Data Center Fact Check tracks 2 data center projects in North Slope Borough, Alaska as of November 2026, totaling about 120 MW announced where a figure is published.

North Slope Borough has 2 tracked data centers. Their announced capacity totals about 120 MW where a figure is published. Of those, 2 proposed. The projects here are Far North Digital Prudhoe Bay Data Center and Stak Energy North Slope Data Center (proposed). Every figure comes from the public record linked on this page.

2Data center projects we track

Data center projects in North Slope Borough

Who serves this place

  • Not collected yet.

A data center is proposed in North Slope Borough

2 projects here are at the announced or proposed stage. Before the hearing, the resident checklist walks through what to check: the proposal's documents, the local rules where you live, the tax agreement, and the recorded votes.

Open the resident checklist

Places in and around North Slope Borough

North Slope Borough is part of Alaska.

Nearby places

Court cases and commission dockets in Alaska (1)

Bills and laws in Alaska

Open Bill Watch

Latest from the newswire

  1. What the record shows · November 28, 2026

    Loudoun County data centers: the complete record

  2. What the record shows · November 22, 2026

    SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days

  3. What the record shows · November 22, 2026

    PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

Questions people ask

How many data centers are in North Slope Borough?
Data Center Fact Check tracks 2 data center projects in North Slope Borough as of November 2026. Of those, 2 proposed.
What is the biggest data center in North Slope Borough?
By announced capacity, the biggest data center in North Slope Borough is Far North Digital Prudhoe Bay Data Center, announced at 120 MW. It is proposed.
How much power do data centers in North Slope Borough use?
The 2 projects tracked in North Slope Borough have announced about 120 MW of capacity in total, where a figure is published. That is announced capacity, not measured electricity use.

Sources

    Cite this page

    Copy this citation when you reuse a figure or a finding from this page.

    Data Center Fact Check. "North Slope Borough." Accessed 2026-11-29. https://datacenterfactcheck.org/places/us-ak-north-slope

    No corrections have been published for this page. Corrections log · Report an error or send a tip on this page