Every public record we have for Microsoft FTY01 (Douglasville)

Douglasville, Douglas County, GeorgiaUnder constructionFirst public 2021Filing entity: Microsoft CorporationLast checked Nov 9, 2026

Download CSV

Records marked draft were traced to their source by an AI research agent and have not passed verification yet.

What the public record holds

4 of 9 records · showing votes and minutes only ·

2026

  • Public decisionApprovedSep 8, 2026City of Douglasville

    City of Douglasville, RES-2026-37 (Item 26-301), consent agenda item 7.A

    Adopted as part of the consent agenda: AYES Caldwell, Davis, Hudson, Mayor Pro Tem T. Miller, and Watts; ABSENT Estes and N. Miller

    Draft research, not yet verifiedLast checked Nov 9, 2026
    Where it says this

    Minutes of September 8, 2026, item 7: consent agenda motion by Councilmember Davis, seconded by Councilmember Caldwell, RESULT: ADOPTED; item 7.A is RES-2026-37

  • Recorded voteSep 8, 2026Douglasville City Council

    Adopt RES-2026-37 approving the execution and delivery of a Cancellation of Bond and Termination of Bond Documents with Microsoft Corporation and the Development Authority of the City of Douglasville, Georgia, and terminating the Tax Incentives Agreement dated December 21, 2020, related to the Microsoft Corporation Project (consent agenda item 7.A, Item 26-301)

    5 yes, 2 absent. Chris Watts (Councilmember): yes; Devetrion Caldwell (Councilmember): yes; Elena Hudson (Councilmember): yes; Howard Estes (Councilmember): absent; Nycole Miller (Councilmember): absent; Samuel Davis (Councilmember): yes; Terry Miller (Councilmember (Mayor Pro Tem)): yes.

    Draft research, not yet verifiedLast checked Nov 9, 2026
    Where it says this

    Minutes of September 8, 2026, item 7 (Consent Agenda): motion by Councilmember Davis, seconded by Councilmember Caldwell, RESULT: ADOPTED; AYES and ABSENT printed by name

2024

  • Public decisionUnder reviewMay 21, 2024Georgia Environmental Protection Division, Air Protection Branch

    Georgia Environmental Protection Division, Air Protection Branch, Application No. 29231

    Narrative (May 21, 2024) recommends issuing Permit No. 7376-097-0097-S-01-1 for 21 additional emergency generators at Building 2 (GN22-GN42); the 30-day public review ended June 21, 2024 with no comments. Issuance of the -01-1 permit was not verified in this pass.

    Phase 2 emergency generators proposed:
    21 generators proposed at Building 2 (GN22-GN42: twenty 3,000 kW and one 500 kW), installation and construction 2025
    Stated in the filing:
    99 tons per year sitewide NOx limit (synthetic minor)
    Stated in the filing:
    2023-01 Building 1 generator installation date (construction August 2022) per EPD equipment list
    Emergency generators proposed total:
    42 generators facility-wide if Permit -01-1 issues as recommended (GN1-GN42)
    Stated in the filing:
    2022-10-13 date Permit No. 7376-097-0097-S-01-0 was issued (per EPD narrative)
    Draft research, not yet verifiedLast checked Nov 9, 2026
    Where it says this

    Background Information and Updated Equipment List (Table 1): Building 1 GN1-GN21 installed January 2023, construction August 2022; Building 2 GN22-GN42 installation and construction 2025

2021

  • Public decisionFiledOct 18, 2021Atlanta Regional Commission (review); Georgia Department of Community Affairs (DRI program)

    Atlanta Regional Commission (review); Georgia Department of Community Affairs (DRI program), DRI #3426; ARC review code R2110181

    Preliminary regional review completed; submitting local government is the City of Douglasville; DRI trigger is a land disturbance permit

    Stated in the filing:
    $14.1 million estimated annual property tax, stated as to be made in PILOT payment
    Acres:
    159.5 acres (site area as computed on the DRI form: 67.94 impervious acres of 159.50 acres)
    Water flow:
    1,050,000 gallons per day (estimated water supply demand, 1.05 MGD)
    Building gross area:
    980,000 sq ft
    Stated in the filing:
    0.266 MGD (estimated sewage flow)
    Stated in the filing:
    $125 million estimated value at build-out, as stated
    Data center buildings planned:
    4 buildings
    Draft research, not yet verifiedLast checked Nov 9, 2026
    Where it says this

    Description and DRI Additional Information Form: 980,000 sq ft of data center warehouse across 4 buildings on a 160-acre parcel at 1601 North River Road; developer/applicant and property owner Microsoft Corporation

Records we are still collecting

These records are normally public. We have not collected them for this project yet; each will appear above with its source when found.

  • Building and site permits

    Building permits, site plans, grading, certificates of occupancy. Usually held by: City or county building department.

  • Water supply and use

    Water service agreements, water rights, use reports. Usually held by: Water utility and state water agency.

  • Power and utility

    Interconnection, large load rate classes, utility agreements, commission dockets. Usually held by: Electric utility and utility commission.

  • Courts and disputes

    Lawsuits, appeals, settlements. Usually held by: State and federal courts.

  • Company filings

    Business registrations of filing entities, securities filings. Usually held by: Secretary of state business registry; SEC.

Sources

  1. 1
    City Council Regular Meeting agenda packet, September 8, 2026, Item 26-301 (RES-2026-37) with the Tax Incentives Agreement, RES-2020-52, and RES-2021-82 attached
    City of Douglasville (CivicWeb)
    Tier 1 · Captured 2026-11-09 · Open the source
  2. 2
    SIP Application Review Narrative, Application No. 29231: Microsoft Corporation - FTY01 Facility (Jada Levers, May 21, 2024, with addendum)
    Georgia Environmental Protection Division, Air Protection Branch
    Tier 1 · Captured 2026-11-09 · Open the source
  3. 3
    ARC Preliminary Report: FTY01 1601 North River Road, DRI #3426 (ARC review code R2110181)
    Atlanta Regional Commission
    Tier 1 · Captured 2026-11-09 · Open the source
  4. 4
    Microsoft aiming to build 1 million sq ft data center in Douglasville, GA (FTY101 DRI, 2021-08-19)
    Elevate Douglas Economic Partnership
    Tier 1 · Captured 2026-11-08 · Open the source
  5. 5
    Air Quality Permit No. 7376-097-0097-S-01-0: Microsoft Corporation - FTY01 Facility, Douglasville, Douglas County
    Georgia Environmental Protection Division, Air Protection Branch
    Tier 1 · Captured 2026-11-08 · Open the source
  6. 6
    City Council Regular Meeting minutes, September 8, 2026 (published in the September 21, 2026 agenda packet)
    City of Douglasville (CivicWeb)
    Tier 1 · Captured 2026-11-09 · Open the source
  7. 7
    Staff report for special use permit application S2025-13 (March 3 2026 meeting)
    Douglas County Georgia
    Tier 1 · Captured 2026-11-08 · Open the source
  8. 8
    Board of Commissioners minutes June 17 2025
    Douglas County Georgia
    Tier 1 · Captured 2026-11-08 · Open the source
  9. 9
    Microsoft will establish its next U.S. datacenter region in Georgia's Fulton and Douglas Counties (2021-02-11)
    Microsoft Azure Blog
    Tier 4 · Captured 2026-11-08 · Open the source

No corrections have been published for this page. Corrections log · Report an error or send a tip on this page