Data Center Fact Check tracks 2 data center projects in North Slope Borough, Alaska as of November 2026, totaling about 120 MW announced where a figure is published.
North Slope Borough has 2 tracked data centers. Their announced capacity totals about 120 MW where a figure is published. Of those, 2 proposed. The projects here are Far North Digital Prudhoe Bay Data Center and Stak Energy North Slope Data Center (proposed). Every figure comes from the public record linked on this page.
Data center projects in North Slope Borough
- Far North Digital Prudhoe Bay Data Center
Proposed120 MW announced
- Stak Energy North Slope Data Center (proposed)
Proposed
Who serves this place
- Not collected yet.
A data center is proposed in North Slope Borough
2 projects here are at the announced or proposed stage. Before the hearing, the resident checklist walks through what to check: the proposal's documents, the local rules where you live, the tax agreement, and the recorded votes.
Places in and around North Slope Borough
North Slope Borough is part of Alaska.
Nearby places
- Anchorage Municipality1 data center project tracked
- Chugach Census Area1 data center project tracked
Court cases and commission dockets in Alaska (1)
Bills and laws in Alaska
- HB 259 · Died or failed · May 20, 2026Sets utility rate and community benefit rules for large energy users
- SB 250 · Died or failed · May 16, 2026Requires utility contracts and cost assignment for data center service
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
Questions people ask
- How many data centers are in North Slope Borough?
- Data Center Fact Check tracks 2 data center projects in North Slope Borough as of November 2026. Of those, 2 proposed.
- What is the biggest data center in North Slope Borough?
- By announced capacity, the biggest data center in North Slope Borough is Far North Digital Prudhoe Bay Data Center, announced at 120 MW. It is proposed.
- How much power do data centers in North Slope Borough use?
- The 2 projects tracked in North Slope Borough have announced about 120 MW of capacity in total, where a figure is published. That is announced capacity, not measured electricity use.
Sources
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "North Slope Borough." Accessed 2026-11-29. https://datacenterfactcheck.org/places/us-ak-north-slope
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page