Project File · Public records
Every public record we have for Microsoft FTY01 (Douglasville)
Douglasville, Douglas County, GeorgiaUnder constructionFirst public 2021Filing entity: Microsoft CorporationLast checked Nov 9, 2026
Records marked draft were traced to their source by an AI research agent and have not passed verification yet.
What the public record holds
1 of 9 records · showing environmental permits only ·
2022
Air permitIssuedOct 13, 2022Georgia Environmental Protection Division, Air Protection Branch
Georgia Environmental Protection Division, Air Protection Branch, Permit No. 7376-097-0097-S-01-0 (Application No. 28295; AIRS No. 04-13-097-00097)
Issued October 13, 2022 (issuance date per the EPD narrative for Application No. 29231; the posted permit copy leaves its issuance-date field blank)
- Generator capacity:
- 60.5 MW
- Emergency generators:
- 21 generators
- Operating hours cap:
- 500 hours per year per generator (total annual operation must be less than 500)
Draft research, not yet verifiedLast checked Nov 9, 2026Where it says this
Permit cover page: installation and operation of twenty 3,000 kW emergency generators and one 500 kW emergency generator at 1601 North River Road, Douglasville, GA 30122
Records we are still collecting
These records are normally public. We have not collected them for this project yet; each will appear above with its source when found.
- Building and site permits
Building permits, site plans, grading, certificates of occupancy. Usually held by: City or county building department.
- Water supply and use
Water service agreements, water rights, use reports. Usually held by: Water utility and state water agency.
- Power and utility
Interconnection, large load rate classes, utility agreements, commission dockets. Usually held by: Electric utility and utility commission.
- Courts and disputes
Lawsuits, appeals, settlements. Usually held by: State and federal courts.
- Company filings
Business registrations of filing entities, securities filings. Usually held by: Secretary of state business registry; SEC.
Sources
- 1City Council Regular Meeting agenda packet, September 8, 2026, Item 26-301 (RES-2026-37) with the Tax Incentives Agreement, RES-2020-52, and RES-2021-82 attached
City of Douglasville (CivicWeb)Tier 1 · Captured 2026-11-09 · Open the source - 2SIP Application Review Narrative, Application No. 29231: Microsoft Corporation - FTY01 Facility (Jada Levers, May 21, 2024, with addendum)
Georgia Environmental Protection Division, Air Protection BranchTier 1 · Captured 2026-11-09 · Open the source - 3ARC Preliminary Report: FTY01 1601 North River Road, DRI #3426 (ARC review code R2110181)
Atlanta Regional CommissionTier 1 · Captured 2026-11-09 · Open the source - 4Microsoft aiming to build 1 million sq ft data center in Douglasville, GA (FTY101 DRI, 2021-08-19)
Elevate Douglas Economic PartnershipTier 1 · Captured 2026-11-08 · Open the source - 5Air Quality Permit No. 7376-097-0097-S-01-0: Microsoft Corporation - FTY01 Facility, Douglasville, Douglas County
Georgia Environmental Protection Division, Air Protection BranchTier 1 · Captured 2026-11-08 · Open the source - 6City Council Regular Meeting minutes, September 8, 2026 (published in the September 21, 2026 agenda packet)
City of Douglasville (CivicWeb)Tier 1 · Captured 2026-11-09 · Open the source - 7Staff report for special use permit application S2025-13 (March 3 2026 meeting)
Douglas County GeorgiaTier 1 · Captured 2026-11-08 · Open the source - 8Board of Commissioners minutes June 17 2025
Douglas County GeorgiaTier 1 · Captured 2026-11-08 · Open the source - 9Microsoft will establish its next U.S. datacenter region in Georgia's Fulton and Douglas Counties (2021-02-11)
Microsoft Azure BlogTier 4 · Captured 2026-11-08 · Open the source
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page