Skip to content

Project File

DataBank Atlanta West End Campus (ATL2 and ATL3)

Atlanta,Fulton County,GeorgiaOperatingLast checked Nov 9, 2026

DataBankDeveloper and operator

Saved in this browser; see it under My feed. Email alerts are not available yet.

Details confirmed

Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.

4 of 6 details confirmed

  • Confirmed: County
  • Confirmed: City or address
  • Confirmed: Stage
  • Confirmed: Capacity
  • Still to confirm: Electric utility
  • Still to confirm: First public date
Know the record? Send it to us

What happens next: No upcoming date is on record.

Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.

Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.

DataBank Atlanta West End Campus (ATL2 and ATL3) is an operating data center project in Atlanta, Fulton County, Georgia. DataBank is named as operator. It was announced at 10 MW.

DataBank Atlanta West End Campus (ATL2 and ATL3) is an operating data center project in Atlanta, Fulton County, Georgia. DataBank is named as operator. It was announced at 10 MW. 4 of the six core facts we track for every project are confirmed on this page.

Where this project sits

This project sits in Atlanta, Fulton County, Georgia. Each place page carries the projects tracked there, who provides its power and water, and its local rules.

10 MWAnnounced capacity
1Public records we have found

For homeowners

What this project means if you live nearby

We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.

Latest from the newswire

  1. What the record shows · November 28, 2026

    Loudoun County data centers: the complete record

  2. What the record shows · November 22, 2026

    SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days

  3. What the record shows · November 22, 2026

    PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

Aerial view of DataBank Atlanta West End Campus (ATL2 and ATL3) in Atlanta, Fulton County, Georgia, captured 2023
Aerial image, USDA National Agriculture Imagery Program, via the USGS National Map, Public domain (USDA NAIP), captured 2023Aerial images can be older than the campus. This one shows what was on the ground when it was taken.Source: USDA National Agriculture Imagery Program, via the USGS National MapLicense: Public domain (USDA NAIP)
Site-level positionPin placed from the position we have on file, inside Fulton County, Georgia.See every project on the map

Bills and laws in Georgia

All 14 in Bill Watch

Who's involved

Public records

1 records found so far. 8 kinds of record are still being collected.

See every record

Questions people ask

Where is DataBank Atlanta West End Campus (ATL2 and ATL3)?
DataBank Atlanta West End Campus (ATL2 and ATL3) is a data center project in Atlanta, Fulton County, Georgia.
Who operates DataBank Atlanta West End Campus (ATL2 and ATL3)?
DataBank is named as the operator of DataBank Atlanta West End Campus (ATL2 and ATL3).
How big is DataBank Atlanta West End Campus (ATL2 and ATL3)?
DataBank Atlanta West End Campus (ATL2 and ATL3) was announced at 10 MW of capacity.
What stage is DataBank Atlanta West End Campus (ATL2 and ATL3)?
DataBank Atlanta West End Campus (ATL2 and ATL3) is operating.

Sources

Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.

  1. 1
    Atlanta City Council votes to define data centers limit locations
    Atlanta City Council
    Tier 1 · Captured 2026-11-08 · Open the source
  2. 2
    Atlanta Data Centers: ATL1, ATL2, ATL3, ATL4, ATL5, ATL6
    DataBank
    Tier 4 · Captured 2026-11-09 · Open the source

No corrections have been published for this page. Corrections log · Report an error or send a tip on this page