T5@Chicago IV Grayslake Campus

Grayslake,Lake County,IllinoisUnder constructionFirst public 2024Last checked Nov 8, 2026

T5Developer and operatorComEdElectric utilityVillage of GrayslakePublic partner

Saved in this browser; see it under My feed. Email alerts are not available yet.

Details confirmed

Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.

6 of 6 details confirmed

  • Confirmed: County
  • Confirmed: City or address
  • Confirmed: Stage
  • Confirmed: Capacity
  • Confirmed: Electric utility
  • Confirmed: First public date
Know the record? Send it to us

What happens next: No upcoming date is on record.

Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.

Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.

T5@Chicago IV Grayslake Campus is a under-construction data center project in Grayslake, Lake County, Illinois. T5 is named as operator. It was first public in 2024. It was announced at 1,200 MW.

T5@Chicago IV Grayslake Campus is an under-construction data center project in Grayslake, Lake County, Illinois. T5 is named as operator. It was announced at 1,200 MW. All six of the core facts we track for every project are confirmed on this page.

Where this project sits

This project sits in Grayslake, Lake County, Illinois. Each place page carries the projects tracked there, who provides its power and water, and its local rules.

1,200 MWAnnounced capacity
3Public records we have found
1Tax agreement on record

For homeowners

What this project means if you live nearby

We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.

Latest from the newswire

  1. What the record shows · November 28, 2026

    Loudoun County data centers: the complete record

  2. What the record shows · November 22, 2026

    SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days

  3. What the record shows · November 22, 2026

    PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

County outline onlyExact site not confirmed yet. The outline shows Lake County, Illinois.See every project on the map

The land, to scale

One football field
160 acres, about 121 football fields. Drawn as a square for scale; the real shape is not known.

Timeline

  1. · Tax dealTax agreement approved: Sales and use tax exemptions and credits (20 ilcs 605/605-1025) for T5@Chicago IV, LPState sales and use tax exemptions on qualifying data center equipment under the Data Center Investment Program (20 ILCS 605/605-1025); exemption certificates run in five-year renewable increments up to 20 years. DCEO estimates the benef...
  2. · New projectFirst public record of T5@Chicago IV Grayslake CampusUnder construction

Bills and laws in Illinois

All 28 in Bill Watch

Who's involved

Power

Capacity, as announced or filed

  • 60 MW · first buildingMay 2024 · it_load
  • 480 MW · May 2024 · what the figure measures is not stated
  • 1,200 MW · Oct 2025 · it_load
  • 1,550 MW · Oct 2025 · grid connection
  • 1,600 MW · Oct 2025 · grid connection

Public records

3 records found so far. 7 kinds of record are still being collected.

See every record

Questions people ask

Where is T5@Chicago IV Grayslake Campus?
T5@Chicago IV Grayslake Campus is a data center project in Grayslake, Lake County, Illinois.
Who operates T5@Chicago IV Grayslake Campus?
T5 is named as the operator of T5@Chicago IV Grayslake Campus.
How big is T5@Chicago IV Grayslake Campus?
T5@Chicago IV Grayslake Campus was announced at 1,200 MW of capacity. The site covers 160 acres.
What stage is T5@Chicago IV Grayslake Campus?
T5@Chicago IV Grayslake Campus is under construction. It was first public in 2024.

Sources

Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.

  1. 1
    Data Center Investment Program 2025 Annual Report
    Illinois Department of Commerce and Economic Opportunity
    Tier 1 · Captured 2026-11-09 · Open the source
  2. 2
    ICC looks to develop consumer protection framework amid increase in large energy demand (press release)
    Illinois Commerce Commission
    Tier 1 · Captured 2026-11-08 · Open the source
  3. 3
    Regulators OK ComEd's plan to increase deposit costs for large-load projects like data centers
    Capitol News Illinois
    Tier 3 · Captured 2026-11-08 · Open the source
  4. 4
    Verified Petition to Intervene of the Citizens Utility Board, ICC Docket No. 26-0364
    Illinois Commerce Commission (docket document)
    Tier 1 · Captured 2026-11-08 · Open the source
  5. 5
    ComEd customers could be on hook for billions in data center-related costs, according to consumer advocates' review of utility's records
    Citizens Utility Board
    Tier 4 · Captured 2026-11-08 · Open the source
  6. 6
    T5 @ Chicago IV FAQ Sheet
    Village of Grayslake
    Tier 1 · Captured 2026-11-08 · Open the source
  7. 7
    T5 plans five gigawatt-scale data center campuses, announces Chicago campus
    Data Center Dynamics
    Tier 3 · Captured 2026-11-08 · Open the source
  8. 8
    Data Center Could Be Largest Lake County, Ill., Development
    Chicago Tribune (via Government Technology)
    Tier 3 · Captured 2026-11-08 · Open the source
  9. 9
    EIA Form 861, Service Territory file, 2025 (final)
    U.S. Energy Information Administration
    Tier 1 · Captured 2026-11-11 · Open the source · Archived copy

No corrections have been published for this page. Corrections log · Report an error or send a tip on this page