Skip to content

County Card

Data centers in Spalding County, Georgia

Draft research: figures were traced to their sources by an AI research agent and have not passed verification yet.

Data Center Fact Check tracks 2 data center projects in Spalding County, Georgia as of November 2026, totaling about 450 MW announced where a figure is published.

Spalding County has 2 tracked data centers. Their announced capacity totals about 450 MW where a figure is published. Of those, 2 proposed. The projects here are 75 South Data Center Campus and Wallace Jackson Data Center Campus. Every figure comes from the public record linked on this page.

2Data center projects we track

Data center projects in Spalding County

Who serves this place

  • Not collected yet.

A data center is proposed in Spalding County

2 projects here are at the announced or proposed stage. Before the hearing, the resident checklist walks through what to check: the proposal's documents, the local rules where you live, the tax agreement, and the recorded votes.

Open the resident checklist

Places in and around Spalding County

Spalding County is part of Georgia.

Nearby places

Court cases and commission dockets in Georgia (8)

Bills and laws in Georgia

All 14 in Bill Watch

Latest from the newswire

  1. What the record shows · November 28, 2026

    Loudoun County data centers: the complete record

  2. What the record shows · November 22, 2026

    SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days

  3. What the record shows · November 22, 2026

    PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

Questions people ask

How many data centers are in Spalding County?
Data Center Fact Check tracks 2 data center projects in Spalding County as of November 2026. Of those, 2 proposed.
What is the biggest data center in Spalding County?
By announced capacity, the biggest data center in Spalding County is 75 South Data Center Campus, announced at 450 MW. It is proposed.
How much power do data centers in Spalding County use?
The 2 projects tracked in Spalding County have announced about 450 MW of capacity in total, where a figure is published. That is announced capacity, not measured electricity use.

Sources

    Cite this page

    Copy this citation when you reuse a figure or a finding from this page.

    Data Center Fact Check. "Spalding County." Accessed 2026-11-29. https://datacenterfactcheck.org/places/us-ga-spalding

    No corrections have been published for this page. Corrections log · Report an error or send a tip on this page