Project File
Microsoft FTY01 (Douglasville)
Douglasville,Douglas County,GeorgiaUnder constructionFirst public 2021Filing entity: Microsoft CorporationLast checked Nov 9, 2026
MicrosoftDeveloper and operator
Details confirmed
Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.
5 of 6 details confirmed
- Confirmed: County
- Confirmed: City or address
- Confirmed: Stage
- Confirmed: Capacity
- Confirmed: First public date
- Still to confirm: Electric utility
What happens next: No upcoming date is on record.
Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.
Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.
Microsoft FTY01 (Douglasville) is a under-construction data center project in Douglasville, Douglas County, Georgia. Microsoft is named as operator. It was first public in 2021. No site capacity figure is published for this project.
Microsoft FTY01 (Douglasville) is an under-construction data center project in Douglasville, Douglas County, Georgia. Microsoft is named as operator. No site capacity figure is published for this project. 5 of the six core facts we track for every project are confirmed on this page.
Where this project sits
This project sits in Douglasville, Douglas County, Georgia. Each place page carries the projects tracked there, who provides its power and water, and its local rules.
For homeowners
What this project means if you live nearby
Each fact says which way it runs: comes to the community (such as tax paid), comes from the community (such as water or a tax break), or goes both ways. The labels show direction, not whether it is good or bad. How we work
- Property tax
The campus's actual property tax bill is unpublished; for five years its deal substituted fixed payments for normal taxation.
Not known yet - Tax breaks
From 2020 to 2026 the campus paid fixed payments in lieu of taxes under a city bond deal, below normal property tax.
Comes to the community - Money for schools and services
No community payment by Microsoft for this campus is in the records read; its incentive deal required investment, jobs, and wages.
Not known yet - Electricity bill
No record read in this pass names the electric utility serving this campus, so no local rate history can be shown yet.
Not known yet - Water
The county water and sewer authority supplies this campus; its 2021 filing estimated demand at 1.05 million gallons a day.
Comes to the community - Jobs
The campus's incentive deal promised twenty net new full-time jobs at a $33.65 average hourly wage by the end of 2025.
Comes from the community - Next door: height, setbacks, noise
The site plan keeps 56 of about 160 acres open, behind city stream buffers of 50 feet plus a 25-foot setback.
Not known yet - Your say
The one member-level vote on record, in September 2026, ended the campus's tax deal; the 2020 approval tallies were not printed in records read.
Not known yet
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
The land, to scale
Timeline
- · DecisionCity of Douglasville: Adopted as part of the consent agenda: AYES Caldwell, Davis, Hudson, Mayor Pro Tem T. Miller, and Watts; ABSENT Estes and N. Miller for Microsoft FTY01 (Douglasville)RES-2026-37 (Item 26-301), consent agenda item 7.A
- · FilingFiled with City of Douglasville for Microsoft FTY01 (Douglasville)RES-2026-37 (Item 26-301), consent agenda item 7.A
- · DecisionGeorgia Environmental Protection Division, Air Protection Branch: Narrative (May 21, 2024) recommends issuing Permit No. 7376-097-0097-S-01-1 for 21 additional emergency generators at Building 2 (GN22-GN42); the 30-day public review ended June 21, 2024 with no comments. Issuance of the -01-1 perm...Application No. 29231
- · FilingFiled with Georgia Environmental Protection Division, Air Protection Branch for Microsoft FTY01 (Douglasville)Application No. 29231
- · DecisionGeorgia Environmental Protection Division, Air Protection Branch: Issued October 13, 2022 (issuance date per the EPD narrative for Application No. 29231; the posted permit copy leaves its issuance-date field blank) (air permit) for Microsoft FTY01 (Douglasville)Permit No. 7376-097-0097-S-01-0 (Application No. 28295; AIRS No. 04-13-097-00097)
- · FilingFiled with Georgia Environmental Protection Division, Air Protection Branch: air permit for Microsoft FTY01 (Douglasville)Permit No. 7376-097-0097-S-01-0 (Application No. 28295; AIRS No. 04-13-097-00097)
- · DecisionAtlanta Regional Commission (review); Georgia Department of Community Affairs (DRI program): Preliminary regional review completed; submitting local government is the City of Douglasville; DRI trigger is a land disturbance permit for Microsoft FTY01 (Douglasville)DRI #3426; ARC review code R2110181
- · FilingFiled with Atlanta Regional Commission (review); Georgia Department of Community Affairs (DRI program) for Microsoft FTY01 (Douglasville)DRI #3426; ARC review code R2110181
Laws and bills that may apply here
Found by each bill's own place and size rules. Each one says who has checked it so far.
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Georgia HB 1063: Requires utility contracts shielding other customers from data center costs
The act covers data centers with a peak annual electricity demand of 100 megawatts or greater, under agreements with an electric utility entered into on or after the effective date of the act; this project has 60.5 MW on record (generator capacity), but the project's peak annual electricity demand and the date of its electric service agreement is not on record.
“As used in this part, the term 'data center' means a facility, campus of facilities, or array of interconnected facilities used by an entity or other business enterprise to operate, manage, or maintain a computer, group of computers, or other organized assembly of hardware and software for the primary purpose of processing, storing, retrieving, or transmitting data and that have a peak annual electricity demand of 100 megawatts or greater.” (Section 1, new Code Section 46-3-80)
Rule checks: Project is in Georgia. Still to check: size: unknown, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Georgia SB 410: Ends new data center tax breaks, sets large load contract terms
The act covers large load customers with an expected total peak demand of 100 megawatts or greater at premises on one tract or contiguous tracts of land, under contracts entered into on or after the effective date of the act; this project has 60.5 MW on record (generator capacity), but the project's expected total peak demand and the date of its electric service contract is not on record.
“As used in this Code section, the term 'large load customer' means customers with an expected total peak demand of 100 megawatts or greater at one or more premises located on one tract or contiguous tracts of land.” (Part I, Section 1-2, new Code Section 46-2-25.4(a))
Rule checks: Project is in Georgia. Still to check: size: unknown, who it covers: not checked
Bills and laws in Georgia
- SB 410 · Passed one chamber · Mar 6, 2026Ends new data center tax breaks, sets large load contract terms
- SB 34 · Died or failed · Feb 26, 2026Bars shifting data center power costs onto other utility customers
- HB 1387 · Died or failed · Feb 20, 2026Funds homestead exemption from property taxes collected on data centers
- SB 530 · Died or failed · Feb 19, 2026Deposits data center tax collections into a property tax relief fund
- HB 1323 · Died or failed · Feb 18, 2026Requires new data centers to operate as hybrid power facilities
- HB 1063 · Passed one chamber · Feb 17, 2026Requires utility contracts shielding other customers from data center costs
Who's involved
- Developer and operatorMicrosoft
Power
Capacity, as announced or filed
- 60.5 MW · FTY01 facility generator fleet (Douglasville, Douglas County)Feb 2022 · generator_capacity
- 60.5 MW · Building 1 generator fleet, Permit No. 7376-097-0097-S-01-0Oct 2022 · generator_capacity
From the filings
Numbers stated in permits, agreements, and decisions, as printed. Each links to the filing.
Development Authority of the City of Douglasville; City of Douglasville, Tax Incentives Agreement dated December 21, 2020 (Series 2020 Bond); RES-2020-46 (2020-11-16); RES-2020-52 (2020-12-07); first amendment RES-2021-82 (2021-11-15)
- Stated in the filing
- $400 million
- Stated in the filing
- 20 net new full-time jobs
- Stated in the filing
- $34 per hour (minimum average hourly wage, excluding benefits)
Georgia Environmental Protection Division, Air Protection Branch, Application No. 29231
- Stated in the filing
- 21 generators proposed at Building 2 (GN22-GN42: twenty 3,000 kW and one 500 kW), installation and construction 2025
- Stated in the filing
- 99 tons per year sitewide NOx limit (synthetic minor)
- Stated in the filing
- 2023-01 Building 1 generator installation date (construction August 2022) per EPD equipment list
- Stated in the filing
- 42 generators facility-wide if Permit -01-1 issues as recommended (GN1-GN42)
- Stated in the filing
- 2022-10-13 date Permit No. 7376-097-0097-S-01-0 was issued (per EPD narrative)
Atlanta Regional Commission (review); Georgia Department of Community Affairs (DRI program), DRI #3426; ARC review code R2110181
- Stated in the filing
- $14.1 million estimated annual property tax, stated as to be made in PILOT payment
- Stated in the filing
- 159.5 acres (site area as computed on the DRI form: 67.94 impervious acres of 159.50 acres)
- Water flow
- 1,050,000 gallons per day (estimated water supply demand, 1.05 MGD)
- Stated in the filing
- 980,000 sq ft
- Stated in the filing
- 0.266 MGD (estimated sewage flow)
- Stated in the filing
- $125 million estimated value at build-out, as stated
- Stated in the filing
- 4 buildings
Georgia Environmental Protection Division, Air Protection Branch, Permit No. 7376-097-0097-S-01-0 (Application No. 28295; AIRS No. 04-13-097-00097)
- Generator capacityEstimated
- 60.5 MWSee the project_capacity row cap-microsoft-fty01-generator-fleet-b1 for the ruling basis.
- Stated in the filing
- 21 generators
- Stated in the filing
- 500 hours per year per generator (total annual operation must be less than 500)
Public records
9 records found so far. 5 kinds of record are still being collected.
See every recordQuestions people ask
- Where is Microsoft FTY01 (Douglasville)?
- Microsoft FTY01 (Douglasville) is a data center project in Douglasville, Douglas County, Georgia.
- Who operates Microsoft FTY01 (Douglasville)?
- Microsoft is named as the operator of Microsoft FTY01 (Douglasville).
- How big is Microsoft FTY01 (Douglasville)?
- The site covers 160 acres.
- What stage is Microsoft FTY01 (Douglasville)?
- Microsoft FTY01 (Douglasville) is under construction. It was first public in 2021.
Sources
Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.
- 1City Council Regular Meeting agenda packet, September 8, 2026, Item 26-301 (RES-2026-37) with the Tax Incentives Agreement, RES-2020-52, and RES-2021-82 attached
City of Douglasville (CivicWeb)Tier 1 · Captured 2026-11-09 · Open the source - 2SIP Application Review Narrative, Application No. 29231: Microsoft Corporation - FTY01 Facility (Jada Levers, May 21, 2024, with addendum)
Georgia Environmental Protection Division, Air Protection BranchTier 1 · Captured 2026-11-09 · Open the source - 3ARC Preliminary Report: FTY01 1601 North River Road, DRI #3426 (ARC review code R2110181)
Atlanta Regional CommissionTier 1 · Captured 2026-11-09 · Open the source - 4Microsoft aiming to build 1 million sq ft data center in Douglasville, GA (FTY101 DRI, 2021-08-19)
Elevate Douglas Economic PartnershipTier 1 · Captured 2026-11-08 · Open the source - 5Air Quality Permit No. 7376-097-0097-S-01-0: Microsoft Corporation - FTY01 Facility, Douglasville, Douglas County
Georgia Environmental Protection Division, Air Protection BranchTier 1 · Captured 2026-11-08 · Open the source - 6City Council Regular Meeting minutes, September 8, 2026 (published in the September 21, 2026 agenda packet)
City of Douglasville (CivicWeb)Tier 1 · Captured 2026-11-09 · Open the source - 7Staff report for special use permit application S2025-13 (March 3 2026 meeting)
Douglas County GeorgiaTier 1 · Captured 2026-11-08 · Open the source - 8Board of Commissioners minutes June 17 2025
Douglas County GeorgiaTier 1 · Captured 2026-11-08 · Open the source - 9Microsoft will establish its next U.S. datacenter region in Georgia's Fulton and Douglas Counties (2021-02-11)
Microsoft Azure BlogTier 4 · Captured 2026-11-08 · Open the source
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page