city Card
Data centers in DeKalb, Illinois
Draft research: figures were traced to their sources by an AI research agent and have not passed verification yet.
Data Center Fact Check tracks 1 data center project in DeKalb, Illinois as of November 2026.
DeKalb has 1 tracked data center project. The project here is Meta DeKalb Data Center, operating. Every project we track here is listed below, with the public records behind it. Every figure comes from the public record linked on this page.
Data center projects in DeKalb
- Meta DeKalb Data Center
OperatingDeKalb
Who serves this place
- Not collected yet.
For homeowners
What the projects here mean if you live nearby
Each fact says which way it runs: comes to the community (such as tax paid), comes from the community (such as water or a tax break), or goes both ways. The labels show direction, not whether it is good or bad. How we work
Property tax
The campus pays property tax, with 55 percent of the tax on new construction abated for 20 years per phase under the Enterprise Zone.
Comes to the community
Tax breaks
Three tax deals cover this campus: a 20-year 55 percent property tax abatement, exemptions DCEO estimates at $50 million, and a capped electricity tax.
Comes to the community
Money for schools and services
Meta gives local grants, including $50,000 to the school district for STEM materials in 2022, and partners with NIU on a STEAM studio.
Comes from the community
Electricity bill
ComEd supplies the campus's power; its city electricity tax is capped for 20 years, and Meta reports 372,339 megawatt-hours used in 2024.
Comes to the community
Water
City water serves the campus and the Kishwaukee district takes its wastewater; withdrawals rose from zero in 2021 to 105 million liters in 2024.
Comes to the community
Jobs
The campus supports more than 200 jobs in operation and created more than 1,200 construction jobs, per the Governor's office at the 2023 opening.
Comes from the community
Next door: height, setbacks, noise
Approved as a planned development under a city-approved site plan; its height and setback numbers are in plan sheets the ordinance omits.
Not known yet
Your say
Residents could testify at public hearings in April 2020 before the council approved the annexation, rezoning, and development agreement, each by an 8-0 vote.
How to take part
Tax breaks and payments
2020 · Meta DeKalb Data Center
Municipal electricity tax exemption (City of DeKalb Ordinance 2020-031; Annexation and Development Agreement Section 5.5(a))
The City exempts the percentage of its electricity tax on electricity used or consumed by the project that is necessary to make the effective rate $0.00045 per kWh, for 20 calendar years beginning the first full calendar year that is two years after the project is fully energized; the company pays the City at least $125,000 per year during the exemption.
All tax records for Meta DeKalb Data Center2021 · Meta DeKalb Data Center
Sales and use tax exemptions and credits (20 ILCS 605/605-1025)
Sales and use tax exemptions (and in some cases tax credits) for up to 20 years under a Data Center Investment Program memorandum of understanding entered in 2021; exemption certificates are issued in 5-year renewable terms.
All tax records for Meta DeKalb Data Center2020 · Meta DeKalb Data Center
Property tax abatement (DeKalb County Enterprise Zone, 20 ILCS 655)
55 percent of the property taxes on the increased assessed valuation attributable to new construction is abated, for taxes levied in years 1 through 20 of abatement, for each phase of the project (Ordinance 2020-003, Section 2.F.5).
All tax records for Meta DeKalb Data Center
Court cases and commission dockets in Illinois (3)
Bills and laws in Illinois
- HB 5826 · Filed · Oct 19, 2026Requires hourly energy accounting and clean certificates for covered data centers
- SB 4004 · In committee · May 22, 2026Would create the Data Center Water Transparency and Aquifer Protection Act
- SB 3120 · In committee · May 22, 2026Would tie the state data center incentive to a water stewardship strategy
- SB 3030 · In committee · May 22, 2026Would require cryptocurrency mining facilities to use noise-reduction techniques
- SB 2181 · In committee · May 22, 2026Would require annual energy and water reporting by Illinois data centers
- SB 4016 · In committee · May 22, 2026Would set environmental, water and energy rules for hyperscale data centers
- SB 3761 · In committee · May 22, 2026Requires data center disclosures and creates a clean energy self-direct program
- SB 3830 · In committee · May 22, 2026Would establish the data center self-direct program and related data center provisions
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
Officials we track for DeKalb
The lawmakers and local officials whose recorded jurisdiction is DeKalb, with the bills and votes we have on record for each.
- Bill FinucaneAlderman
- Carolyn MorrisAlderman
- Greg PerkinsAlderman
- Jerry SmithMayor
- Mike VerbicAlderman
- Scott McAdamsAlderman
- Tony FaivreAlderman
- Tracy SmithAlderman
Questions people ask
- How many data centers are in DeKalb?
- Data Center Fact Check tracks 1 data center project in DeKalb as of November 2026.
Sources
- 1Ordinance 2020-003 Amending the Property Tax Abatement Qualifying Criteria and Definitions in the DeKalb County Enterprise Zone
City of DeKalb, IllinoisTier 1 · Open the source - 2Ordinance 2020-023 Approving an Annexation and Development Agreement with Ventus Tech Services, LLC (Project Ventus)
City of DeKalb, IllinoisTier 1 · Open the source - 3Data Center Investment Program 2025 Annual Report
Illinois Department of Commerce and Economic OpportunityTier 1 · Open the source - 4Ordinance 2020-031 Authorizing an Effective Electrical Utility Tax Rate for Electricity Used or Consumed by Ventus Tech Services, LLC (Project Ventus) in the City of DeKalb, Illinois
City of DeKalb, IllinoisTier 1 · Open the source - 5
- 6Governor Pritzker Announces Meta DeKalb Data Center Now Fully Operational
Office of the Governor, State of IllinoisTier 1 · Open the source - 7
- 8DCEO: Facebook Announces $800 Million Investment in Illinois Community for New Data Center (Illinois DCEO release, 2020-06-30, republished)
Illinois Department of Commerce and Economic OpportunityTier 1 · Open the source - 9
- 10Ordinance 2020-026 (Ventus rezoning to PD-I, planned development plans and plat, UDO text amendment)
City of DeKalb, IllinoisTier 1 · Open the source - 11Minutes of the Regular City Council Meeting of April 27, 2020
City of DeKalb, Illinois (Office of the City Clerk)Tier 1 · Open the source - 12Ordinance 2020-025 Approving the Annexation of Certain Property to the City of DeKalb, Illinois for the Ventus Tech Services, LLC
City of DeKalb, IllinoisTier 1 · Open the source
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "DeKalb." Accessed 2026-11-29. https://datacenterfactcheck.org/places/us-il-dekalb-city
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page