Project File
Lancium Clean Campus data centers (Crusoe)
Abilene,Taylor County,TexasUnder constructionFirst public 2021Filing entity: LanciumLast checked Nov 13, 2026
CrusoeDeveloper and operatorLanciumDeveloper and sold the landNVIDIAChip and hardware supplierOracleCompute provider
Details confirmed
Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.
6 of 6 details confirmed
- Confirmed: County
- Confirmed: City or address
- Confirmed: Stage
- Confirmed: Capacity
- Confirmed: Electric utility
- Confirmed: First public date
What happens next: No upcoming date is on record.
Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.
Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.
Lancium Clean Campus data centers (Crusoe) is a under-construction data center project in Abilene, Taylor County, Texas. Crusoe is named as operator. It was first public in 2021. It was announced at 1,200 MW.
Lancium Clean Campus data centers (Crusoe) is an under-construction data center project in Abilene, Taylor County, Texas. Crusoe is named as operator. It was announced at 1,200 MW. All six of the core facts we track for every project are confirmed on this page.
Where this project sits
This project sits in Abilene, Taylor County, Texas. Each place page carries the projects tracked there, who provides its power and water, and its local rules.
Lancium Clean Campus video · 1 min 59 sec
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
For homeowners
What this project means if you live nearby
Each fact says which way it runs: comes to the community (such as tax paid), comes from the community (such as water or a tax break), or goes both ways. The labels show direction, not whether it is good or bad. How we work
- Property tax
Reporting on the county deals says Taylor County abates 80 percent of campus property tax for 10 years.
Goes both ways - Tax breaks
Three rounds of county tax agreements cover this campus; the newest was adopted December 16, 2025.
Goes both ways - Money for schools and services
The city development corporation agreed to repay $2.5 million of the campus water and sewer costs.
Goes both ways - Electricity bill
The campus runs 10 gas turbines rated about 360 megawatts for its own power, under a state permit.
Not known yet - Water
The campus buys city water and sewer service; the city covers $2.5 million of those costs under its deal.
Comes from the community - Jobs
Job counts for this campus are not in our records yet.
Not known yet - Next door: height, setbacks, noise
No county setback, noise, or height rule for this campus is in our records.
Not known yet - Your say
Reporting on the county minutes says commissioners approved the newest tax agreements 4 to 1 on December 16, 2025.
How to take part

Timeline
- · DecisionTexas Commission on Environmental Quality: Executive director completed the technical review and prepared a draft permit (preliminary decision); final approval not yet issued (air permit) for Lancium Clean Campus data centers (Crusoe)Permit No. 182126 / PSDTX1688 / GHGPSDTX263
- · Tax dealTax agreement approved: Tax abatement agreement and second tax abatement agreement (chapter 312) for Lancium LLC, Abilene DC 9, LLC, Abilene DC 10, LLC, Abilene DC TPP, LLC
- · VoteTaylor County Commissioners Court voted on Adoption of the resolution approving the Taylor County tax abatement agreements for Lancium Clean Campus phases 9 and 10 and the electricity generation plant (Lancium LLC with Abilene DC 9, DC 10, and DC TPP)1 no, 4 yes
- · Tax dealTax agreement approved: Tax abatement agreements and second tax abatement agreements (chapter 312) for Lancium LLC, Abilene DC 9, LLC, Abilene DC 10, LLC, Abilene DC TPP, LLCThe executed Phase 10 Second Tax Abatement Agreement posted by the city grants an abatement of 75 percent of the taxable value of new improvements and tangible personal property for ten consecutive years, in Reinvestment Zone No. RZ25-1....
- · FilingFiled with Texas Commission on Environmental Quality: air permit for Lancium Clean Campus data centers (Crusoe)Permit No. 182126 / PSDTX1688 / GHGPSDTX263
- · FilingFiled with Texas Commission on Environmental Quality: air permit for Lancium Clean Campus data centers (Crusoe)Permit No. 182126 / PSDTX1688 / GHGPSDTX263
- · DecisionTexas Secretary of State: Texas charter of ABILENE DC 10, LLC (Secretary of State file number 0806231864) for Lancium Clean Campus data centers (Crusoe)0806231864
- · DecisionTexas Secretary of State: Texas charter of ABILENE DC 9, LLC (Secretary of State file number 0806231869) for Lancium Clean Campus data centers (Crusoe)0806231869
Laws and bills that may apply here
Found by each bill's own place and size rules. Each one says who has checked it so far.
- Checked by AI against the bill text, not yet by a person · Nov 29, 2026Texas SB 6: Sets grid connection and cost rules for large loads in Texas
A 1,200 MW grid interconnection at a single Taylor County site in the ERCOT power region is on record and the campus is still expanding, over the 75 MW threshold for new or expanded interconnections.
“The standards must apply only to customers requesting a new or expanded interconnection where the total load at a single site would exceed a demand threshold established by the commission based on the size of loads that significantly impact transmission needs in the ERCOT power region. The commission shall establish a demand threshold of 75 megawatts unless the commission determines that a lower threshold is necessary to accomplish the purposes described by Subsection (b).” (SECTION 2, Utilities Code Sec. 37.0561(c))
Rule checks: Project is in Texas; 1,200 MW on record (not stated), threshold 75 MW (SECTION 2, Utilities Code Sec. 37.0561(c)). Still to check: who it covers: not checked
Bills and laws in Texas
- SB 6 · Signed into law · Jun 20, 2025Sets grid connection and cost rules for large loads in Texas
- SB 2222 · Died or failed · Mar 25, 2025Would exempt data center property and energy equipment from property tax
Who's involved
Power and water
Water, as reported by the operator
Per building per year: anticipated water use for cooling system maintenance and water quality purposes. An anticipated figure stated by the operator, not measured use
- Annual maintenance: 50,000 gal
- Initial fill: 1,000,000 gal
Capacity, as announced or filed
- 200 MW · Phase 1 (initial data center, two buildings)Jul 2024 · what the figure measures is not stated
- 206 MW · Phase 1 (two buildings, as financed)Oct 2024 · what the figure measures is not stated
- 1,200 MW · Campus total (eight buildings)Mar 2025 · what the figure measures is not stated
- 1,200 MW · Campus totalMar 2025 · grid connection
From the filings
Numbers stated in permits, agreements, and decisions, as printed. Each links to the filing.
Texas Commission on Environmental Quality, Standard Permit Registration No. 177263 (Project No. 387309)
- Permitted run hours
- 8,760 hours per year per GE LM2500 turbine
- Generator capacityEstimated
- 360.5 MWOur arithmetic: 5 x 38 MW plus 5 x 34.1 MW. On-site generation nameplate, not data center load; the permit states no combined total.
- Generator capacity
- 34.1 MW per GE LM2500 turbine (site-rated)
- Stated in the filing
- 10 natural gas simple-cycle turbines (5 Titan 350 and 5 GE LM2500)
- Generator capacity
- 38 MW per Titan 350 turbine (site-rated)
Texas Commission on Environmental Quality, Permit No. 182126 / PSDTX1688 / GHGPSDTX263
- Stated in the filing
- 760.33 tons per year of nitrogen oxides (NOx), proposed emissions
- Stated in the filing
- 451.1 tons per year of particulate matter, 10 microns or less (PM10), proposed emissions
- Stated in the filing
- 313.2 tons per year of particulate matter, 2.5 microns or less (PM2.5), proposed emissions
- Stated in the filing
- 815.59 tons per year of volatile organic compounds (VOC), proposed emissions
- Stated in the filing
- 49.77 tons per year of hazardous air pollutants (HAPs), proposed emissions
- Stated in the filing
- 233.9 tons per year of sulfur dioxide (SO2), proposed emissions
- Stated in the filing
- 870.07 tons per year of carbon monoxide (CO), proposed emissions
- Buildings
- 2 buildings (Buildings 9 and 10)
Public records
37 records found so far. 3 kinds of record are still being collected.
- Land and zoning rules4
- Environmental permits3
- Power and utility9
- Tax breaks and payments6
- Votes and minutes2
- Company filings13
Court cases and commission dockets
- Utility commission · Decided · Oct 15, 2026Joint Application of West Texas Solar Project II LLC and Silver Basin Digital Infrastructure LLC for Approval of a Net Metering Arrangement
- Utility commission · Pending before the commission · Oct 8, 2026Joint Application of Willow Springs Wind Farm, LLC and Haskell DC Owner LLC for Approval of a Net Metering Arrangement
- Utility commission · Pending before the commission · Sep 22, 2026SB 6 Implementation
- Utility commission · Decided · Sep 18, 2026Rulemaking to Implement Large Load Interconnection Standards Under PURA 37.0561
- Utility commission · Proposed · Jul 24, 2026Rulemaking to Update Wholesale and IOU Retail Transmission Cost Recovery in the ERCOT Region
- Utility commission · Decided · Mar 26, 2026Rulemaking for Net Metering Arrangements Involving a Large Load Co-Located with an Existing Generation Resource Under PURA 39.169
- Utility commission · Decided · Feb 6, 2026Rulemaking to Establish Large Load Forecasting Criteria Under PURA 37.0561
- Utility commission · Pending before the commission · Jun 20, 2025Large Load Demand Management Service
In the news
Crime Reports: Copper reported stolen from Abilene data center's 'trailer city'
Big Country Homepage (KTAB and KRBC)
Questions people ask
- Where is Lancium Clean Campus data centers (Crusoe)?
- Lancium Clean Campus data centers (Crusoe) is a data center project in Abilene, Taylor County, Texas.
- Who operates Lancium Clean Campus data centers (Crusoe)?
- Crusoe is named as the operator of Lancium Clean Campus data centers (Crusoe).
- How big is Lancium Clean Campus data centers (Crusoe)?
- Lancium Clean Campus data centers (Crusoe) was announced at 1,200 MW of capacity.
- What stage is Lancium Clean Campus data centers (Crusoe)?
- Lancium Clean Campus data centers (Crusoe) is under construction. It was first public in 2021.
Sources
Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.
- 1Technical Review, Standard Permit Registration No. 177263 (Project No. 387309), Longhorn Data Center
Texas Commission on Environmental QualityTier 1 · Captured 2026-11-08 · Open the source - 2Electric Generating Units Air Quality Standard Permit revision authorization letter, Registration No. 177263, Abilene DC 1 LLC (Longhorn Data Center)
Texas Commission on Environmental QualityTier 1 · Captured 2026-11-08 · Open the source - 3Plain Language Summary for New Source Review, Initial Application for Air New Source Review Permit Numbers 182126, GHGPSDTX263 and PSDTX1688, Crusoe Energy Systems LLC (CN606257079), Longhorn Data Center (RN112029061)
Texas Commission on Environmental QualityTier 1 · Captured 2026-11-09 · Open the source - 4Notice of Receipt of Application and Intent to Obtain Air Permit (NORI), Permit 182126 / PSDTX1688 / GHGPSDTX263, Crusoe Energy Systems LLC, Longhorn Data Center Buildings 9 and 10
Texas Commission on Environmental QualityTier 1 · Captured 2026-11-08 · Open the source - 5Taxpayer Records (franchise tax, with Secretary of State file numbers and charter dates)
Texas Comptroller of Public Accounts (data.texas.gov)Tier 1 · Captured 2026-11-08 · Open the source - 6Notice of Application and Preliminary Decision for Air Quality Permits, Proposed Air Quality Permit Numbers 182126, PSDTX1688, and GHGPSDTX263, Crusoe Technologies LLC, Abilene, Taylor County
Texas Commission on Environmental QualityTier 1 · Captured 2026-11-09 · Open the source - 7Commissioners Court Minutes, September 9, 2025
Taylor CountyTier 1 · Captured 2026-11-07 · Open the source - 8Taylor County commissioners approve tax abatement for Lancium, Abilene Reporter-News, December 21, 2021
Abilene Reporter-NewsTier 3 · Captured 2026-11-07 · Open the source - 9Commissioners Court meeting record, December 21, 2021
Taylor CountyTier 1 · Captured 2026-11-07 · Open the source - 10
- 11Commissioners Court Minutes, December 16, 2025
Taylor CountyTier 1 · Captured 2026-11-09 · Open the source - 12DCOA Board Meeting Packet, August 5, 2025
Development Corporation of AbileneTier 1 · Captured 2026-11-07 · Open the source - 13Second Tax Abatement Agreement (Phase 10), City of Abilene, Texas, Lancium LLC and Abilene DC 10, LLC
City of AbileneTier 1 · Captured 2026-11-09 · Open the source - 14Resolution No. 171-2025, City of Abilene, approving Tax Abatement Agreements and Second Tax Abatement Agreements with Lancium, LLC and Abilene DC 1, 3, 4, 5, 6, 7 and 8, LLC (Phases 1-8)
City of AbileneTier 1 · Captured 2026-11-09 · Open the source - 15Second Tax Abatement Agreement (Phase 5), City of Abilene, Texas, Lancium LLC and Abilene DC 5, LLC
City of AbileneTier 1 · Captured 2026-11-09 · Open the source - 16Abilene Ordinance 100-2025, 3rd Amendment to Planned Development District 181
City of Abilene (Municode MuniDocs)Tier 1 · Captured 2026-11-08 · Open the source - 17Abilene Ordinance 56-2025, PDD-181 buffer exhibit amendment
City of Abilene (Municode MuniDocs)Tier 1 · Captured 2026-11-08 · Open the source - 18Abilene Land Development Code, Section 4.2.9.2, Performance Standards Regulating Noise (Table 4-3)
City of Abilene (Municode)Tier 1 · Captured 2026-11-08 · Open the source - 19Abilene Code of Ordinances, Section 20-1, Noise control generally
City of Abilene (Municode)Tier 1 · Captured 2026-11-08 · Open the source - 20Abilene Land Development Code, Section 2.3.4.5, Planned Development (PD) District
City of Abilene (Municode)Tier 1 · Captured 2026-11-08 · Open the source - 21Proposal for Publication of Amendments to 25.192 and 25.193 and New 25.252, Project No. 58000, Item 8
Public Utility Commission of TexasTier 1 · Captured 2026-11-07 · Open the source - 22Texas Register, Proposed Rules, Title 16 (July 24, 2026 issue)
Texas Secretary of StateTier 1 · Captured 2026-11-07 · Open the source - 23SB 6 Rulemakings Chart
Public Utility Commission of TexasTier 1 · Captured 2026-11-07 · Open the source - 24Senate Bill 6 enrolled bill analysis
Texas Senate Research CenterTier 1 · Captured 2026-11-07 · Open the source - 25Large Load Update, presentation to the House State Affairs Committee
ERCOTTier 1 · Captured 2026-11-07 · Open the source - 26PUCT sets financial commitments for data center interconnection as governor pauses permit approvals
White and Case LLPTier 2 · Captured 2026-11-07 · Open the source - 27PUCT Adopts 16 TAC 25.194: Texas Large Load Financial Security Replaces the Interconnection Fee
SiteBraidTier 3 · Captured 2026-11-07 · Open the source - 28PUCT Interchange filing index, Project or Docket No. 59943
Public Utility Commission of TexasTier 1 · Captured 2026-11-08 · Open the source - 29PUCT Interchange filing index, Project or Docket No. 58317
Public Utility Commission of TexasTier 1 · Captured 2026-11-08 · Open the source - 30PUCT Interchange filing index, Project or Docket No. 59115
Public Utility Commission of TexasTier 1 · Captured 2026-11-08 · Open the source - 31The Development Corporation of Abilene City of Abilene and Taylor County Announce Expanded Development within Lancium's Clean Campus through Crusoe's 998000 Square Foot Data Center Project
Development Corporation of AbileneTier 1 · Captured 2026-11-07 · Open the source - 32Crusoe Expands AI Data Center Campus in Abilene to 1.2 Gigawatts
Crusoe (via GlobeNewswire, on Lancium's site)Tier 4 · Captured 2026-11-07 · Open the source - 33
- 34Crusoe to Build Initial 200MW AI Data Center With Plans to Expand at 1.2 GW Lancium Clean Campus
Crusoe / LanciumTier 4 · Captured 2026-11-08 · Open the source - 35Crusoe, Blue Owl Capital and Primary Digital Infrastructure Enter $3.4 billion Joint Venture for AI Data Center Development
Crusoe / Blue Owl Capital / Primary Digital InfrastructureTier 4 · Captured 2026-11-08 · Open the source - 36
- 37
- 38
- 39Form EIA-861 detailed data files 2023 (Service Territory and Utility Data)
U.S. Energy Information AdministrationTier 1 · Captured 2026-11-07 · Open the source
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page