What it is
Rule 16 TAC 25.205: a net metering arrangement between an existing stand-alone generation resource and a new large load of 75 MW or more needs an ERCOT study and prior Commission approval. ERCOT has 120 days to study the arrangement after it receives the needed information; the Commission then has 60 days to approve, deny, or approve with conditions, including hold-harmless protection against stranded or underutilized transmission assets.
The facts
- Regulator
- Public Utility Commission of Texas
- Docket number
- Project No. 58479
- Type
- Other
- Utility
- AEP Texas North Company
- State
- Texas
- Filed
- Jun 20, 2025
- Status date
- Mar 26, 2026
- Large-load rules
- Yes, for loads of 75 MW or more
Projects served by AEP Texas North Company
Related cases and proceedings
- Utility commission · Pending before the commissionReview of ERCOT's Interconnection Processes for Large Loads
- Utility commission · ProposedRulemaking to Update Wholesale and IOU Retail Transmission Cost Recovery in the ERCOT Region
- Utility commission · DecidedApplication of Crusoe Energy Systems LLC, FGE Goodnight I, LLC, and Ensign Infrastructure LLC for Approval of a Net Metering Arrangement
- Utility commission · DecidedApplication of Crusoe Energy Systems LLC, FGE Goodnight I, LLC, and Ensign Infrastructure LLC for Approval of a Net Metering Arrangement
- Utility commission · DecidedRulemaking to Establish Large Load Forecasting Criteria Under PURA 37.0561
- Utility commission · DecidedApplication of El Paso Electric Company for an Economic Development Rate Rider for a New Data Center to be Located in El Paso, Texas
- Utility commission · Pending before the commissionEvaluation of Transmission Cost Recovery
- Utility commission · Pending before the commissionLarge Load Demand Management Service
In the record
- Utility case, Jun 20, 2025. Utility case filed: Rulemaking for Net Metering Arrangements Involving a Large Load Co-Located with an Existing Generation Resource Under PURA 39.169 Public Utility Commission of Texas, Project No. 58479
Sources
- 1SB 6 Rulemakings Chart
Public Utility Commission of TexasTier 1 · PUCT SB 6 rulemakings chart, row for Project 58479 (adopted March 26, 2026); SB 6 enrolled bill analysis, section on PURA 39.169 (120-day study, 60-day decision) · Open the source - 2Senate Bill 6 enrolled bill analysis
Texas Senate Research CenterTier 1 · PUCT SB 6 rulemakings chart, row for Project 58479 (adopted March 26, 2026); SB 6 enrolled bill analysis, section on PURA 39.169 (120-day study, 60-day decision) · Open the source
Report an error or send a tip on this page
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "Rulemaking for Net Metering Arrangements Involving a Large Load Co-Located with an Existing Generation Resource Under PURA 39.169." Last activity 2026-03-26. Accessed 2026-11-29. https://datacenterfactcheck.org/dockets/utility/proc-puct-58479