Data centers in Cartersville, Georgia
Draft research: figures were traced to their sources by an AI research agent and have not passed verification yet.
Data Center Fact Check tracks 2 data center projects in Cartersville, Georgia as of November 2026: 1 in permitting and 1 under construction, totaling about 200 MW announced where a figure is published.
Cartersville has 2 tracked data centers. Their announced capacity totals about 200 MW where a figure is published. Of those, 1 in permitting and 1 under construction. The projects here are DataBank Project Indo and Switch KEEP 2.0 Atlanta North. Every figure comes from the public record linked on this page.
Data center projects in Cartersville
- DataBank Project Indo
In permittingCartersville200 MW announced
- Switch KEEP 2.0 Atlanta North
Under constructionCartersville
Who serves this place
- Not collected yet.
More places in Bartow County
Cartersville is part of Bartow County.
Nearby places
- Kingston1 data center project tracked
Court cases and commission dockets in Georgia (8)
Bills and laws in Georgia
- SB 410 · Passed one chamber · Mar 6, 2026Ends new data center tax breaks, sets large load contract terms
- SB 34 · Died or failed · Feb 26, 2026Bars shifting data center power costs onto other utility customers
- HB 1387 · Died or failed · Feb 20, 2026Funds homestead exemption from property taxes collected on data centers
- SB 530 · Died or failed · Feb 19, 2026Deposits data center tax collections into a property tax relief fund
- HB 1323 · Died or failed · Feb 18, 2026Requires new data centers to operate as hybrid power facilities
- HB 1063 · Passed one chamber · Feb 17, 2026Requires utility contracts shielding other customers from data center costs
- SB 476 · Died or failed · Feb 12, 2026Ends new data center sales tax exemption certificates statewide
- HB 1059 · Died or failed · Jan 29, 2026Bans new data center permits through 2028, creates impact commission
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
Questions people ask
- How many data centers are in Cartersville?
- Data Center Fact Check tracks 2 data center projects in Cartersville as of November 2026. Of those, 1 in permitting and 1 under construction.
- What is the biggest data center in Cartersville?
- By announced capacity, the biggest data center in Cartersville is DataBank Project Indo, announced at 200 MW. It is in permitting.
- How much power do data centers in Cartersville use?
- The 2 projects tracked in Cartersville have announced about 200 MW of capacity in total, where a figure is published. That is announced capacity, not measured electricity use.
Sources
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "Cartersville." Accessed 2026-11-29. https://datacenterfactcheck.org/places/us-ga-cartersville
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page