North Slope Borough,AlaskaProposedFirst public 2026Filing entity: Stak EnergyLast checked Nov 10, 2026
Stak EnergyDeveloper and operator
Details confirmed
Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.
3 of 6 details confirmed
- Confirmed: County
- Confirmed: Stage
- Confirmed: First public date
- Still to confirm: City or address
- Still to confirm: Capacity
- Still to confirm: Electric utility
What happens next: No upcoming date is on record.
Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.
Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.
Stak Energy North Slope Data Center (proposed) is a proposed data center project in North Slope Borough, Alaska. Stak Energy is named as operator. It was first public in 2026. No site capacity figure is published for this project.
Stak Energy North Slope Data Center (proposed) is a proposed data center project in North Slope Borough, Alaska. Stak Energy is named as operator. No site capacity figure is published for this project. 3 of the six core facts we track for every project are confirmed on this page.
Where this project sits
This project sits in North Slope Borough, Alaska. Each place page carries the projects tracked there, who provides its power and water, and its local rules.
For homeowners
What this project means if you live nearby
We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
The land, to scale
Timeline
- · DecisionAlaska Department of Natural Resources, Division of Oil and Gas: Preliminary Decision proposing a 50-year negotiated lease of state land to STAK Energy Corporation under AS 38.05.070(d) for the STAK Energy Campus. The comment period was later extended to July 17, 2026; no final decision had issue...ADL 422741
- · FilingFiled with Alaska Department of Natural Resources, Division of Oil and Gas for Stak Energy North Slope Data Center (proposed)ADL 422741
- · New projectFirst public record of Stak Energy North Slope Data Center (proposed)Proposed
Bills and laws in Alaska
- HB 259 · Died or failed · May 20, 2026Sets utility rate and community benefit rules for large energy users
- SB 250 · Died or failed · May 16, 2026Requires utility contracts and cost assignment for data center service
Who's involved
- Developer and operatorStak Energy
From the filings
Numbers stated in permits, agreements, and decisions, as printed. Each links to the filing.
Alaska Department of Natural Resources, Division of Oil and Gas, ADL 422741
- Stated in the filing
- $500 million
- Stated in the filing
- 715.4 acres
- Stated in the filing
- 640 acres
- Stated in the filingEstimated
- 1000-3000 MWThe decision states the campus's natural-gas-fired generation is designed to produce 1-3 GW, fully behind the meter. This is a design range for on-site generation, not a stated fleet total, so it is rowed as a document fact only and no project_capacity row is written.
- Stated in the filing
- 60 jobs
Public records
1 records found so far. 8 kinds of record are still being collected.
See every recordQuestions people ask
- Where is Stak Energy North Slope Data Center (proposed)?
- Stak Energy North Slope Data Center (proposed) is a data center project in North Slope Borough, Alaska.
- Who operates Stak Energy North Slope Data Center (proposed)?
- Stak Energy is named as the operator of Stak Energy North Slope Data Center (proposed).
- How big is Stak Energy North Slope Data Center (proposed)?
- The site covers 640 acres.
- What stage is Stak Energy North Slope Data Center (proposed)?
- Stak Energy North Slope Data Center (proposed) is proposed. It was first public in 2026.
Sources
Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.
- 1Preliminary Decision ADL 422741: STAK Energy Corporation, proposed land lease for the STAK Energy Campus, North Slope
Alaska Department of Natural Resources, Division of Oil and GasTier 1 · Captured 2026-11-10 · Open the source - 2After Local Zoning: Next Steps for Alaska in Data Center Development
Davis Wright Tremaine LLPTier 2 · Captured 2026-11-08 · Open the source
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page