city Card
Data centers in Atlanta, Georgia
Draft research: figures were traced to their sources by an AI research agent and have not passed verification yet.
Data Center Fact Check tracks 13 data center projects in Atlanta, Georgia as of November 2026: 11 operating, 1 under construction and 1 expanding, totaling about 345 MW announced where a figure is published.
Atlanta has 13 tracked data centers. Their announced capacity totals about 345 MW where a figure is published. Of those, 11 operating, 1 under construction and 1 expanding. Every project we track here is listed below, with the public records behind it. Every figure comes from the public record linked on this page.
Data center projects in Atlanta
- CoreSite AT1 Atlanta
OperatingAtlanta
- DataBank ATL1 Midtown Atlanta
OperatingAtlanta7 MW announced
- DataBank ATL4 South Fulton
OperatingAtlanta40 MW announced
- DataBank Atlanta West End Campus (ATL2 and ATL3)
OperatingAtlanta10 MW announced
- DataBank Lithia Springs Campus (ATL5 and ATL6)
Under constructionAtlanta120 MW announced
- Digital Realty Atlanta Connected Campus (ATL13 and ATL14)
OperatingAtlanta
- EdgeConneX Atlanta Campus (ATL01 and ATL02)
OperatingAtlanta
- Edged Atlanta Campus (Tilford Yard)
ExpandingAtlanta168 MW announced
- Equinix AT1 Atlanta
OperatingAtlanta
- Equinix AT4 Atlanta
OperatingAtlanta
- H5 Data Centers Atlanta
OperatingAtlanta
- QTS Atlanta 1
OperatingAtlanta
- QTS Atlanta 1 (Atlanta)
OperatingAtlanta
Who serves this place
- Not collected yet.
Local rules for data centers
In effect · Zoning · Adopted Sep 3, 2024
Data centers prohibited in the Beltline Overlay District and near high-capacity transit
Atlanta defined data center in its code and prohibited the use in two places: anywhere in the Beltline Overlay District and within 2640 feet of a high-capacity transit stop. The Beltline chapter also sets conditions for data centers proposed within 500 feet of the Beltline Corridor.
Court cases and commission dockets in Georgia (8)
Bills and laws in Georgia
- SB 410 · Passed one chamber · Mar 6, 2026Ends new data center tax breaks, sets large load contract terms
- SB 34 · Died or failed · Feb 26, 2026Bars shifting data center power costs onto other utility customers
- HB 1387 · Died or failed · Feb 20, 2026Funds homestead exemption from property taxes collected on data centers
- SB 530 · Died or failed · Feb 19, 2026Deposits data center tax collections into a property tax relief fund
- HB 1323 · Died or failed · Feb 18, 2026Requires new data centers to operate as hybrid power facilities
- HB 1063 · Passed one chamber · Feb 17, 2026Requires utility contracts shielding other customers from data center costs
- SB 476 · Died or failed · Feb 12, 2026Ends new data center sales tax exemption certificates statewide
- HB 1059 · Died or failed · Jan 29, 2026Bans new data center permits through 2028, creates impact commission
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
Questions people ask
- How many data centers are in Atlanta?
- Data Center Fact Check tracks 13 data center projects in Atlanta as of November 2026. Of those, 11 operating, 1 under construction and 1 expanding.
- What is the biggest data center in Atlanta?
- By announced capacity, the biggest data center in Atlanta is Edged Atlanta Campus (Tilford Yard), announced at 168 MW. It is expanding.
- How much power do data centers in Atlanta use?
- The 13 projects tracked in Atlanta have announced about 345 MW of capacity in total, where a figure is published. That is announced capacity, not measured electricity use.
Sources
- 1Atlanta City Council votes to define data centers limit locations
Atlanta City CouncilTier 1 · Open the source
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "Atlanta." Accessed 2026-11-29. https://datacenterfactcheck.org/places/us-ga-atlanta
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page