GeorgiaGeorgia General Assembly2025-2026Bill
HB 1059: Bans new data center permits through 2028, creates impact commission
Official title: Data Center Impact Assessment and Development Moratorium Act of 2026
Draft research, not yet verified: traced to the official record by an AI research agent; an editor has not checked it yet.
Where it stands
Died or failed as of Jan 29, 2026. The official record says: House First Readers.
- Filed (done)
- In committee (not reached)
- Passed one chamber (not reached)
- Passed both chambers (not reached)
- Signed into law (not reached)
- In effect (not reached)
- Died or failed (current stage)
What it does
We have not quoted its provisions yet.
Who it touches
No project we track is matched to this bill or order: its rules do not reach them, or a check found it does not apply.
Other projects we track in Georgia (82), not affected
- 75 South Data Center CampusProposed
- Aligned ATL-01Operating
- Aligned Data Centers ATL-01 (Lithia Springs)Operating
- ATL03 (Red Oak Road)Proposed
- ATL11 (Stonewall Tell Road)Proposed
- Bridgeport (Revised) Technological FacilityProposed
- CoreSite AT1 AtlantaOperating
- DataBank ATL1 Midtown AtlantaOperating
- DataBank ATL4 South FultonOperating
- DataBank ATL5 (Atlanta)Operating
- DataBank ATL6 (Atlanta)Operating
- DataBank Atlanta West End Campus (ATL2 and ATL3)Operating
- DataBank Lithia Springs Campus (ATL5 and ATL6)Under construction
- DataBank Project IndoIn permitting
- Data Center at 0 Social Circle ParkwayProposed
- DC BLOX Atlanta East (Conyers)Under construction
- DC BLOX Atlanta West (Douglasville)Under construction
- Digital Realty ATL15 and ATL16 (Fort Gillem)Proposed
- Digital Realty Atlanta Connected Campus (ATL13 and ATL14)Operating
- EdgeConneX Atlanta Campus (ATL01 and ATL02)Operating
- Edged Atlanta Campus (Tilford Yard)Expanding
- Equinix AT1 AtlantaOperating
- Equinix AT4 AtlantaOperating
- Fairburn Technology CenterProposed
- Flexential Atlanta - AlpharettaOperating
- Flexential Atlanta-Douglasville CampusOperating
- Flexential Atlanta - NorcrossOperating
- Google Columbia County Data Center (White Oak Technology Park)Approved
- Google Douglas County data centerOperating
- Google LaGrange Data CenterUnder construction
- Gregory Road Data CenterProposed
- H5 Data Centers AtlantaOperating
- Hampton Technology ParkProposed
- Highway 16 Interstate Health DevelopmentProposed
- Kingston Technology HubProposed
- Meta Newton Data Center (Stanton Springs)Operating
- Microsoft ATL06 (East Point)Under construction
- Microsoft ATL50Proposed
- Microsoft ATL80Proposed
- Microsoft CCO06 (Palmetto)Under construction
- Microsoft FTY01 (Douglasville)Under construction
- Nixon Technology CenterProposed
- OpenAI Project CamelliaIn permitting
- Project ArrowheadProposed
- Project AvemoreProposed
- Project AzeleaProposed
- Project Bunkhouse (Digital Realty Stilesboro Campus)Under construction
- Project BusCancelled
- Project GracieIn permitting
- Project RubyProposed
- Project SailProposed
- Project Squash (Pumpkin Center)Under construction
- QTS ATL2 EastProposed
- QTS Atlanta 1Operating
- QTS Atlanta 1 (Atlanta)Operating
- QTS Augusta (Augusta; listed as in development)Proposed
- QTS Augusta CampusProposed
- QTS Blakely (Blakely; listed as in development)Proposed
- QTS Blakely CampusIn permitting
- QTS Fayetteville CampusUnder construction
- QTS Fayetteville (Fayetteville; listed as in development)Proposed
- QTS Suwanee 1Operating
- QTS Suwanee 1 (Suwanee)Operating
- Rock House Road Data Center SiteProposed
- Southeast Data Center Campus (Fayetteville)Proposed
- STACK ATL02 Lithia SpringsUnder construction
- Stillwater Technology ParkCancelled
- Stonewall Tell Data CenterProposed
- Stream Data Center (Douglas County)Proposed
- Stream Data Centers AtlantaProposed
- Strickland Tract Data CenterProposed
- Switch KEEP 2.0 Atlanta NorthUnder construction
- Switch Switch ATLANTA (Atlanta)Operating
- Switch The KeepOperating
- T5@Atlanta IIIUnder construction
- T5 ATL IV (Coweta County)Proposed
- T5 ATL IV (Fairburn)Proposed
- The Crossings (Union City)Proposed
- Vantage Data Center DouglasvilleUnder construction
- Vantage Data Center Stacks RoadProposed
- Vantage Data Center WestlakeProposed
- Wallace Jackson Data Center CampusProposed
Who acted
- CosponsorDavisHouse, district 87th
- CosponsorMitchellHouse, district 88th
- CosponsorSchofieldHouse, district 63rd
- CosponsorScottHouse, district 76th
- Primary sponsorJacksonHouse, district 68th
More from Georgia
- HB 1323 · Died or failedRequires new data centers to operate as hybrid power facilities
- HB 1063 · Passed one chamberRequires utility contracts shielding other customers from data center costs
- SB 476 · Died or failedEnds new data center sales tax exemption certificates statewide
- SB 436 · Died or failedBans usage nondisclosure deals, pauses new data center tax certificates
- HB 1012 · Died or failedBans new data center construction permits until March 2027
- SB 421 · Died or failedBans local nondisclosure deals hiding data center power and water use
Sources
- 1First Readers in House, Ninth Legislative Day, January 29, 2026
Georgia General AssemblyTier 1 · Open the source
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "HB 1059: Bans new data center permits through 2028, creates impact commission." Bill Watch. Updated 2026-11-12. Accessed 2026-11-29. https://datacenterfactcheck.org/policy/bills/ga-2025-26-hb-1059
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page