Flexential Atlanta-Douglasville Campus

Douglasville,Douglas County,GeorgiaOperatingLast checked Nov 8, 2026

FlexentialDeveloper and operator

Saved in this browser; see it under My feed. Email alerts are not available yet.

Details confirmed

Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.

4 of 6 details confirmed

  • Confirmed: County
  • Confirmed: City or address
  • Confirmed: Stage
  • Confirmed: Capacity
  • Still to confirm: Electric utility
  • Still to confirm: First public date
Know the record? Send it to us

What happens next: No upcoming date is on record.

Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.

Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.

Flexential Atlanta-Douglasville Campus is an operating data center project in Douglasville, Douglas County, Georgia. Flexential is named as operator. It was announced at 22.5 MW.

Flexential Atlanta-Douglasville Campus is an operating data center project in Douglasville, Douglas County, Georgia. Flexential is named as operator. It was announced at 22.5 MW. 4 of the six core facts we track for every project are confirmed on this page.

Where this project sits

This project sits in Douglasville, Douglas County, Georgia. Each place page carries the projects tracked there, who provides its power and water, and its local rules.

23 MWAnnounced capacity
3Public records we have found

For homeowners

What this project means if you live nearby

We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.

Latest from the newswire

  1. What the record shows · November 28, 2026

    Loudoun County data centers: the complete record

  2. What the record shows · November 22, 2026

    SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days

  3. What the record shows · November 22, 2026

    PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

Aerial view of Flexential Atlanta-Douglasville Campus in Douglasville, Douglas County, Georgia, captured 2023
Aerial image, USDA National Agriculture Imagery Program, via the USGS National Map, Public domain (USDA NAIP), captured 2023Aerial images can be older than the campus. This one shows what was on the ground when it was taken.Source: USDA National Agriculture Imagery Program, via the USGS National MapLicense: Public domain (USDA NAIP)
Site-level positionPin placed from the position we have on file, inside Douglas County, Georgia.See every project on the map

Bills and laws in Georgia

All 14 in Bill Watch

Who's involved

Public records

3 records found so far. 7 kinds of record are still being collected.

See every record

Questions people ask

Where is Flexential Atlanta-Douglasville Campus?
Flexential Atlanta-Douglasville Campus is a data center project in Douglasville, Douglas County, Georgia.
Who operates Flexential Atlanta-Douglasville Campus?
Flexential is named as the operator of Flexential Atlanta-Douglasville Campus.
How big is Flexential Atlanta-Douglasville Campus?
Flexential Atlanta-Douglasville Campus was announced at 22.5 MW of capacity.
What stage is Flexential Atlanta-Douglasville Campus?
Flexential Atlanta-Douglasville Campus is operating.

Sources

Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.

  1. 1
    Staff report for special use permit application S2025-13 (March 3 2026 meeting)
    Douglas County Georgia
    Tier 1 · Captured 2026-11-08 · Open the source
  2. 2
    Board of Commissioners minutes June 17 2025
    Douglas County Georgia
    Tier 1 · Captured 2026-11-08 · Open the source
  3. 3
    City Council Regular Meeting minutes, September 8, 2026 (published in the September 21, 2026 agenda packet)
    City of Douglasville (CivicWeb)
    Tier 1 · Captured 2026-11-09 · Open the source
  4. 4
    Atlanta - Douglasville 1 Data Center
    Flexential
    Tier 4 · Captured 2026-11-08 · Open the source
  5. 5
    U.S. Census Geocoder (batch geographies endpoint)
    U.S. Census Bureau
    Tier 1 · Captured 2026-11-11 · Open the source

No corrections have been published for this page. Corrections log · Report an error or send a tip on this page