Data centers in Alaska
Draft research: figures were traced to their sources by an AI research agent and have not passed verification yet.
Data Center Fact Check tracks 4 data center projects in Alaska as of November 2026: 2 proposed and 2 operating, totaling about 120 MW announced where a figure is published.
Alaska has 4 tracked data centers. Their announced capacity totals about 120 MW where a figure is published. Of those, 2 proposed and 2 operating. Every project we track here is listed below, with the public records behind it. Every figure comes from the public record linked on this page.
Data center projects in Alaska
- Far North Digital Prudhoe Bay Data Center
Proposed120 MW announced
- GCI Anchorage Data Center
OperatingAnchorage
- Greensparc Cordova Data Center
OperatingCordova
- Stak Energy North Slope Data Center (proposed)
Proposed
Who serves this place
- Not collected yet.
Counties and cities in Alaska
Counties
- Anchorage Municipality1 data center project tracked
- Chugach Census Area1 data center project tracked
- North Slope Borough2 data center projects tracked
Tax breaks and payments
2025 · Greensparc Cordova Data Center
AIDEA term loan, Resolution G25-03 (state development finance; a loan, not a tax abatement)
$17 million five-year term loan to finance Greensparc's equipment purchase for its Cordova deployment of 256 GPUs, fully amortizing and sized on the deployment's revenues, taking advantage of excess green power produced by Cordova Electric Cooperative.
All tax records for Greensparc Cordova Data Center
Recent cases and dockets in Alaska
- Utility commission · Pending before the commissionRegulatory reform for electric utilities: Alaska Power & Telephone comments proposing incremental and marginal cost rates for priority industries, including data centers
Bills and laws in Alaska
- HB 259 · Died or failed · May 20, 2026Sets utility rate and community benefit rules for large energy users
- SB 250 · Died or failed · May 16, 2026Requires utility contracts and cost assignment for data center service
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
Officials we track for Alaska
The lawmakers and local officials whose recorded jurisdiction is Alaska, with the bills and votes we have on record for each.
- Donna MearsState Representative · 21
- Löki Gale TobinState Senator · I
Questions people ask
- How many data centers are in Alaska?
- Data Center Fact Check tracks 4 data center projects in Alaska as of November 2026. Of those, 2 proposed and 2 operating.
- What is the biggest data center in Alaska?
- By announced capacity, the biggest data center in Alaska is Far North Digital Prudhoe Bay Data Center, announced at 120 MW. It is proposed.
- How much power do data centers in Alaska use?
- The 4 projects tracked in Alaska have announced about 120 MW of capacity in total, where a figure is published. That is announced capacity, not measured electricity use.
Sources
- 1AIDEA Board Meeting Minutes, June 17, 2025 (Resolution G25-03, Greensparc term loan)
Alaska Industrial Development and Export AuthorityTier 1 · Open the source
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "Alaska." Accessed 2026-11-29. https://datacenterfactcheck.org/places/us-ak
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page