4 of 9 records · showing votes and minutes only ·
2026
Public decisionApprovedSep 8, 2026City of Douglasville
City of Douglasville, RES-2026-37 (Item 26-301), consent agenda item 7.A
Adopted as part of the consent agenda: AYES Caldwell, Davis, Hudson, Mayor Pro Tem T. Miller, and Watts; ABSENT Estes and N. Miller
Draft research, not yet verifiedLast checked Nov 9, 2026Where it says this
Minutes of September 8, 2026, item 7: consent agenda motion by Councilmember Davis, seconded by Councilmember Caldwell, RESULT: ADOPTED; item 7.A is RES-2026-37
Recorded voteSep 8, 2026Douglasville City Council
Adopt RES-2026-37 approving the execution and delivery of a Cancellation of Bond and Termination of Bond Documents with Microsoft Corporation and the Development Authority of the City of Douglasville, Georgia, and terminating the Tax Incentives Agreement dated December 21, 2020, related to the Microsoft Corporation Project (consent agenda item 7.A, Item 26-301)
5 yes, 2 absent. Chris Watts (Councilmember): yes; Devetrion Caldwell (Councilmember): yes; Elena Hudson (Councilmember): yes; Howard Estes (Councilmember): absent; Nycole Miller (Councilmember): absent; Samuel Davis (Councilmember): yes; Terry Miller (Councilmember (Mayor Pro Tem)): yes.
Draft research, not yet verifiedLast checked Nov 9, 2026Where it says this
Minutes of September 8, 2026, item 7 (Consent Agenda): motion by Councilmember Davis, seconded by Councilmember Caldwell, RESULT: ADOPTED; AYES and ABSENT printed by name
2024
Public decisionUnder reviewMay 21, 2024Georgia Environmental Protection Division, Air Protection Branch
Georgia Environmental Protection Division, Air Protection Branch, Application No. 29231
Narrative (May 21, 2024) recommends issuing Permit No. 7376-097-0097-S-01-1 for 21 additional emergency generators at Building 2 (GN22-GN42); the 30-day public review ended June 21, 2024 with no comments. Issuance of the -01-1 permit was not verified in this pass.
- Phase 2 emergency generators proposed:
- 21 generators proposed at Building 2 (GN22-GN42: twenty 3,000 kW and one 500 kW), installation and construction 2025
- Stated in the filing:
- 99 tons per year sitewide NOx limit (synthetic minor)
- Stated in the filing:
- 2023-01 Building 1 generator installation date (construction August 2022) per EPD equipment list
- Emergency generators proposed total:
- 42 generators facility-wide if Permit -01-1 issues as recommended (GN1-GN42)
- Stated in the filing:
- 2022-10-13 date Permit No. 7376-097-0097-S-01-0 was issued (per EPD narrative)
Draft research, not yet verifiedLast checked Nov 9, 2026Where it says this
Background Information and Updated Equipment List (Table 1): Building 1 GN1-GN21 installed January 2023, construction August 2022; Building 2 GN22-GN42 installation and construction 2025
2021
Public decisionFiledOct 18, 2021Atlanta Regional Commission (review); Georgia Department of Community Affairs (DRI program)
Atlanta Regional Commission (review); Georgia Department of Community Affairs (DRI program), DRI #3426; ARC review code R2110181
Preliminary regional review completed; submitting local government is the City of Douglasville; DRI trigger is a land disturbance permit
- Stated in the filing:
- $14.1 million estimated annual property tax, stated as to be made in PILOT payment
- Acres:
- 159.5 acres (site area as computed on the DRI form: 67.94 impervious acres of 159.50 acres)
- Water flow:
- 1,050,000 gallons per day (estimated water supply demand, 1.05 MGD)
- Building gross area:
- 980,000 sq ft
- Stated in the filing:
- 0.266 MGD (estimated sewage flow)
- Stated in the filing:
- $125 million estimated value at build-out, as stated
- Data center buildings planned:
- 4 buildings
Draft research, not yet verifiedLast checked Nov 9, 2026Where it says this
Description and DRI Additional Information Form: 980,000 sq ft of data center warehouse across 4 buildings on a 160-acre parcel at 1601 North River Road; developer/applicant and property owner Microsoft Corporation
Records we are still collecting
These records are normally public. We have not collected them for this project yet; each will appear above with its source when found.
- Building and site permits
Building permits, site plans, grading, certificates of occupancy. Usually held by: City or county building department.
- Water supply and use
Water service agreements, water rights, use reports. Usually held by: Water utility and state water agency.
- Power and utility
Interconnection, large load rate classes, utility agreements, commission dockets. Usually held by: Electric utility and utility commission.
- Courts and disputes
Lawsuits, appeals, settlements. Usually held by: State and federal courts.
- Company filings
Business registrations of filing entities, securities filings. Usually held by: Secretary of state business registry; SEC.
Sources
- 1City Council Regular Meeting agenda packet, September 8, 2026, Item 26-301 (RES-2026-37) with the Tax Incentives Agreement, RES-2020-52, and RES-2021-82 attached
City of Douglasville (CivicWeb)Tier 1 · Captured 2026-11-09 · Open the source - 2SIP Application Review Narrative, Application No. 29231: Microsoft Corporation - FTY01 Facility (Jada Levers, May 21, 2024, with addendum)
Georgia Environmental Protection Division, Air Protection BranchTier 1 · Captured 2026-11-09 · Open the source - 3ARC Preliminary Report: FTY01 1601 North River Road, DRI #3426 (ARC review code R2110181)
Atlanta Regional CommissionTier 1 · Captured 2026-11-09 · Open the source - 4Microsoft aiming to build 1 million sq ft data center in Douglasville, GA (FTY101 DRI, 2021-08-19)
Elevate Douglas Economic PartnershipTier 1 · Captured 2026-11-08 · Open the source - 5Air Quality Permit No. 7376-097-0097-S-01-0: Microsoft Corporation - FTY01 Facility, Douglasville, Douglas County
Georgia Environmental Protection Division, Air Protection BranchTier 1 · Captured 2026-11-08 · Open the source - 6City Council Regular Meeting minutes, September 8, 2026 (published in the September 21, 2026 agenda packet)
City of Douglasville (CivicWeb)Tier 1 · Captured 2026-11-09 · Open the source - 7Staff report for special use permit application S2025-13 (March 3 2026 meeting)
Douglas County GeorgiaTier 1 · Captured 2026-11-08 · Open the source - 8Board of Commissioners minutes June 17 2025
Douglas County GeorgiaTier 1 · Captured 2026-11-08 · Open the source - 9Microsoft will establish its next U.S. datacenter region in Georgia's Fulton and Douglas Counties (2021-02-11)
Microsoft Azure BlogTier 4 · Captured 2026-11-08 · Open the source