and Financial Plan
Newton County Water and Sewerage AuthorityTier 1 · Open the source - 20
- 21Helping the Hooch with water conservation at our Douglas County data center
Google Green BlogTier 4 · Open the source - 22Annual Comprehensive Financial Report, fiscal years ended June 30, 2022 and 2021
Douglasville-Douglas County Water and Sewer AuthorityTier 1 · Open the source - 23Google 2025 Environmental Report (2024 data), Water use by data center location table
GoogleTier 4 · Open the source - 24
- 25Microsoft will establish its next U.S. datacenter region in Georgia's Fulton and Douglas Counties (2021-02-11)
Microsoft Azure BlogTier 4 · Open the source - 26Google Announces $300M Data Center Expansion in Georgia
Elevate Douglas Economic PartnershipTier 1 · Open the source - 27Data center proposal in Social Circle, Georgia, fails to receive recommendation from Planning Commission
Data Center DynamicsTier 3 · Open the source - 28Board of Commissioners Regular Meeting Minutes, February 17, 2026
Newton County, GeorgiaTier 1 · Open the source - 29Newton County Unified Development Ordinance, Chapter 1 Zoning Ordinance
Newton County, GeorgiaTier 1 · Open the source - 30Code of Ordinances, City of Social Circle (adopted ordinances listing)
City of Social Circle, Georgia (Municode Library)Tier 1 · Open the source - 31Developments of Regional Impact database: DRI #2508 (IDI2A) initial information form
Georgia Department of Community AffairsTier 1 · Open the source - 32Board of Commissioners regular meeting minutes 2026-10-06 (full text of Resolution R-100626A)
Newton County Board of CommissionersTier 1 · Open the source - 33Newton County Board of Commissioners regular meeting minutes, April 7, 2026
Newton County Board of CommissionersTier 1 · Open the source - 34Staff report for special use permit application S2025-13 (March 3 2026 meeting)
Douglas County GeorgiaTier 1 · Open the source - 35
- 36Board of Commissioners regular meeting minutes 2026-10-20 (UDO update ordinance O-102026 deferred)
Newton County Board of CommissionersTier 1 · Open the source - 37JDA Quarterly Report, Q2 2026
Joint Development Authority of Jasper, Morgan, Newton and Walton CountiesTier 1 · Open the source - 38Ga. Comp. R. and Regs. r. 560-12-2-.117, High-Technology Data Center Equipment
Georgia Department of RevenueTier 1 · Open the source
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "Georgia." Accessed 2026-11-29. https://datacenterfactcheck.org/places/us-ga
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page