Douglas County,GeorgiaProposedFirst public 2026Last checked Nov 14, 2026

Stream Data CentersOperator

Saved in this browser; see it under My feed. Email alerts are not available yet.

Details confirmed

Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.

3 of 6 details confirmed

  • Confirmed: County
  • Confirmed: Stage
  • Confirmed: First public date
  • Still to confirm: City or address
  • Still to confirm: Capacity
  • Still to confirm: Electric utility
Know the record? Send it to us

What happens next: No upcoming date is on record.

Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.

Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.

Stream Data Centers Atlanta is a proposed data center project in Douglas County, Georgia. Stream Data Centers is named as operator. It was first public in 2026. No site capacity figure is published for this project.

Stream Data Centers Atlanta is a proposed data center project in Douglas County, Georgia. Stream Data Centers is named as operator. No site capacity figure is published for this project. 3 of the six core facts we track for every project are confirmed on this page.

Where this project sits

This project sits in Douglas County, Georgia. Each place page carries the projects tracked there, who provides its power and water, and its local rules.

2Public records we have found

For homeowners

What this project means if you live nearby

We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.

Latest from the newswire

  1. What the record shows · November 28, 2026

    Loudoun County data centers: the complete record

  2. What the record shows · November 22, 2026

    SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days

  3. What the record shows · November 22, 2026

    PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

County outline onlyExact site not confirmed yet. The outline shows Douglas County, Georgia.See every project on the map

The land, to scale

One football field
274 acres, about 207 football fields. Drawn as a square for scale; the real shape is not known.

Timeline

  1. · Stage changeStream Data Centers Atlanta: Operating to Proposed
  2. · New projectFirst public record of Stream Data Centers AtlantaProposed

Laws and bills that may apply here

Found by each bill's own place and size rules. Each one says who has checked it so far.

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Georgia HB 1063: Requires utility contracts shielding other customers from data center costs

    The act covers data centers with a peak annual electricity demand of 100 megawatts or greater, under agreements with an electric utility entered into on or after the effective date of the act; this project has no capacity figure on record, but the project's peak annual electricity demand and the date of its electric service agreement is not on record. Status part: the bill's status (House Passed/Adopted By Substitute) means its text is not yet operative law, and the text part below is read from the bill as passed one chamber. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.

    “As used in this part, the term 'data center' means a facility, campus of facilities, or array of interconnected facilities used by an entity or other business enterprise to operate, manage, or maintain a computer, group of computers, or other organized assembly of hardware and software for the primary purpose of processing, storing, retrieving, or transmitting data and that have a peak annual electricity demand of 100 megawatts or greater.” (Section 1, new Code Section 46-3-80)

    Rule checks: Project is in Georgia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Georgia SB 410: Ends new data center tax breaks, sets large load contract terms

    The act covers large load customers with an expected total peak demand of 100 megawatts or greater at premises on one tract or contiguous tracts of land, under contracts entered into on or after the effective date of the act; this project has no capacity figure on record, but the project's expected total peak demand and the date of its electric service contract is not on record. Status part: the bill's status (Senate Passed/Adopted By Substitute) means its text is not yet operative law, and the text part below is read from the bill as passed one chamber. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.

    “As used in this Code section, the term 'large load customer' means customers with an expected total peak demand of 100 megawatts or greater at one or more premises located on one tract or contiguous tracts of land.” (Part I, Section 1-2, new Code Section 46-2-25.4(a))

    Rule checks: Project is in Georgia. Still to check: size: unknown, who it covers: not checked

Bills and laws in Georgia

All 14 in Bill Watch

Who's involved

Public records

2 records found so far. 8 kinds of record are still being collected.

See every record

Questions people ask

Where is Stream Data Centers Atlanta?
Stream Data Centers Atlanta is a data center project in Douglas County, Georgia.
Who operates Stream Data Centers Atlanta?
Stream Data Centers is named as the operator of Stream Data Centers Atlanta.
How big is Stream Data Centers Atlanta?
The site covers 274 acres.
What stage is Stream Data Centers Atlanta?
Stream Data Centers Atlanta is proposed. It was first public in 2026.

Sources

Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.

  1. 1
    Staff report for special use permit application S2025-13 (March 3 2026 meeting)
    Douglas County Georgia
    Tier 1 · Captured 2026-11-08 · Open the source
  2. 2
    Board of Commissioners minutes June 17 2025
    Douglas County Georgia
    Tier 1 · Captured 2026-11-08 · Open the source
  3. 3
    Stream Data Centers data center locations (operator’s own list)
    Stream Data Centers
    Tier 2 · Captured 2026-11-10 · Open the source
  4. 4
    Stream Data Centers Locations
    Stream Data Centers
    Tier 4 · Captured 2026-11-08 · Open the source
  5. 5
    Stream Data Center Development, DRI #4334, Traffic Impact Study (March 6, 2025)
    A&R Engineering Inc for Stream Data Centers (filed with the Georgia Department of Community Affairs; held by the Atlanta Regional Commission)
    Tier 1 · Captured 2026-11-14 · Open the source

No corrections have been published for this page. Corrections log · Report an error or send a tip on this page